Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 20629399" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">Rajagiriya over-pass slashes time between economic and political capitals :</span></strong></p><p><strong><span style="font-size: 18px">Faster twin-city commuting </span></strong></p><p></p><p>by Anurangi Singh</p><p></p><p>The Rajagiriya road overpass now under construction will bring the twin cities of Colombo and Sri Jayavardhanapura closer. The 4-lane overpass will enable fast commuting between the old commercial capital, Colombo and the rapidly-growing political capital, Sri Jayavardhanapura by 2018.</p><p></p><p style="text-align: center"><img src="http://www.sundayobserver.lk/2016/09/04/z_p-14-Faster-02.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>Phase 1 of the overpass construction, with a length of 533 metres, has commenced work along the A0 road between Colombo and Sri JAyavardhanapura at the Rajagiriya/Welikada junction, and will be concluded by December 2018.Explaining the project, the RDA official involved with the project said that under Phase 1 of the project, two lanes from Sri Jayavardhanapura towards Kollupitiya will be constructed over the Rajagiriya/Welikada junction.</p><p></p><p>Under Phase 2, the traffic lanes from Kollupitiya towards Sri Jayavardhanapura will be completed by December 2017. The over-pass will thus hold two lanes both ways, totalling four lanes.The current traffic volume during peak hours exceeding a hundred thousand vehicles a day, at the traffic speed of 2.5 to 3 kilometres per hour is expected to increase to 20 kilometres per hour, when the over-pass is fully constructed and is in use.</p><p></p><p>Once completed it is expected that 60 percent of the active traffic will flow through the over-pass.The Road Development Authority believes, this project would reduce the traffic congestion now prevalent at Sri Jayawardenapura Mawatha, by reducing the conflict between the main flows at the Rajagiriya junction among other objectives, such as, curtailing fuel wastage and road traffic accidents. Accordingly, traffic time will be cut down in half.</p><p></p><p>The other benefits expected from the project include, socio economic development, easing traffic congestion, reducing the travel time of road users and vehicle operating costs, increase of road safety and reducing air pollution.</p><p></p><p>Speaking to the Sunday Observer, Welikada Police OIC said that parallel lanes have been made available: "Parallel lanes on both sides of the construction site have been made, from the police station to President's College in Rajagiriya. On the Battaramulla side another lane has been allocated for vehicles that enter Colombo. But, we urge the public to take alternative routes and avoid the traffic during the period of construction, whenever possible," he said.Although the duration of construction for both, Phase 1 and 2, is estimated as two years, i.e. to be completed by December 2018, the Road Development Authority believes the project could be completed much sooner.</p><p></p><p>Funding for this construction is through a concessionary loan given by Spain, of which only 30% needs to be repaid at an interest rate of 1.85% within a period of 13 years. </p><p></p><p style="text-align: center"><img src="http://www.sundayobserver.lk/2016/09/04/z_p-14-Faster-01.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>- <a href="http://www.sundayobserver.lk/2016/09/04/fea08.asp" target="_blank">http://www.sundayobserver.lk/2016/09/04/fea08.asp</a></p></blockquote><p></p>
[QUOTE="monson, post: 20629399, member: 30005"] [B][SIZE="5"]Rajagiriya over-pass slashes time between economic and political capitals : Faster twin-city commuting [/SIZE][/B] by Anurangi Singh The Rajagiriya road overpass now under construction will bring the twin cities of Colombo and Sri Jayavardhanapura closer. The 4-lane overpass will enable fast commuting between the old commercial capital, Colombo and the rapidly-growing political capital, Sri Jayavardhanapura by 2018. [CENTER][IMG]http://www.sundayobserver.lk/2016/09/04/z_p-14-Faster-02.jpg[/IMG][/CENTER] Phase 1 of the overpass construction, with a length of 533 metres, has commenced work along the A0 road between Colombo and Sri JAyavardhanapura at the Rajagiriya/Welikada junction, and will be concluded by December 2018.Explaining the project, the RDA official involved with the project said that under Phase 1 of the project, two lanes from Sri Jayavardhanapura towards Kollupitiya will be constructed over the Rajagiriya/Welikada junction. Under Phase 2, the traffic lanes from Kollupitiya towards Sri Jayavardhanapura will be completed by December 2017. The over-pass will thus hold two lanes both ways, totalling four lanes.The current traffic volume during peak hours exceeding a hundred thousand vehicles a day, at the traffic speed of 2.5 to 3 kilometres per hour is expected to increase to 20 kilometres per hour, when the over-pass is fully constructed and is in use. Once completed it is expected that 60 percent of the active traffic will flow through the over-pass.The Road Development Authority believes, this project would reduce the traffic congestion now prevalent at Sri Jayawardenapura Mawatha, by reducing the conflict between the main flows at the Rajagiriya junction among other objectives, such as, curtailing fuel wastage and road traffic accidents. Accordingly, traffic time will be cut down in half. The other benefits expected from the project include, socio economic development, easing traffic congestion, reducing the travel time of road users and vehicle operating costs, increase of road safety and reducing air pollution. Speaking to the Sunday Observer, Welikada Police OIC said that parallel lanes have been made available: "Parallel lanes on both sides of the construction site have been made, from the police station to President's College in Rajagiriya. On the Battaramulla side another lane has been allocated for vehicles that enter Colombo. But, we urge the public to take alternative routes and avoid the traffic during the period of construction, whenever possible," he said.Although the duration of construction for both, Phase 1 and 2, is estimated as two years, i.e. to be completed by December 2018, the Road Development Authority believes the project could be completed much sooner. Funding for this construction is through a concessionary loan given by Spain, of which only 30% needs to be repaid at an interest rate of 1.85% within a period of 13 years. [CENTER][IMG]http://www.sundayobserver.lk/2016/09/04/z_p-14-Faster-01.jpg[/IMG][/CENTER] - [url]http://www.sundayobserver.lk/2016/09/04/fea08.asp[/url] [/QUOTE]
Insert quotes…
Verification
Awruddata maasa keeyada?
Post reply
Top
Bottom