Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
ව්යාපාර, Tuition පන්ති සහ Personal Portfolios සඳහා Web Setup එකක් රු. 9,099/- කට (වාර්ෂික renewal ර
thathsilura
Updated:
Thursday at 6:17 PM
AWS Certified Solutions Architect-Associate + AWS Certified Cloud Practitioner
Sanjeewani95
Updated:
Aug 19, 2026
🚀 එක පැකේජ් එකයි - මාසෙටම Unlimited Internet! 🌐
sayuru bandara
Updated:
Aug 18, 2026
🎬 CapCut Pro 1 Month Access! LKR 600
sayuru bandara
Updated:
Aug 18, 2026
🚀 Google One AI PRO Plan (Gemini Pro Activation) – 18 Months Access! LKR 2200
sayuru bandara
Updated:
Aug 18, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
විසිකරණ ආහාර වලින් බයෝගෑස් හදමු
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Mr.Tom" data-source="post: 14874813" data-attributes="member: 462987"><p><strong>අහක දාන කෑම වලින් ගෑස් හදමු</strong></p><p></p><p><span style="color: DarkRed"><span style="font-size: 18px">මුලින්න කියන්න ඕනෙ මම මේගැන හොයන්න හිතුවෙ ඊයෙ මම එලකිරියෙ ජල ඉන්දන හදන්න දන්නවද? කියලා දාපු ත්රෙඩ් එකට එලකිරියේ යාලුවෝ දාලා තිබුන රිප්ලයි නිසා. ඒ නිසා මුලින්න ඒ අයට ගොඩක් ස්තූති වන්ත වෙනවා. </span></span></p><p></p><p><a href="http://www.elakiri.com/forum/showthread.php?t=1550737" target="_blank"> <u><span style="color: Blue">ජල ඉන්දන හදන්න දන්නවද?</span></u> </a></p><p></p><p><span style="color: Blue"><span style="font-size: 18px">පහළ තියෙන විස්තර හම්බවුනේ නෙට් එකෙන්. මේක හදන්න කලින් දන්න අයගෙන් අහන් ඕනෙ හරි යයිද කියලා. එලකිරියේ දන්න කවුරු හරි ඉන්නවනම් විස්තර කියන්න. හැමෝටම ගොඩක් ප්රයෝජනවත් වෙයිනෙ.</span></span></p><p><span style="color: Purple"><span style="font-size: 18px">මේකෙ තියෙන්නෙ ඉවතලන එළවලු වගේ කෑම වර්ග වලින් පොඩියට බයෝගෑස් හදන එක ගැන.</span></span></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11726" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11727" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p>I have been searching for some method of using the food waste, decomposable organic material and kitchen waste efficiently, and came across information on producing bio-gas from organic waste.</p><p></p><p>The bio-gas produced from food waste, decomposable organic material and kitchen waste, consisting of methane and a little amount of carbon di oxide is an alternative fuel for cooking gas (LPG). Also, the waste materials can be disposed off efficiently without any odor or flies and the digested slurry from the bio-gas unit can be used as an organic manure in the garden.</p><p></p><p>Components of the Bio-gas Plant</p><p></p><p>The major components of the bio-gas plant are a digester tank, an inlet for feeding the kitchen waste, gas holder tank, an outlet for the digested slurry and the gas delivery system for taking out and utilizing the produced gas.</p><p></p><p>This project is also useful for students to have a hands-on learning experience in constructing a Mini Bio-Gas Plant, using locally available material.</p><p></p><p>Material Required:</p><p></p><p>1. Empty PVC can 50 ltrs capacity: 1 No. (to be used as Digester Tank)</p><p>2. Empty PVC can 40 ltrs capacity: 1 no. (to be used as Gas Holder Tank) (Make sure the smaller can fits inside larger one and moves freely)</p><p>3. 64 mm dia pvc pipe: about 40 cm long (to be used for feeding waste material)</p><p>4. 32 mm dia pvc pipe: about 50 cm long (fixed inside gas holder tank as a guide pipe)</p><p>5. 25 mm dia pvc pipe: about 75 cm long (fixed inside the digester tank as a guide pipe)</p><p>6. 32 mm dia pvc pipe: about 25 cm long (fixed on digester tank to act as outlet for digested slurry)</p><p>7. M-seal or any water-proof adeshive</p><p>8. Gas outlet system: Please see Step 4 below for required materials and construction</p><p></p><p>Tools required</p><p></p><p>Do not require many tools here. A hack saw blade for cutting the cans & pipes and a sharp knife for cutting holes on the cans are all the tools we need.</p><p></p><p>Additional accessories</p><p></p><p>A single burner bio-gas stove or a Bunsen Burner used in school laboratories</p><p></p><p><span style="color: Red"><span style="font-size: 18px">Step 1</span></span></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11728" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11729" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>Bought this 50 ltrs capacity PVC can, which will act as the digester unit and removed the top portion of the can, by cutting it with a hack saw blade:</p><p><span style="color: Red"><span style="font-size: 18px">Step 2</span></span></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11730" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11731" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p>The smaller white can, which will act as the gas holder fits inside the red one. Here, again removed the top of the white can, also with the help of a hack saw blade:</p><p></p><p><span