Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 20277164" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">Rajagiriya flyover to be built in 32 months</span></strong></p><p></p><p>June 13, 2016, 9:52 pm</p><p></p><p>by Maheesha Mudugamuwa</p><p></p><p>The construction work on the proposed Rajagiriya flyover which was officially inaugurated in last week was expected to be completed within 32 months, Higher Education and Highways Minister Lakshman Kiriella said yesterday.</p><p></p><p>Kiriella told The Island that the 534-metre long, four-lane bridge would be the longest in the country.</p><p></p><p>The first phase of the project was expected to be completed by the end of next year and the second stage scheduled to be completed in late 2018, the Minister said.</p><p></p><p>Funds for the project come from a relief credit line established by the Government of Spain. The total cost of the project is estimated at Rs. 4.7 billion.</p><p></p><p>After the completion of the project, the travel time between Nelum Pokuna and Battaramulla would be halved, Minister Kiriella noted.</p><p></p><p>It was estimated that generally more than 100,000 vehicles moved across the Welikada Junction daily, the Minister said.</p><p></p><p>According to the Road Development Authority (RDA), the average speed of a vehicle from Diyatha Uyana Battaramulla to Devi Balika Vidyalaya in Borella was currently about nine kilometres per hour due to heavy traffic congestion, Minister Kiriella said. During peak hours, the speed dropped to about three kilometres per hour, he added.</p><p></p><p>After the construction of the flyover vehicles would be able to ply at a speed of 20 km per hour along the stretch between Diyatha Uyana to Devi Balika Vidyalaya, Minister Kiriella added.</p><p></p><p>The vehicles travelling direct to and from Colombo via Battaramulla could use the proposed flyover at Rajagiriya, the Minister said.</p><p></p><p>In addition, the Highways Ministry stated that the construction work on the Polgahawela and Ganemulla flyovers built under the same Spanish-funded project was already underway at an estimated cost of Rs. 8.4 billion. An interest of 0.15 percent would be charged on 70 percent of the loan while the interest on the balance 30 percent would be 1.95 percent, Minister Kiriella said. The loan is repayable in 40 years with a grace period of four years.</p><p></p><p>- <a href="http://www.island.lk/index.php?page_cat=article-details&page=article-details&code_title=146885" target="_blank">http://www.island.lk/index.php?page_cat=article-details&page=article-details&code_title=146885</a></p></blockquote><p></p>
[QUOTE="monson, post: 20277164, member: 30005"] [B][SIZE="5"]Rajagiriya flyover to be built in 32 months[/SIZE][/B] June 13, 2016, 9:52 pm by Maheesha Mudugamuwa The construction work on the proposed Rajagiriya flyover which was officially inaugurated in last week was expected to be completed within 32 months, Higher Education and Highways Minister Lakshman Kiriella said yesterday. Kiriella told The Island that the 534-metre long, four-lane bridge would be the longest in the country. The first phase of the project was expected to be completed by the end of next year and the second stage scheduled to be completed in late 2018, the Minister said. Funds for the project come from a relief credit line established by the Government of Spain. The total cost of the project is estimated at Rs. 4.7 billion. After the completion of the project, the travel time between Nelum Pokuna and Battaramulla would be halved, Minister Kiriella noted. It was estimated that generally more than 100,000 vehicles moved across the Welikada Junction daily, the Minister said. According to the Road Development Authority (RDA), the average speed of a vehicle from Diyatha Uyana Battaramulla to Devi Balika Vidyalaya in Borella was currently about nine kilometres per hour due to heavy traffic congestion, Minister Kiriella said. During peak hours, the speed dropped to about three kilometres per hour, he added. After the construction of the flyover vehicles would be able to ply at a speed of 20 km per hour along the stretch between Diyatha Uyana to Devi Balika Vidyalaya, Minister Kiriella added. The vehicles travelling direct to and from Colombo via Battaramulla could use the proposed flyover at Rajagiriya, the Minister said. In addition, the Highways Ministry stated that the construction work on the Polgahawela and Ganemulla flyovers built under the same Spanish-funded project was already underway at an estimated cost of Rs. 8.4 billion. An interest of 0.15 percent would be charged on 70 percent of the loan while the interest on the balance 30 percent would be 1.95 percent, Minister Kiriella said. The loan is repayable in 40 years with a grace period of four years. - [url]http://www.island.lk/index.php?page_cat=article-details&page=article-details&code_title=146885[/url] [/QUOTE]
Insert quotes…
Verification
Haya warak paha keeyada? (haya wadi kireema paha)
Post reply
Top
Bottom