Government approves 484 MW wind power project with Adani Green Energy. 1 KWh එක ඩොලර් සත 8.26 ට අවුරුදු 20ක් ගනී

ThimalM™

Well-known member
  • Nov 4, 2010
    3,301
    2,191
    113
    @monson අවජාතක පොන්නයා මේකත් කියවපන්. ඉන්දියාවේ auction වල unit price $0.036 kWh (LKR 10.8)

    https://www.mercomindia.com/juniper-edf-renewables-acme-solarcraft-win-guvnls-auction

    GUVNL-300-MW-Wind-image.png
     

    kingcapton

    Well-known member
  • Sep 28, 2012
    3,192
    4,136
    113
    So $4 cents profit to Adani is acceptable? Let's calculate the profit.

    Yesterday Mannar windpower (100MW) plant generated 1.57 GWh (1,570,000 kWh). Source: https://www.ceb.lk/

    If this is from Adani, just for yesterday we have to pay, 1570000 x USD 0.0826 = USD 129,682.00. For a year (365 days) cost is USD 47.3 Million. For a 486 MW windpower total payment is USD 230 Million.

    The total investment by Adani for the project is $442 million. Source. As per this caluclation within two years enteir cost is covered.


    For 18 years Sri Lankns will pay full profit to Adani which is USD 230 Million x 18 = USD 4,140 Million (LKR 1242 Billion)

    This is why these type of projects must be done by government with funding agencies like ADB.
    එව්වට මොළයක් නෑ.
     

    monson

    Well-known member
  • May 7, 2007
    16,797
    10,561
    113
    So $4 cents profit to Adani is acceptable? Let's calculate the profit.

    Yesterday Mannar windpower (100MW) plant generated 1.57 GWh (1,570,000 kWh). Source: https://www.ceb.lk/

    If this is from Adani, just for yesterday we have to pay, 1570000 x USD 0.0826 = USD 129,682.00. For a year (365 days) cost is USD 47.3 Million. For a 486 MW windpower total payment is USD 230 Million.

    The total investment by Adani for the project is $442 million. Source. As per this caluclation within two years enteir cost is covered.


    For 18 years Sri Lankns will pay full profit to Adani which is USD 230 Million x 18 = USD 4,140 Million (LKR 1242 Billion)

    This is why these type of projects must be done by government with funding agencies like ADB.

    @monson අවජාතක පොන්නයා මේකත් කියවපන්. ඉන්දියාවේ auction වල unit price $0.036 kWh (LKR 10.8)

    https://www.mercomindia.com/juniper-edf-renewables-acme-solarcraft-win-guvnls-auction

    GUVNL-300-MW-Wind-image.png

    @ThimalM™ අවජාතක පොන්නයා​


    ඉන්දියාවේ cost එකට මෙහෙ කරන්න පුලුවන්ද ? 100MW Mannar project "As per the Loan Agreement, the estimated total cost of the Project was US$.256.70 million" - http://auditorgeneral.gov.lk/web/im...v/Mannar-Wind-Power-Generation-Project--E.pdf
    "The Mannar wind power generation project is designed to have an electricity generating capacity of 100 MW, and is estimated by the Ceylon Electricity Board (CEB) to cost $157 million." - 17 May 2017 https://www.adb.org/sites/default/files/project-documents/49345/49345-002-eia-en.pdf

    2024 486 MW එක USD 230 Million කරන්න පුලුවන්ද ?

    $0.036 kWh දුන්නත් අඬයි අවුරුදු 4 කින් Adani project cost එක cover කරගෙන කියල. මුන්ට ඕනේ කොහොමහරි මොන බයිලයක් ගහල හරි වැඩේ වෙන එක නවත්තන්න :lol:
     

    yosh371

    Well-known member
  • Jan 15, 2011
    7,281
    4,022
    113
    Land of Lions
    අනිත් ටිකත් චන්දෙට කලින් ඉක්මණට දෙමු..
    තව දෙන්න තියෙනව ද?
    රනිල්ව දීලා බෙසමක් තමයි ඉල්ල ගන්න වෙන්නේ.
     

    monson

    Well-known member
  • May 7, 2007
    16,797
    10,561
    113
    CEB Mannar wind plant eke unit cost eka 0.0847 USD. ko ara USD satha 4 kiwwa gothaya :lol:
    5:50