Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 21015546" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">60 MW for railway electrification</span></strong></p><p></p><p>The Ministry of Power and Energy confirmed that the power requirement for the proposed electrification of the railways system was a maximum of 60 megawatts (MW).</p><p>The initial phase of introducing the electric train service will be from Veyangoda to Panadura and would require 20 MW. The second phase which concerns the Kelani Valley railway line is to be from Awissawella to Colombo while the third phase, yet unconfirmed but discussed in the steering committee appointed to look into the matter, is proposed to be from Pugoda to Kosgama.</p><p></p><p>The Ministry of Transport and Civil Aviation informed that the Asian Development Bank was presently conducting a feasibility study into the proposed electrification of the railways. The feasibility is to be finished by May next year.</p><p></p><p>Subsequent to this, the next phase would be where projects are prioritized and detailed designs are done, a process which would take a year’s time, Secretary – Ministry of Transport, Nihal Somaweera added. Then contractors for implementation would be looked at and by mid 2018 the project could be commenced, he said.</p><p></p><p>While the project is to tentatively be completed by 2020, depending on the momentum of implementation it could shift to 2021 or 2022.</p><p></p><p>The power requirement for the project has been notified by the Ministry of Transport and Civil Aviation to the Ministry of Power and Energy and the Ceylon Electricity Board, representatives of which are in a steering committee appointed to look into this matter which has to be worked out with consultants.</p><p></p><p>Director (Development) of the Ministry of Power and Energy and Media Spokesman of the Ministry, Sulakshana Jayawardena said that the requirements of the national grid have all been accounted including the demands made by the Ministry of Megapolis and Western Development for their developments, and those of the Ministry of Transport and Civil Aviation and other industries.</p><p></p><p>Our forecasts account for a demand growth of 5% to 6% based on which we implement the long -term power generation plan, he added.</p><p></p><p>“Although there are a few coal power plants in the long-term power generation plan, we plan to move towards renewable energy sources. The first liquefied natural gas power plant will be in 2019, proposals for which have already been sought from developers and contractors. All sources of power generation including even hydro have environmental impacts, which are however comparatively less than coal,” he explained.</p><p></p><p>A separate division would be established within the Department of Railways with regard to the electric railway system.</p><p></p><p>“This is not a new project. The electrification is an attempt to modernize the existing railways system. Other feasibilities too are being done,” Somaweera explained.</p><p></p><p>It has been reported elsewhere that the estimated project cost is USD/$ 625 million and also that the second phase involved Ragama-Negombo while the third involved Maradana-Homagama.</p><p></p><p>- <a href="http://nation.lk/online/2016/12/10/60-mw-for-railway-electrification.html" target="_blank">http://nation.lk/online/2016/12/10/60-mw-for-railway-electrification.html</a></p></blockquote><p></p>
[QUOTE="monson, post: 21015546, member: 30005"] [B][SIZE="5"]60 MW for railway electrification[/SIZE][/B] The Ministry of Power and Energy confirmed that the power requirement for the proposed electrification of the railways system was a maximum of 60 megawatts (MW). The initial phase of introducing the electric train service will be from Veyangoda to Panadura and would require 20 MW. The second phase which concerns the Kelani Valley railway line is to be from Awissawella to Colombo while the third phase, yet unconfirmed but discussed in the steering committee appointed to look into the matter, is proposed to be from Pugoda to Kosgama. The Ministry of Transport and Civil Aviation informed that the Asian Development Bank was presently conducting a feasibility study into the proposed electrification of the railways. The feasibility is to be finished by May next year. Subsequent to this, the next phase would be where projects are prioritized and detailed designs are done, a process which would take a year’s time, Secretary – Ministry of Transport, Nihal Somaweera added. Then contractors for implementation would be looked at and by mid 2018 the project could be commenced, he said. While the project is to tentatively be completed by 2020, depending on the momentum of implementation it could shift to 2021 or 2022. The power requirement for the project has been notified by the Ministry of Transport and Civil Aviation to the Ministry of Power and Energy and the Ceylon Electricity Board, representatives of which are in a steering committee appointed to look into this matter which has to be worked out with consultants. Director (Development) of the Ministry of Power and Energy and Media Spokesman of the Ministry, Sulakshana Jayawardena said that the requirements of the national grid have all been accounted including the demands made by the Ministry of Megapolis and Western Development for their developments, and those of the Ministry of Transport and Civil Aviation and other industries. Our forecasts account for a demand growth of 5% to 6% based on which we implement the long -term power generation plan, he added. “Although there are a few coal power plants in the long-term power generation plan, we plan to move towards renewable energy sources. The first liquefied natural gas power plant will be in 2019, proposals for which have already been sought from developers and contractors. All sources of power generation including even hydro have environmental impacts, which are however comparatively less than coal,” he explained. A separate division would be established within the Department of Railways with regard to the electric railway system. “This is not a new project. The electrification is an attempt to modernize the existing railways system. Other feasibilities too are being done,” Somaweera explained. It has been reported elsewhere that the estimated project cost is USD/$ 625 million and also that the second phase involved Ragama-Negombo while the third involved Maradana-Homagama. - [url]http://nation.lk/online/2016/12/10/60-mw-for-railway-electrification.html[/url] [/QUOTE]
Insert quotes…
Verification
Dawasata paya keeyak thibeda?
Post reply
Top
Bottom