Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 21047359" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">BIA closed during day from January 6 to April 6</span></strong></p><p></p><p>The Bandaranaike International Airport (BIA) will be closed for all operations during the day for three months due to work relating to overlaying of the runway. The BIA will be closed from January 6, 2017 until April 6 for three months from 8.00 a.m. to 4.30 p.m. daily.The BIA has only one runway. Over 950,000 aircraft operations have been carried out since its commissioning three decades ago.</p><p></p><p>The runway was designed and constructed in the mid-80’s to meet the then requirements.</p><p></p><p>During the renovation period, no flights will be operated. All airlines using the BIA have been informed to carry out flights from 4.30 p.m. to 8.00 a.m.</p><p></p><p>No major rehabilitation work had been carried out on the runway after the airport was commissioned.</p><p></p><p>Officials of the International Civil Aviation Organisation recommended an overlaying of the runway to improve runway surface condition for safe operations of aircraft.</p><p><strong></strong></p><p><strong>In line with the overlaying of the existing runway, several airport sector development activities such as overlaying of parallel taxiways, connecting taxiways, design of new rapid exit taxiways (RETs) and by pass taxiways, installation of new airfield ground lighting (AGL) system and modification of existing apron will be carried out.</strong></p><p></p><p>All these moves are being made to handle a further nine million passengers per annum aiming to cater to the ever increasing passenger volume in the region.</p><p></p><p>With the BIA development project being carried out in three stages, the passenger handling capacity of the BIA will be enhanced by further nine million passengers per annum and on completion, the total passenger handling capacity of the airport will be increased to 15 million passengers per annum.</p><p></p><p>- <a href="http://www.dailynews.lk/2016/12/21/local/102564" target="_blank">http://www.dailynews.lk/2016/12/21/local/102564</a></p></blockquote><p></p>
[QUOTE="monson, post: 21047359, member: 30005"] [B][SIZE="5"]BIA closed during day from January 6 to April 6[/SIZE][/B] The Bandaranaike International Airport (BIA) will be closed for all operations during the day for three months due to work relating to overlaying of the runway. The BIA will be closed from January 6, 2017 until April 6 for three months from 8.00 a.m. to 4.30 p.m. daily.The BIA has only one runway. Over 950,000 aircraft operations have been carried out since its commissioning three decades ago. The runway was designed and constructed in the mid-80’s to meet the then requirements. During the renovation period, no flights will be operated. All airlines using the BIA have been informed to carry out flights from 4.30 p.m. to 8.00 a.m. No major rehabilitation work had been carried out on the runway after the airport was commissioned. Officials of the International Civil Aviation Organisation recommended an overlaying of the runway to improve runway surface condition for safe operations of aircraft. [B] In line with the overlaying of the existing runway, several airport sector development activities such as overlaying of parallel taxiways, connecting taxiways, design of new rapid exit taxiways (RETs) and by pass taxiways, installation of new airfield ground lighting (AGL) system and modification of existing apron will be carried out.[/B] All these moves are being made to handle a further nine million passengers per annum aiming to cater to the ever increasing passenger volume in the region. With the BIA development project being carried out in three stages, the passenger handling capacity of the BIA will be enhanced by further nine million passengers per annum and on completion, the total passenger handling capacity of the airport will be increased to 15 million passengers per annum. - [url]http://www.dailynews.lk/2016/12/21/local/102564[/url] [/QUOTE]
Insert quotes…
Verification
Payakata winadi keeyak tibeda?
Post reply
Top
Bottom