Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 20360290" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">$3 billion liquefied natural gas projects lined up at BOI </span></strong></p><p></p><p>Four liquefied natural gas (LNG) projects totalling 2,040 Mega Watts (MW) of power are before the Board of Investment (BOI) and will soon be approved, officials said. “They are British, Indian and two US companies,” an official told the Business Times adding that together these will fetch some US$3 billion. Energy World International Ltd, a British owned company based in Hong Kong specialising in property investment and development, oil and gas exploration, infrastructure and power projects has applied to set up and operate LNG Power Plants with LNG Terminal and Storage Tank (capacity 80,000 cm) complete with offloading facility at Kerawalapitiya total 140MW at Katunayake Export Processing Zone (EPZ) which will be at a 50MW capacity, also at Biyagama EPZ (50MW) and Seethawaka EPZ (40MW) – all totalling an estimated Investment $325 million. Shapoorji Pallonji Group which is a leading engineering, construction and services conglomerate in India, having a footprint in four subcontinents, has submitted a proposal in February to establish three filling stations/ infrastructures with 200 MW capacity.</p><p></p><p>“They have proposed to establish a 0.5 million Metric Tons Per Annum (MMPTA) processing, storage and regasification terminal, supply natural gas for Power Plants and gas stations for automobiles and also to establish a 200 MW (100 MW each in two phases) gas based power plants near Colombo Port,” the official said. Venture Global Power LLC, a US firm currently developing LNG imports and power projects in the Caribbean, Africa and South Asia has proposed to privately finance, develop, design, engineer, construction, commission, insure, own, operate and maintain offshore LNG terminal, storage, degasification terminal facility and a gas-fired combined cycle power plant (500 MW) and under water electrical transmission line and underwater natural gas pipeline at Kerawalapitiya with an investment of $795 million, he said.</p><p></p><p>The official said that Sithe Global Power Ventures (SGPV) a wholly owned subsidiary of Sithe Global Power LLC of the US developing finances and operating large independent power generating facilities of a variety of fuel types throughout the world has proposed to develop an integrated LNG storage and regasification terminal together with a 500 MW natural gas fired combined cycle power generating station (expandable to 1,000 MW). “They also want to develop a natural gas pipeline from Hambantota to Kerawalapitiya along the corridor of the Southern Highway and has identified the Hambantota Port for this operation,” he said adding it’s a $1 billion project.</p><p></p><p>- <a href="http://www.sundaytimes.lk/160703/business-times/3-billion-liquefied-natural-gas-projects-lined-up-at-boi-199085.html" target="_blank">http://www.sundaytimes.lk/160703/business-times/3-billion-liquefied-natural-gas-projects-lined-up-at-boi-199085.html</a></p></blockquote><p></p>
[QUOTE="monson, post: 20360290, member: 30005"] [B][SIZE="5"]$3 billion liquefied natural gas projects lined up at BOI [/SIZE][/B] Four liquefied natural gas (LNG) projects totalling 2,040 Mega Watts (MW) of power are before the Board of Investment (BOI) and will soon be approved, officials said. “They are British, Indian and two US companies,” an official told the Business Times adding that together these will fetch some US$3 billion. Energy World International Ltd, a British owned company based in Hong Kong specialising in property investment and development, oil and gas exploration, infrastructure and power projects has applied to set up and operate LNG Power Plants with LNG Terminal and Storage Tank (capacity 80,000 cm) complete with offloading facility at Kerawalapitiya total 140MW at Katunayake Export Processing Zone (EPZ) which will be at a 50MW capacity, also at Biyagama EPZ (50MW) and Seethawaka EPZ (40MW) – all totalling an estimated Investment $325 million. Shapoorji Pallonji Group which is a leading engineering, construction and services conglomerate in India, having a footprint in four subcontinents, has submitted a proposal in February to establish three filling stations/ infrastructures with 200 MW capacity. “They have proposed to establish a 0.5 million Metric Tons Per Annum (MMPTA) processing, storage and regasification terminal, supply natural gas for Power Plants and gas stations for automobiles and also to establish a 200 MW (100 MW each in two phases) gas based power plants near Colombo Port,” the official said. Venture Global Power LLC, a US firm currently developing LNG imports and power projects in the Caribbean, Africa and South Asia has proposed to privately finance, develop, design, engineer, construction, commission, insure, own, operate and maintain offshore LNG terminal, storage, degasification terminal facility and a gas-fired combined cycle power plant (500 MW) and under water electrical transmission line and underwater natural gas pipeline at Kerawalapitiya with an investment of $795 million, he said. The official said that Sithe Global Power Ventures (SGPV) a wholly owned subsidiary of Sithe Global Power LLC of the US developing finances and operating large independent power generating facilities of a variety of fuel types throughout the world has proposed to develop an integrated LNG storage and regasification terminal together with a 500 MW natural gas fired combined cycle power generating station (expandable to 1,000 MW). “They also want to develop a natural gas pipeline from Hambantota to Kerawalapitiya along the corridor of the Southern Highway and has identified the Hambantota Port for this operation,” he said adding it’s a $1 billion project. - [url]http://www.sundaytimes.lk/160703/business-times/3-billion-liquefied-natural-gas-projects-lined-up-at-boi-199085.html[/url] [/QUOTE]
Insert quotes…
Verification
Hathara warak wissa keeyada? (Hathara wadi karanna 20)
Post reply
Top
Bottom