Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 21012269" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">BOT system for two elevated highways</span></strong></p><p></p><p>The Government has dropped a plan to obtain a loan from a Japanese bank to construct an elevated highway in the suburbs of Colombo and instead is to go in for a Build Operate and Transfer (BOT) basis project. Under the proposed plan, talks were underway with the Japan Mitsubishi Bank for the construction of a 10.4 km-long elevated highway between Rajagiriya and Athurugiriya and a 6.9km long elevated highway from Rajagiriya to Dematagoda, but was dropped due to the high cost, Road Development Authority (RDA) Chairman Nihal Suriyaarachchi said.</p><p></p><p>He said the BOT system was more beneficial as it would reduce the loan-repayment burden on the Government and it would not have to set targets to raise funds.</p><p>The project is to be completed within three and a half years after construction begins early next year. According to the plan, vehicles on this elevated highway could travel at 80 kmph and the travel time between Dematagoda to Athurugriya is expected to be 15 minutes.</p><p></p><p>As the next phase of the project another elevated highway will be constructed from Dematagoda to the Port with Asian Development Bank (ADB) funding. The project is to cost about 30 billion. After a 30-year period the ownership of the highway will be taken over by the Sri Lankan Government.</p><p></p><p>- <a href="http://www.sundaytimes.lk/161211/news/bot-system-for-two-elevated-highways-219854.html" target="_blank">http://www.sundaytimes.lk/161211/news/bot-system-for-two-elevated-highways-219854.html</a></p></blockquote><p></p>
[QUOTE="monson, post: 21012269, member: 30005"] [B][SIZE="5"]BOT system for two elevated highways[/SIZE][/B] The Government has dropped a plan to obtain a loan from a Japanese bank to construct an elevated highway in the suburbs of Colombo and instead is to go in for a Build Operate and Transfer (BOT) basis project. Under the proposed plan, talks were underway with the Japan Mitsubishi Bank for the construction of a 10.4 km-long elevated highway between Rajagiriya and Athurugiriya and a 6.9km long elevated highway from Rajagiriya to Dematagoda, but was dropped due to the high cost, Road Development Authority (RDA) Chairman Nihal Suriyaarachchi said. He said the BOT system was more beneficial as it would reduce the loan-repayment burden on the Government and it would not have to set targets to raise funds. The project is to be completed within three and a half years after construction begins early next year. According to the plan, vehicles on this elevated highway could travel at 80 kmph and the travel time between Dematagoda to Athurugriya is expected to be 15 minutes. As the next phase of the project another elevated highway will be constructed from Dematagoda to the Port with Asian Development Bank (ADB) funding. The project is to cost about 30 billion. After a 30-year period the ownership of the highway will be taken over by the Sri Lankan Government. - [url]http://www.sundaytimes.lk/161211/news/bot-system-for-two-elevated-highways-219854.html[/url] [/QUOTE]
Insert quotes…
Verification
Payakata winadi keeyak tibeda?
Post reply
Top
Bottom