Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Handmade Character Soft Toy Bluey Bingo
anil1961
Updated:
Monday at 3:55 PM
Colombo
Dahua POE Switch 8 Ports (DH-PFS3010-8ET-65)
hashaz2012
Updated:
Monday at 11:56 AM
Ad icon
Singapore V2Ray VPN for Tunneling
hu KANNA
Updated:
Jul 31, 2026
Dating Website & Online Chat Room
hotvideo
Updated:
Jul 30, 2026
DJI Mini 4 Pro Drone Combo Plus
Hawaka
Updated:
Jul 30, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 21869126" data-attributes="member: 30005"><p><strong><span style="font-size: 15px">Matara – Kataragama Railway Extension: CMC will not compromise on quality: Project GM Tang Ming</span></strong></p><p></p><p><img src="http://dailynews.lk/sites/default/files/news/2017/06/12/z_p02-CMC.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p><em>Work on the Bambarenda station in progress</em></p><p></p><p>The China National Machinery Import and Export Corporation, better known as CMC is a Chinese government entity and will not compromise on quality, safety or stake its reputation for any reason, said CMC’s Project General Manager for the Matara – Kataragama Railway Extension Project (Phase I) Tang Ming.</p><p></p><p><img src="http://dailynews.lk/sites/default/files/news/2017/06/12/z_p02-CMC1.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>He was responding to allegations made by former team leader appointed by the project consultants Central Engineering Consultancy Bureau (CECB) at a press conference which was aired over electronic media a few days ago.</p><p></p><p>“We are deeply concerned about the allegations,” he added.</p><p></p><p>The Transport Ministry awarded the designing and construction of phase one of the Matara – Kataragama Railway Extension to China National Machinery Import and Export Corporation while appointing the Central Engineering Consultancy Bureau as consultants. Phase one which is the 27km stretch from Matara to Beliatta will cost the Sri Lanka government USD 278 million and is financed by China’s Exim Bank.</p><p></p><p>“CMC with a staff of over 2000 stationed worldwide is experienced in the construction and upgrading of railway lines and has successfully completed the construction of the 158km Ankara - Istanbul high-speed railway project in Turkey which commenced in 2006 at a cost of USD 1.27 billion, before engaging in the construction of phase one of the Matara - Kataragama Railway Extension Project in 2010,” Tang Ming said.</p><p></p><p>“CMC has also been awarded the locomotive and carriage and construction plants, and component assembly project in Myanmar in 2013 at a cost of USD 102 million and in 2015 was awarded the high-speed upgrading of the 926 km Teheran – Mashhad railway project costing USD 1.69 billion. All the above projects are on a design and build basis and are financed by China Exim Bank. In addition, the company has supplied many Diesel locomotives and passenger carriages to Pakistan, Iran, Thailand, Myanmar, Bangladesh, Vietnam, Turkmenistan, Brazil, Cuba and even Sri Lanka,” said CMC’s Project Manager in Sri Lanka Wu Fan Yu.</p><p></p><p>“We have cast over 300 concrete girders for the Southern Railway Extension Project of which only less than 1 percent failed certification.</p><p></p><p>“These girders have been discarded and the rest have been launched under the supervision of the CECB and Ministry of Transport. It is the CECB that has been appointed by the Ministry of Transport to approve and monitor the design and construction of Phase one of the Matara – Kataragama Railway Extension and engineers from CECB are expected to approve contract material submissions, contract methods and monitor every step of the construction process. It is only once they certify that we can proceed with the construction or move on to the next step,” explained Tang. “It is true that the project is behind schedule. There are many reasons for the delay including adverse weather conditions including delays caused by CECB,” he added.</p><p></p><p>- <a href="http://dailynews.lk/2017/06/13/local/118663/matara-%E2%80%93-kataragama-railway-extension-cmc-will-not-compromise-quality" target="_blank">http://dailynews.lk/2017/06/13/local/118663/matara-–-kataragama-railway-extension-cmc-will-not-compromise-quality</a></p></blockquote><p></p>
[QUOTE="monson, post: 21869126, member: 30005"] [B][SIZE="4"]Matara – Kataragama Railway Extension: CMC will not compromise on quality: Project GM Tang Ming[/SIZE][/B] [IMG]http://dailynews.lk/sites/default/files/news/2017/06/12/z_p02-CMC.jpg[/IMG] [I]Work on the Bambarenda station in progress[/I] The China National Machinery Import and Export Corporation, better known as CMC is a Chinese government entity and will not compromise on quality, safety or stake its reputation for any reason, said CMC’s Project General Manager for the Matara – Kataragama Railway Extension Project (Phase I) Tang Ming. [IMG]http://dailynews.lk/sites/default/files/news/2017/06/12/z_p02-CMC1.jpg[/IMG] He was responding to allegations made by former team leader appointed by the project consultants Central Engineering Consultancy Bureau (CECB) at a press conference which was aired over electronic media a few days ago. “We are deeply concerned about the allegations,” he added. The Transport Ministry awarded the designing and construction of phase one of the Matara – Kataragama Railway Extension to China National Machinery Import and Export Corporation while appointing the Central Engineering Consultancy Bureau as consultants. Phase one which is the 27km stretch from Matara to Beliatta will cost the Sri Lanka government USD 278 million and is financed by China’s Exim Bank. “CMC with a staff of over 2000 stationed worldwide is experienced in the construction and upgrading of railway lines and has successfully completed the construction of the 158km Ankara - Istanbul high-speed railway project in Turkey which commenced in 2006 at a cost of USD 1.27 billion, before engaging in the construction of phase one of the Matara - Kataragama Railway Extension Project in 2010,” Tang Ming said. “CMC has also been awarded the locomotive and carriage and construction plants, and component assembly project in Myanmar in 2013 at a cost of USD 102 million and in 2015 was awarded the high-speed upgrading of the 926 km Teheran – Mashhad railway project costing USD 1.69 billion. All the above projects are on a design and build basis and are financed by China Exim Bank. In addition, the company has supplied many Diesel locomotives and passenger carriages to Pakistan, Iran, Thailand, Myanmar, Bangladesh, Vietnam, Turkmenistan, Brazil, Cuba and even Sri Lanka,” said CMC’s Project Manager in Sri Lanka Wu Fan Yu. “We have cast over 300 concrete girders for the Southern Railway Extension Project of which only less than 1 percent failed certification. “These girders have been discarded and the rest have been launched under the supervision of the CECB and Ministry of Transport. It is the CECB that has been appointed by the Ministry of Transport to approve and monitor the design and construction of Phase one of the Matara – Kataragama Railway Extension and engineers from CECB are expected to approve contract material submissions, contract methods and monitor every step of the construction process. It is only once they certify that we can proceed with the construction or move on to the next step,” explained Tang. “It is true that the project is behind schedule. There are many reasons for the delay including adverse weather conditions including delays caused by CECB,” he added. - [url]http://dailynews.lk/2017/06/13/local/118663/matara-%E2%80%93-kataragama-railway-extension-cmc-will-not-compromise-quality[/url] [/QUOTE]
Insert quotes…
Verification
Asuwa dahayen wadi kalama keeyada?
Post reply
Top
Bottom