Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Handmade Character Soft Toy Bluey Bingo
anil1961
Updated:
Aug 3, 2026
Colombo
Dahua POE Switch 8 Ports (DH-PFS3010-8ET-65)
hashaz2012
Updated:
Aug 3, 2026
Ad icon
Singapore V2Ray VPN for Tunneling
hu KANNA
Updated:
Jul 31, 2026
Dating Website & Online Chat Room
hotvideo
Updated:
Jul 30, 2026
DJI Mini 4 Pro Drone Combo Plus
Hawaka
Updated:
Jul 30, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
ElaKiri.com
News and Updates
මහ ඔය ජල බැටරිය (Pumped Storage Hydropower Project)
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Monkey D Dragon" data-source="post: 31411863" data-attributes="member: 587008"><p>200MW කියන්නේ generation එක . daily limit එක නෙමේ .</p><p></p><p>The Taum Sauk Pumped Storage Plant's upper reservoir system can generate up to<span style="font-size: 22px"> 450 MW </span> of electricity. It operates using two reversible pump-turbine units, each generating 225 MW} of peak capacity to quickly supply the regional electrical grid during high-demand periods.</p><p><strong>Reservoir Capacity Comparison: Taum Sauk Upper Reservoir vs. Victoria Reservoir (Sri Lanka)</strong></p><p></p><table style='width: 100%'><tr><td><strong>Metric</strong></td><td><strong>Taum Sauk Upper Reservoir (USA)</strong></td><td><strong>Victoria Reservoir (Sri Lanka)</strong></td><td><strong>Comparison / Ratio</strong></td></tr><tr><td><strong>Type</strong></td><td>Closed-loop Pumped-Storage Upper Basin</td><td>Conventional Multi-purpose Reservoir</td><td>N/A</td></tr><tr><td><strong>Gross Storage Capacity</strong></td><td>~5.37 million m³ (4,350 acre-feet)</td><td>722 million m³</td><td>Victoria is ~134x larger</td></tr><tr><td><strong>Active Storage Capacity</strong></td><td>~5.37 million m³</td><td>689 million m³</td><td>Victoria is ~128x larger</td></tr><tr><td><strong>Surface Area</strong></td><td>0.22 km² (54.5 acres)</td><td>22.7 km²</td><td>Victoria is ~103x larger</td></tr></table><p></p><p><strong>Daily Generation Limits</strong></p><p></p><p>�</p><table style='width: 100%'><tr><td><strong>Metric</strong></td><td><strong>Taum Sauk Plant</strong></td><td><strong>Victoria Power Station</strong></td></tr><tr><td><strong>Installed Capacity</strong></td><td>210 MW (3 × 70 MW units)</td><td></td></tr><tr><td><strong>Theoretical Daily Limit</strong></td><td>3,600 MWh per full reservoir discharge cycle (8 hours max continuous run at full load).</td><td>5,040 MWh if run continuously at 210 MW for 24 hours.</td></tr><tr><td><strong>Primary Operational Constraints</strong></td><td>High dependency on water volume limitations of upper reservoir (8-hour hard wall per pump cycle).</td><td>Managed around downstream irrigation demands (Mahaweli Authority) and rainfall inflows.</td></tr></table><p></p><p>[td)450 MW (2 × 225 MW units)[/td]</p><p></p><p><strong>Real Generation</strong></p><p></p><table style='width: 100%'><tr><td><strong>Metric</strong></td><td><strong>Taum Sauk Plant</strong></td><td><strong>Victoria Power Station</strong></td></tr><tr><td><strong>Average Annual Output</strong></td><td>Net-negative energy producer due to ~70% round-trip pumping efficiency.</td><td>~780 GWh annually.</td></tr><tr><td><strong>Real Daily Generation</strong></td><td>0 to 3,600 MWh. Typically ranges between 1,800 and 2,250 MWh on active operational days.</td><td>Seasonal variation: Averages 1,000 to 2,300 MWh/day based on annualized metrics; can drop near 0 in droughts or peak during monsoons.</td></tr><tr><td><strong>Grid Load Profile</strong></td><td>Strict arbitrage peaking plant (pumps at night, discharges for 4–5 hours during daytime peaks).</td><td>Peaking plant optimized primarily to sustain the daily evening peak hours (18:30 to 21:30).</td></tr></table><p></p><p><em>Assumption: Real daily generation ranges for Taum Sauk assume standard regional transmission organization (MISO) dispatch schedules where the facility runs 4 to 6 hours during peak afternoon loads.</em></p><p><em></em></p><p><em>Sources: Wikipedia (Taum Sauk Hydroelectric Power Station / Victoria Dam Sri Lanka), Federal Energy Regulatory Commission (FERC) Report, Stanford University Hydroelectric Assessment, Japan International Cooperation Agency (JICA) Victoria Optimization Study, Public Utilities Commission of Sri Lanka (PUCSL) Monthly Generation Reports, US Department of Energy (Hydropower Market Report), Ceylon Electricity Board (CEB) Data Books.</em></p><p></p><p> [MEDIA=youtube]zRM2AnwNY20[/MEDIA]</p><p></p><p> [MEDIA=youtube]XiUOBdEUqjY[/MEDIA]</p></blockquote><p></p>
