Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Handmade Character Soft Toy Bluey Bingo
anil1961
Updated:
Monday at 3:55 PM
Colombo
Dahua POE Switch 8 Ports (DH-PFS3010-8ET-65)
hashaz2012
Updated:
Monday at 11:56 AM
Ad icon
Singapore V2Ray VPN for Tunneling
hu KANNA
Updated:
Jul 31, 2026
Dating Website & Online Chat Room
hotvideo
Updated:
Jul 30, 2026
DJI Mini 4 Pro Drone Combo Plus
Hawaka
Updated:
Jul 30, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 20464316" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">Access Engineering wins pilling work in Wetiya, Andarawewa under Southern Expressway Extension Project</span></strong></p><p></p><p><img src="http://static.ft.lk/ftadmin/wp-content/uploads/2016/07/24220605/Untitled-1212.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p><strong><em>Pilling work of the Southern Expressway Extension project ( Section 3 ) – in Progress</em></strong></p><p></p><p>The construction of the Southern Expressway Extension Project was inaugurated recently under three segments from Matara to Hambantota and pilling contract for the segment Wetiya – Andarawewa (15 Km) was awarded to Access Engineering PLC. </p><p></p><p><strong>The proposed Southern Expressway Extension Project which is spearheaded by the Road Development Authority under the Ministry of Higher Education and Highways includes construction of a 96Km road stretch from Matara to Hambantota connecting Hambanota Harbour to Colombo. The project which is funded by Exim Bank of China is to progress under three main sections; Section 1 - Matara to Beliatta (30km), Section 2 – Beliatta to Wetiya (26km) and Section 3 – Wetiya to Andarawewa (15 Km) </strong></p><p></p><p>Pilling work in section 3 Wetiya to Andarawewa was entrusted to Access Engineering PLC by the main contractor China State Construction Engineering Corporate Ltd.; one of the leading construction companies from China. </p><p></p><p>The piling work entrusted to Access Engineering PLC includes construction and testing of 228 No. of cast-in-situ piles of 1500mm and 1800mm in diameter which will be driven up to hard rock. And these piles support superstructures of the Walave River Bridge, Sooriyawewa Interchange Bridge, Wetiya Interchange Bridge and five other overpass bridges. A comprehensive fleet of BG pilling machines and equipment are in place at site along with specialised expertise by Access Engineering PLC to be deployed for the challenging task ahead. </p><p></p><p>“Part of the project requires piling for the Walave River Bridge where a viaduct traverses across the Walave River. This consists of 19 piers and each pier on the river will require 4 No. 1800 mm diameter piles. Rock socketing will also be needed for each pile to a depth of 8m which will reach the hard bed rock strata. Thus special rock drilling techniques will be employed to anchor the bridge piers to the deep rock. And to make the activities further challenging, the flood level of the Walawe River is expected to rise up to 3m during the course of the project. ” said the Project Manager of pilling works of southern Expressway Extension Project (Section 3) Pivithiri Jayasinghe. </p><p></p><p>- <a href="http://www.ft.lk/article/557073/Access-Engineering-wins-pilling-work-in-Wetiya---Andarawewa-under-Southern-Expressway-Extension-Project" target="_blank">http://www.ft.lk/article/557073/Access-Engineering-wins-pilling-work-in-Wetiya---Andarawewa-under-Southern-Expressway-Extension-Project</a></p><p></p><p><img src="http://www.accessengsl.com/wp-content/uploads/2016/07/Picture24.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://www.accessengsl.com/wp-content/uploads/2016/07/Picture25.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://www.accessengsl.com/wp-content/uploads/2016/07/Picture26.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://www.accessengsl.com/wp-content/uploads/2016/07/Picture27.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://www.accessengsl.com/wp-content/uploads/2016/07/Picture28.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://www.accessengsl.com/wp-content/uploads/2016/07/Picture29.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://www.accessengsl.com/wp-content/uploads/2016/07/Picture22-2.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p></blockquote><p></p>
[QUOTE="monson, post: 20464316, member: 30005"] [B][SIZE="5"]Access Engineering wins pilling work in Wetiya, Andarawewa under Southern Expressway Extension Project[/SIZE][/B] [IMG]http://static.ft.lk/ftadmin/wp-content/uploads/2016/07/24220605/Untitled-1212.jpg[/IMG] [B][I]Pilling work of the Southern Expressway Extension project ( Section 3 ) – in Progress[/I][/B] The construction of the Southern Expressway Extension Project was inaugurated recently under three segments from Matara to Hambantota and pilling contract for the segment Wetiya – Andarawewa (15 Km) was awarded to Access Engineering PLC. [B]The proposed Southern Expressway Extension Project which is spearheaded by the Road Development Authority under the Ministry of Higher Education and Highways includes construction of a 96Km road stretch from Matara to Hambantota connecting Hambanota Harbour to Colombo. The project which is funded by Exim Bank of China is to progress under three main sections; Section 1 - Matara to Beliatta (30km), Section 2 – Beliatta to Wetiya (26km) and Section 3 – Wetiya to Andarawewa (15 Km) [/B] Pilling work in section 3 Wetiya to Andarawewa was entrusted to Access Engineering PLC by the main contractor China State Construction Engineering Corporate Ltd.; one of the leading construction companies from China. The piling work entrusted to Access Engineering PLC includes construction and testing of 228 No. of cast-in-situ piles of 1500mm and 1800mm in diameter which will be driven up to hard rock. And these piles support superstructures of the Walave River Bridge, Sooriyawewa Interchange Bridge, Wetiya Interchange Bridge and five other overpass bridges. A comprehensive fleet of BG pilling machines and equipment are in place at site along with specialised expertise by Access Engineering PLC to be deployed for the challenging task ahead. “Part of the project requires piling for the Walave River Bridge where a viaduct traverses across the Walave River. This consists of 19 piers and each pier on the river will require 4 No. 1800 mm diameter piles. Rock socketing will also be needed for each pile to a depth of 8m which will reach the hard bed rock strata. Thus special rock drilling techniques will be employed to anchor the bridge piers to the deep rock. And to make the activities further challenging, the flood level of the Walawe River is expected to rise up to 3m during the course of the project. ” said the Project Manager of pilling works of southern Expressway Extension Project (Section 3) Pivithiri Jayasinghe. - [url]http://www.ft.lk/article/557073/Access-Engineering-wins-pilling-work-in-Wetiya---Andarawewa-under-Southern-Expressway-Extension-Project[/url] [IMG]http://www.accessengsl.com/wp-content/uploads/2016/07/Picture24.jpg[/IMG] [IMG]http://www.accessengsl.com/wp-content/uploads/2016/07/Picture25.jpg[/IMG] [IMG]http://www.accessengsl.com/wp-content/uploads/2016/07/Picture26.jpg[/IMG] [IMG]http://www.accessengsl.com/wp-content/uploads/2016/07/Picture27.jpg[/IMG] [IMG]http://www.accessengsl.com/wp-content/uploads/2016/07/Picture28.jpg[/IMG] [IMG]http://www.accessengsl.com/wp-content/uploads/2016/07/Picture29.jpg[/IMG] [IMG]http://www.accessengsl.com/wp-content/uploads/2016/07/Picture22-2.jpg[/IMG] [/QUOTE]
Insert quotes…
Verification
Hath warak paha keeyada? (hatha wadikireema paha)
Post reply
Top
Bottom