Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 21502875" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">Access Engineering speeds up Ganemulla flyover construction, to be completed in May 2017</span></strong></p><p></p><p>Access Engineering backed by experience and expertise in flyover construction in Sri Lanka, is making a swift progress in the Ganemulla flyover project to ease traffic in Ganemulla.</p><p></p><p>The project is spearheaded by the Road Development Authority and is funded by the Government of Spain. The design and the supply of the superstructure are entrusted to the main contractor; Centunion S. A of Spain and the design of sub structure, onsite fabrication, installation and erection are subcontracted to Access Engineering along with the construction of approach roads and associated civil works.</p><p></p><p>The project emerged as a permanent solution to the situation, involves the erection of a 256m long flyover which is comprised of 3.5m wide two lane carriageways and 1.2m wide two pedestrian ways. The flyover is built on a pile foundations and seven span steel superstructure. The steel components of the super structure including piers, girders and decking are imported from Spain through the main contract and are available onsite ready to be installed.</p><p></p><p>The erection of steel bridge piers and onsite fabrication works including splicing of bridge beams are in progress and a significant percentage of the substructure of the development is now completed. The scope of the project also includes the construction of 330m long approach roads of which earth work is now commenced and progressing.</p><p></p><p>“As the development is progressing in the middle of a highly congested urbanity, Road Development Authority and Railway Authority are frequently consulted to ensure the operation progresses with minimum disturbance to the rail and vehicle traffic and the daily commuters of the neighbourhood,” Project Manager Jeewaka Dayanakaya said.</p><p></p><p>The project is to be completed in May 2017.</p><p></p><p>- <a href="http://dailynews.lk/2017/03/22/business/111103/access-engineering-speeds-ganemulla-flyover-construction" target="_blank">http://dailynews.lk/2017/03/22/business/111103/access-engineering-speeds-ganemulla-flyover-construction</a></p></blockquote><p></p>
[QUOTE="monson, post: 21502875, member: 30005"] [B][SIZE="5"]Access Engineering speeds up Ganemulla flyover construction, to be completed in May 2017[/SIZE][/B] Access Engineering backed by experience and expertise in flyover construction in Sri Lanka, is making a swift progress in the Ganemulla flyover project to ease traffic in Ganemulla. The project is spearheaded by the Road Development Authority and is funded by the Government of Spain. The design and the supply of the superstructure are entrusted to the main contractor; Centunion S. A of Spain and the design of sub structure, onsite fabrication, installation and erection are subcontracted to Access Engineering along with the construction of approach roads and associated civil works. The project emerged as a permanent solution to the situation, involves the erection of a 256m long flyover which is comprised of 3.5m wide two lane carriageways and 1.2m wide two pedestrian ways. The flyover is built on a pile foundations and seven span steel superstructure. The steel components of the super structure including piers, girders and decking are imported from Spain through the main contract and are available onsite ready to be installed. The erection of steel bridge piers and onsite fabrication works including splicing of bridge beams are in progress and a significant percentage of the substructure of the development is now completed. The scope of the project also includes the construction of 330m long approach roads of which earth work is now commenced and progressing. “As the development is progressing in the middle of a highly congested urbanity, Road Development Authority and Railway Authority are frequently consulted to ensure the operation progresses with minimum disturbance to the rail and vehicle traffic and the daily commuters of the neighbourhood,” Project Manager Jeewaka Dayanakaya said. The project is to be completed in May 2017. - [url]http://dailynews.lk/2017/03/22/business/111103/access-engineering-speeds-ganemulla-flyover-construction[/url] [/QUOTE]
Insert quotes…
Verification
Asuwa dahayen wadi kalama keeyada?
Post reply
Top
Bottom