[QUOTE="Monkey D Dragon, post: 31411863, member: 587008"] 200MW කියන්නේ generation එක . daily limit එක නෙමේ . The Taum Sauk Pumped Storage Plant's upper reservoir system can generate up to[SIZE=6] 450 MW [/SIZE] of electricity. It operates using two reversible pump-turbine units, each generating 225 MW} of peak capacity to quickly supply the regional electrical grid during high-demand periods. [B]Reservoir Capacity Comparison: Taum Sauk Upper Reservoir vs. Victoria Reservoir (Sri Lanka)[/B] [TABLE] [TR] [TD][B]Metric[/B][/TD] [TD][B]Taum Sauk Upper Reservoir (USA)[/B][/TD] [TD][B]Victoria Reservoir (Sri Lanka)[/B][/TD] [TD][B]Comparison / Ratio[/B][/TD] [/TR] [TR] [TD][B]Type[/B][/TD] [TD]Closed-loop Pumped-Storage Upper Basin[/TD] [TD]Conventional Multi-purpose Reservoir[/TD] [TD]N/A[/TD] [/TR] [TR] [TD][B]Gross Storage Capacity[/B][/TD] [TD]~5.37 million m³ (4,350 acre-feet)[/TD] [TD]722 million m³[/TD] [TD]Victoria is ~134x larger[/TD] [/TR] [TR] [TD][B]Active Storage Capacity[/B][/TD] [TD]~5.37 million m³[/TD] [TD]689 million m³[/TD] [TD]Victoria is ~128x larger[/TD] [/TR] [TR] [TD][B]Surface Area[/B][/TD] [TD]0.22 km² (54.5 acres)[/TD] [TD]22.7 km²[/TD] [TD]Victoria is ~103x larger[/TD] [/TR] [/TABLE] [B]Daily Generation Limits[/B] � [TABLE] [TR] [TD][B]Metric[/B][/TD] [TD][B]Taum Sauk Plant[/B][/TD] [TD][B]Victoria Power Station[/B][/TD] [/TR] [TR] [TD][B]Installed Capacity[/B][/TD] [TD]210 MW (3 × 70 MW units)[/TD] [TD][/TD] [/TR] [TR] [TD][B]Theoretical Daily Limit[/B][/TD] [TD]3,600 MWh per full reservoir discharge cycle (8 hours max continuous run at full load).[/TD] [TD]5,040 MWh if run continuously at 210 MW for 24 hours.[/TD] [/TR] [TR] [TD][B]Primary Operational Constraints[/B][/TD] [TD]High dependency on water volume limitations of upper reservoir (8-hour hard wall per pump cycle).[/TD] [TD]Managed around downstream irrigation demands (Mahaweli Authority) and rainfall inflows.[/TD] [/TR] [/TABLE] [td)450 MW (2 × 225 MW units)[/td] [B]Real Generation[/B] [TABLE] [TR] [TD][B]Metric[/B][/TD] [TD][B]Taum Sauk Plant[/B][/TD] [TD][B]Victoria Power Station[/B][/TD] [/TR] [TR] [TD][B]Average Annual Output[/B][/TD] [TD]Net-negative energy producer due to ~70% round-trip pumping efficiency.[/TD] [TD]~780 GWh annually.[/TD] [/TR] [TR] [TD][B]Real Daily Generation[/B][/TD] [TD]0 to 3,600 MWh. Typically ranges between 1,800 and 2,250 MWh on active operational days.[/TD] [TD]Seasonal variation: Averages 1,000 to 2,300 MWh/day based on annualized metrics; can drop near 0 in droughts or peak during monsoons.[/TD] [/TR] [TR] [TD][B]Grid Load Profile[/B][/TD] [TD]Strict arbitrage peaking plant (pumps at night, discharges for 4–5 hours during daytime peaks).[/TD] [TD]Peaking plant optimized primarily to sustain the daily evening peak hours (18:30 to 21:30).[/TD] [/TR] [/TABLE] [I]Assumption: Real daily generation ranges for Taum Sauk assume standard regional transmission organization (MISO) dispatch schedules where the facility runs 4 to 6 hours during peak afternoon loads. Sources: Wikipedia (Taum Sauk Hydroelectric Power Station / Victoria Dam Sri Lanka), Federal Energy Regulatory Commission (FERC) Report, Stanford University Hydroelectric Assessment, Japan International Cooperation Agency (JICA) Victoria Optimization Study, Public Utilities Commission of Sri Lanka (PUCSL) Monthly Generation Reports, US Department of Energy (Hydropower Market Report), Ceylon Electricity Board (CEB) Data Books.[/I] [MEDIA=youtube]zRM2AnwNY20[/MEDIA] [MEDIA=youtube]XiUOBdEUqjY[/MEDIA] [/QUOTE]
Insert quotes…
Verification
Dahaya deken beduwama keeyada?
Post reply
Top
Bottom