style="color: Red"><span style="font-size: 18px">Step 3</span></span></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11732" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p>64 mm, 32 mm and 25 mm dia PVC pipes which will be used for feeding the kitchen waste, guide pipe for the gas holder and guide pipe fixed with the digestion chamber respectively. A small piece of 32 mm dia pipe will be used as outlet for the slurry:</p><p></p><p><span style="color: Red"><span style="font-size: 18px">Step 4</span></span></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11733" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>items required for the gas delivery system: got these items from a hardware store</p><p></p><p>1. Ball valve : one no ( to adjust the gas flow)</p><p>2. 'T' joint : one no ( to connect the gas holder and the ball valve)</p><p>3. Cap to block one end of 'T' joint : one no</p><p>4. Coupling or Adapter : one no (to connect vertical end of 'T' in to the gas collector)</p><p>5. Nipple: one no (added to the coupling in to the gas collector)</p><p>6. Gas pipe (flexible) : two meters</p><p>7. Barb : one no (fitted with the gas pipe, to join with the Ball valve)</p><p>8. Clip : one no (used for crimping the barb with the gas pipe and make it leak-proof)</p><p>9. Teflon tape : one roll (used as thread tape in all joints)</p><p></p><p><span style="color: Red"><span style="font-size: 18px">Step 5</span></span></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11734" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11735" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>Here I have marked the cuts to be made in the bottom of the gas collection tank. The smaller hole on the left for gas delivery system, center hole for fixing the 32 mm guide pipe and 64 mm hole for fixing the waste feeding pipe on the right side. Made these holes with the help of a sharp knife and hack saw blade.</p><p></p><p>The next image is Inside of the gas holder showing the 32 mm guide pipe (center) and the 64 mm feeding pipe fixed with M-seal</p><p></p><p></p><p><span style="color: Red"><span style="font-size: 18px">Step 6</span></span></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11736" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p>Top view of the gas holder showing the feeding pipe, central guide pipe and the gas delivery system: I have closed the feeding pipe withe an old lid (red one). This will facilitate opening the feed pipe only during feeding the system.</p><p></p><p><span style="color: Red"><span style="font-size: 18px">Step 7</span></span></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11737" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>Digestion tank fitted with the central guide pipe and the outlet pipe for the slurry:</p><p></p><p><span style="color: Red"><span style="font-size: 18px">Step 8</span></span></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11738" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>Completed unit. I have removed the gas pipe, so that the joints will get cured without any stress:</p><p></p><p>Wait for a day or two before feeding the system, allowing all joints to get cured and become leak-proof.</p><p></p><p>Initially, cow-dung mixed with water will be fed in to the system, which will start the gas formation process. Subsequently, food waste, decomposable organic material and kitchen waste will be diluted with water and used to feed the system. The gas holder will rise along the guide pipes based on the amount of gas produced. We can add some weight on top of the gas holder to increase the gas pressure. When we feed the system, the excess digested slurry will fall out through the outlet pipe, which can be collected, diluted and used as organic manure.</p><p></p><p>Initial production of gas will consist of oxygen, methane, carbon di oxide and some other gases and will not burn. These gases can be released to the atmosphere by opening the ball valve at least three / four times.</p><p></p><p>Subsequent gas will consist of about 70 to 80 percent methane and the rest carbon di oxide, which can be used in a single bio-gas burning stove or a Bunsen burner.</p><p></p><p>Total cost of this proto-type system is about one thousand Indian Rupees (about 20 dollars)</p><p></p><p>This is a basic prototype of a Bio-gas system using the food waste, decomposable organic material and kitchen waste to produce gas. An one thousand litre capacity Digestion tank will be sufficient for a small household for daily cooking purpose. The bigger commercial models provide a water seal between the digestion tank and gas holder tank.