Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Cinnamoroll Soft Toy – Cute & Cuddly Plush
anil1961
Updated:
Today at 4:59 AM
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 21383173" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">BIA runway overlay completed</span></strong></p><p></p><p>By Sunimalee Dias</p><p></p><p>Overlay work on the runway at the Bandaranaike International Airport (BIA) was completed ahead of schedule last week but re-opening for all flights would take place as planned on April 6.</p><p></p><p>The airport has been closed during the day (8.30 am to 4.30 pm) since January 6, and opens only at night. When the BIA resumes full operations on April 6, the runway will be able to accommodate A380s since the width of the runway has also been increased to 75 metres from an earlier 60 metres.</p><p></p><p>Airport and Aviation Services Ltd Head of Civil Engineering (Planning and Designs) G. Withanage told the Business Times that they were “nearing completion” adding that “We can do it as per the schedule.” He noted that their target was to complete an operational runway.</p><p></p><p>Though the runway overlay work was completed other aspects of the project like the taxiway needed to be completed and the air operation area would conclude today (Sunday), Mr. Withanage said.</p><p></p><p>The work was carried out by the contractor China National Aero – Technology International Engineering Corporation (CATIC-ENG) deploying 310 Chinese expatriates, more than 300 Sri Lankans and more than 230 units of machinery and equipment on site.</p><p></p><p>Ground lighting on the airfield are also being changed from the existing 30 year old cable system with halogen lights to 2500 LED lights (making it easy for pilots).</p><p></p><p>- <a href="http://www.sundaytimes.lk/170326/business-times/bia-runway-overlay-completed-233845.html" target="_blank">http://www.sundaytimes.lk/170326/business-times/bia-runway-overlay-completed-233845.html</a></p></blockquote><p></p>
[QUOTE="monson, post: 21383173, member: 30005"] [B][SIZE="5"]BIA runway overlay completed[/SIZE][/B] By Sunimalee Dias Overlay work on the runway at the Bandaranaike International Airport (BIA) was completed ahead of schedule last week but re-opening for all flights would take place as planned on April 6. The airport has been closed during the day (8.30 am to 4.30 pm) since January 6, and opens only at night. When the BIA resumes full operations on April 6, the runway will be able to accommodate A380s since the width of the runway has also been increased to 75 metres from an earlier 60 metres. Airport and Aviation Services Ltd Head of Civil Engineering (Planning and Designs) G. Withanage told the Business Times that they were “nearing completion” adding that “We can do it as per the schedule.” He noted that their target was to complete an operational runway. Though the runway overlay work was completed other aspects of the project like the taxiway needed to be completed and the air operation area would conclude today (Sunday), Mr. Withanage said. The work was carried out by the contractor China National Aero – Technology International Engineering Corporation (CATIC-ENG) deploying 310 Chinese expatriates, more than 300 Sri Lankans and more than 230 units of machinery and equipment on site. Ground lighting on the airfield are also being changed from the existing 30 year old cable system with halogen lights to 2500 LED lights (making it easy for pilots). - [url]http://www.sundaytimes.lk/170326/business-times/bia-runway-overlay-completed-233845.html[/url] [/QUOTE]
Insert quotes…
Verification
Awruddata maasa keeyada?
Post reply
Top
Bottom