Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 20141602" data-attributes="member: 30005"><p><strong>MONORAIL PROJECT: PROPOSALS TO BE PRESENTED TO CABINET</strong></p><p></p><p>BY DARSHANA SANJEEWA </p><p></p><p><img src="http://mirrorcitizen-static.myday.lk/wp-content/uploads/2016/05/s.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>The monorail project between Colombo and Malabe is back on track with the Ministry of Megapolis and Ministry of Transport finalizing the proposal that is to be presented to the Cabinet. Megapolis Authority Director General Lakshman Jayasekara said the proposal was signed by both Ministers and was to be presented to the Cabinet soon. “Once approval is granted we can start construction within nine months and complete the project within three years,” he said. </p><p></p><p>When the Daily Mirror inquired into the project previously, during the 100-day programme, the Transport Ministry said the project was most likely to be scrapped. Transport Minister at the time Ranjith Madduma Bandara said the project was “too expensive” and that the ministry was considering an electric train service. The project which was to be funded initially by the Japan International Cooperation Agency (JICA). The project was aimed to combat the increasing traffic flow in the city and the urban areas. Previous reports stated that USD 55-57 million was the estimated cost per km for the monorail project. Previous media reports stated the rail track would be initiated from Malabe, Talahena, Robert Gunawardena Mawatha, National Hospital, Union Place, World Trade Centre, Colombo Fort and end at Kotahena. In an analysis, JICA said that poor public transportation and road network and the increasing number of vehicles that enter the city were the main cause for rising traffic congestion.</p><p></p><p>- <a href="http://mirrorcitizen.dailymirror.lk/2016/05/03/monorail-project-proposals-to-be-presented-to-cabinet/" target="_blank">http://mirrorcitizen.dailymirror.lk/2016/05/03/monorail-project-proposals-to-be-presented-to-cabinet/</a></p></blockquote><p></p>
[QUOTE="monson, post: 20141602, member: 30005"] [B]MONORAIL PROJECT: PROPOSALS TO BE PRESENTED TO CABINET[/B] BY DARSHANA SANJEEWA [IMG]http://mirrorcitizen-static.myday.lk/wp-content/uploads/2016/05/s.jpg[/IMG] The monorail project between Colombo and Malabe is back on track with the Ministry of Megapolis and Ministry of Transport finalizing the proposal that is to be presented to the Cabinet. Megapolis Authority Director General Lakshman Jayasekara said the proposal was signed by both Ministers and was to be presented to the Cabinet soon. “Once approval is granted we can start construction within nine months and complete the project within three years,” he said. When the Daily Mirror inquired into the project previously, during the 100-day programme, the Transport Ministry said the project was most likely to be scrapped. Transport Minister at the time Ranjith Madduma Bandara said the project was “too expensive” and that the ministry was considering an electric train service. The project which was to be funded initially by the Japan International Cooperation Agency (JICA). The project was aimed to combat the increasing traffic flow in the city and the urban areas. Previous reports stated that USD 55-57 million was the estimated cost per km for the monorail project. Previous media reports stated the rail track would be initiated from Malabe, Talahena, Robert Gunawardena Mawatha, National Hospital, Union Place, World Trade Centre, Colombo Fort and end at Kotahena. In an analysis, JICA said that poor public transportation and road network and the increasing number of vehicles that enter the city were the main cause for rising traffic congestion. - [url]http://mirrorcitizen.dailymirror.lk/2016/05/03/monorail-project-proposals-to-be-presented-to-cabinet/[/url] [/QUOTE]
Insert quotes…
Verification
Dahaya deken beduwama keeyada?
Post reply
Top
Bottom