</p><p></p><p><span style="color: Red"><span style="font-size: 18px">Step 9</span></span></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11739" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p><img src="http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11740" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><span style="color: Red"><span style="font-size: 18px">Step 10</span></span></p><p>Note for students who are doing this as their School Project:</p><p></p><p>1. Take guidance from your teacher while using the gas in a stove or Bunsen burner.</p><p>2. Collect surplus food and wastage during lunch, dilute and feed the system.</p><p>3. Fruit peels, extracted tea powder, waste milk and milk products can also be used for feeding the system.</p><p>4. DO NOT USE eggshells, Onion peels or left-over bones in this system as they will affect the efficient functioning of the system</p><p>5. Plant some seedling</p><p>6. while feeding, collect the slurry from the outlet, feed the seedlings and watch them grow</p><p></p><p><span style="color: red"><span style="font-size: 22px"><strong>මේක ඉංග්රීසියෙන් තියෙන්නෙ මම නෙට් එකෙන් කොපි කරපු නිසා. මේ ගැන දන්න අයගෙ අදහස් ගොඩක් අගය කර සලකනවා.</strong></span></span></p></blockquote><p></p>
[QUOTE="Mr.Tom, post: 14874813, member: 462987"] [b]අහක දාන කෑම වලින් ගෑස් හදමු[/b] [COLOR="DarkRed"][SIZE="5"]මුලින්න කියන්න ඕනෙ මම මේගැන හොයන්න හිතුවෙ ඊයෙ මම එලකිරියෙ ජල ඉන්දන හදන්න දන්නවද? කියලා දාපු ත්රෙඩ් එකට එලකිරියේ යාලුවෝ දාලා තිබුන රිප්ලයි නිසා. ඒ නිසා මුලින්න ඒ අයට ගොඩක් ස්තූති වන්ත වෙනවා. [/SIZE][/COLOR] [URL="http://www.elakiri.com/forum/showthread.php?t=1550737"] [U][COLOR="Blue"]ජල ඉන්දන හදන්න දන්නවද?[/COLOR][/U] [/URL] [COLOR="Blue"][SIZE="5"]පහළ තියෙන විස්තර හම්බවුනේ නෙට් එකෙන්. මේක හදන්න කලින් දන්න අයගෙන් අහන් ඕනෙ හරි යයිද කියලා. එලකිරියේ දන්න කවුරු හරි ඉන්නවනම් විස්තර කියන්න. හැමෝටම ගොඩක් ප්රයෝජනවත් වෙයිනෙ.[/SIZE][/COLOR] [COLOR="Purple"][SIZE="5"]මේකෙ තියෙන්නෙ ඉවතලන එළවලු වගේ කෑම වර්ග වලින් පොඩියට බයෝගෑස් හදන එක ගැන.[/SIZE][/COLOR] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11726[/IMG] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11727[/IMG] I have been searching for some method of using the food waste, decomposable organic material and kitchen waste efficiently, and came across information on producing bio-gas from organic waste. The bio-gas produced from food waste, decomposable organic material and kitchen waste, consisting of methane and a little amount of carbon di oxide is an alternative fuel for cooking gas (LPG). Also, the waste materials can be disposed off efficiently without any odor or flies and the digested slurry from the bio-gas unit can be used as an organic manure in the garden. Components of the Bio-gas Plant The major components of the bio-gas plant are a digester tank, an inlet for feeding the kitchen waste, gas holder tank, an outlet for the digested slurry and the gas delivery system for taking out and utilizing the produced gas. This project is also useful for students to have a hands-on learning experience in constructing a Mini Bio-Gas Plant, using locally available material. Material Required: 1. Empty PVC can 50 ltrs capacity: 1 No. (to be used as Digester Tank) 2. Empty PVC can 40 ltrs capacity: 1 no. (to be used as Gas Holder Tank) (Make sure the smaller can fits inside larger one and moves freely) 3. 64 mm dia pvc pipe: about 40 cm long (to be used for feeding waste material) 4. 32 mm dia pvc pipe: about 50 cm long (fixed inside gas holder tank as a guide pipe) 5. 25 mm dia pvc pipe: about 75 cm long (fixed inside the digester tank as a guide pipe) 6. 32 mm dia pvc pipe: about 25 cm long (fixed on digester tank to act as outlet for digested slurry) 7. M-seal or any water-proof adeshive 8. Gas outlet system: Please see Step 4 below for required materials and construction Tools required Do not require many tools here. A hack saw blade for cutting the cans & pipes and a sharp knife for cutting holes on the cans are all the tools we need. Additional accessories A single burner bio-gas stove or a Bunsen Burner used in school laboratories [COLOR="Red"][SIZE="5"]Step 1[/SIZE][/COLOR] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11728[/IMG] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11729[/IMG] Bought this 50 ltrs capacity PVC can, which will act as the digester unit and removed the top portion of the can, by cutting it with a hack saw blade: [COLOR="Red"][SIZE="5"]Step 2[/SIZE][/COLOR] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11730[/IMG] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11731[/IMG] The smaller white can, which will act as the gas holder fits inside the red one. Here, again removed the top of the white can, also with the help of a hack saw blade: [COLOR="Red"][SIZE="5"]Step 3[/SIZE][/COLOR] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11732[/IMG] 64 mm, 32 mm and 25 mm dia PVC pipes which will be used for feeding the kitchen waste, guide pipe for the gas holder and guide pipe fixed with the digestion chamber respectively. A small piece of 32 mm dia pipe will be used as outlet for the slurry: [COLOR="Red"][SIZE="5"]Step 4[/SIZE][/COLOR] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11733[/IMG] items required for the gas delivery system: got these items from a hardware store 1. Ball valve : one no ( to adjust the gas flow) 2. 'T' joint : one no ( to connect the gas holder and the ball valve) 3. Cap to block one end of 'T' joint : one no 4. Coupling or Adapter : one no (to connect vertical end of 'T' in to the gas collector) 5. Nipple: one no (added to the coupling in to the gas collector) 6. Gas pipe (flexible) : two meters 7. Barb : one no (fitted with the gas pipe, to join with the Ball valve) 8. Clip : one no (used for crimping the barb with the gas pipe and make it leak-proof) 9. Teflon tape : one roll (used as thread tape in all joints) [COLOR="Red"][SIZE="5"]Step 5[/SIZE][/COLOR] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11734[/IMG] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11735[/IMG] Here I have marked the cuts to be made in the bottom of the gas collection tank. The smaller hole on the left for gas delivery system, center hole for fixing the 32 mm guide pipe and 64 mm hole for fixing the waste feeding pipe on the right side. Made these holes with the help of a sharp knife and hack saw blade. The next image is Inside of the gas holder showing the 32 mm guide pipe (center) and the 64 mm feeding pipe fixed with M-seal [COLOR="Red"][SIZE="5"]Step 6[/SIZE][/COLOR] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11736[/IMG] Top view of the gas holder showing the feeding pipe, central guide pipe and the gas delivery system: I have closed the feeding pipe withe an old lid (red one). This will facilitate opening the feed pipe only during feeding the system. [COLOR="Red"][SIZE="5"]Step 7[/SIZE][/COLOR] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11737[/IMG] Digestion tank fitted with the central guide pipe and the outlet pipe for the slurry: [COLOR="Red"][SIZE="5"]Step 8[/SIZE][/COLOR] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11738[/IMG] Completed unit. I have removed the gas pipe, so that the joints will get cured without any stress: Wait for a day or two before feeding the system, allowing all joints to get cured and become leak-proof. Initially, cow-dung mixed with water will be fed in to the system, which will start the gas formation process. Subsequently, food waste, decomposable organic material and kitchen waste will be diluted with water and used to feed the system. The gas holder will rise along the guide pipes based on the amount of gas produced. We can add some weight on top of the gas holder to increase the gas pressure. When we feed the system, the excess digested slurry will fall out through the outlet pipe, which can be collected, diluted and used as organic manure. Initial production of gas will consist of oxygen, methane, carbon di oxide and some other gases and will not burn. These gases can be released to the atmosphere by opening the ball valve at least three / four times. Subsequent gas will consist of about 70 to 80 percent methane and the rest carbon di oxide, which can be used in a single bio-gas burning stove or a Bunsen burner. Total cost of this proto-type system is about one thousand Indian Rupees (about 20 dollars) This is a basic prototype of a Bio-gas system using the food waste, decomposable organic material and kitchen waste to produce gas. An one thousand litre capacity Digestion tank will be sufficient for a small household for daily cooking purpose. The bigger commercial models provide a water seal between the digestion tank and gas holder tank. [COLOR="Red"][SIZE="5"]Step 9[/SIZE][/COLOR] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11739[/IMG] [IMG]http://www.elakiri.com/forum/picture.php?albumid=2852&pictureid=11740[/IMG] [COLOR="Red"][SIZE="5"]Step 10[/SIZE][/COLOR] Note for students who are doing this as their School Project: 1. Take guidance from your teacher while using the gas in a stove or Bunsen burner. 2. Collect surplus food and wastage during lunch, dilute and feed the system. 3. Fruit peels, extracted tea powder, waste milk and milk products can also be used for feeding the system. 4. DO NOT USE eggshells, Onion peels or left-over bones in this system as they will affect the efficient functioning of the system 5. Plant some seedling 6. while feeding, collect the slurry from the outlet, feed the seedlings and watch them grow [COLOR="red"][SIZE="6"][B]මේක ඉංග්රීසියෙන් තියෙන්නෙ මම නෙට් එකෙන් කොපි කරපු නිසා. මේ ගැන දන්න අයගෙ අදහස් ගොඩක් අගය කර සලකනවා.[/B][/SIZE][/COLOR] [/QUOTE]
Insert quotes…
Verification
Hathara warak wissa keeyada? (Hathara wadi karanna 20)
Post reply
Top
Bottom