Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Yesterday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Saturday at 10:52 PM
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 21968033" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">Reconstruction work of Kochchikade Bridge project in full swing</span></strong></p><p></p><p>Tuesday, 18 July 2017</p><p></p><p><img src="http://static.ft.lk/ftadmin/wp-content/uploads/2017/07/17224803/DFT-16-10.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>The reconstruction work of Kochichikade Bridge across Mahaoya River on Peliyagoda – Puttalam road (A3) proceeds in full swing as scheduled by Access Engineering PLC.</p><p></p><p>The Paliyagoda-Puttalam road is a trunk road linking some of the principal districts and provincial centres in the country and Mahaoya River is one of the largest perennial rivers which has over 130 km length. The existing bridge across the river was constructed around 1936 and has not been rehabilitated for years. Recognising the vital rehabilitation work required for the said bridge, Road Development Authority initiated a project together with the financials aids from the Government of Austria together with Bilfinger MCE GmbH of Austria and Access Engineering PLC with the objective of widening the bridge with four traffic lanes replacing the existing steel bridge that causes severe traffic congestion and difficulties for safe pedestrians’ movements.Untitled-2</p><p></p><p>The scope of the project is to construct a 105 m long, 3 span bridge with spans of 30 m, 45 m and 30 m. The proposed bridge is 19 m wide and has two separate carriageways. Each abutment of the bridge comprises of 11 nos of bored piles and each pier comprises 10 nos of bored piles. All the piles are of 1.2m diameter and around 21 m in length. The approximate lengths of approach roads to be built newly will be 140 m towards Negombo and 110m towards Chilaw.</p><p></p><p>“As the development is progressing in the middle of a highly congested urbanity, whilst either ends of the bridge belong to two separate provinces, steering the construction work with minimum disturbance to the traffic movement and the surrounding is highly challenging. Yet we anticipate to see the project comes to fruition very soon, as upon the completion, the bridge will bring multiple benefits to the community,” said W.R.P. Chandimal Kumara; Project Manager of the construction of Kochchikade Bridge Project. </p><p></p><p><img src="http://static.ft.lk/ftadmin/wp-content/uploads/2017/07/17224802/DFT-16-9.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>- <a href="http://www.ft.lk/article/628908/Reconstruction-work-of-Kochchikade-Bridge-project-in-full-swing" target="_blank">http://www.ft.lk/article/628908/Reconstruction-work-of-Kochchikade-Bridge-project-in-full-swing</a></p></blockquote><p></p>
[QUOTE="monson, post: 21968033, member: 30005"] [B][SIZE="5"]Reconstruction work of Kochchikade Bridge project in full swing[/SIZE][/B] Tuesday, 18 July 2017 [IMG]http://static.ft.lk/ftadmin/wp-content/uploads/2017/07/17224803/DFT-16-10.jpg[/IMG] The reconstruction work of Kochichikade Bridge across Mahaoya River on Peliyagoda – Puttalam road (A3) proceeds in full swing as scheduled by Access Engineering PLC. The Paliyagoda-Puttalam road is a trunk road linking some of the principal districts and provincial centres in the country and Mahaoya River is one of the largest perennial rivers which has over 130 km length. The existing bridge across the river was constructed around 1936 and has not been rehabilitated for years. Recognising the vital rehabilitation work required for the said bridge, Road Development Authority initiated a project together with the financials aids from the Government of Austria together with Bilfinger MCE GmbH of Austria and Access Engineering PLC with the objective of widening the bridge with four traffic lanes replacing the existing steel bridge that causes severe traffic congestion and difficulties for safe pedestrians’ movements.Untitled-2 The scope of the project is to construct a 105 m long, 3 span bridge with spans of 30 m, 45 m and 30 m. The proposed bridge is 19 m wide and has two separate carriageways. Each abutment of the bridge comprises of 11 nos of bored piles and each pier comprises 10 nos of bored piles. All the piles are of 1.2m diameter and around 21 m in length. The approximate lengths of approach roads to be built newly will be 140 m towards Negombo and 110m towards Chilaw. “As the development is progressing in the middle of a highly congested urbanity, whilst either ends of the bridge belong to two separate provinces, steering the construction work with minimum disturbance to the traffic movement and the surrounding is highly challenging. Yet we anticipate to see the project comes to fruition very soon, as upon the completion, the bridge will bring multiple benefits to the community,” said W.R.P. Chandimal Kumara; Project Manager of the construction of Kochchikade Bridge Project. [IMG]http://static.ft.lk/ftadmin/wp-content/uploads/2017/07/17224802/DFT-16-9.jpg[/IMG] - [url]http://www.ft.lk/article/628908/Reconstruction-work-of-Kochchikade-Bridge-project-in-full-swing[/url] [/QUOTE]
Insert quotes…
Verification
Asuwa dahayen wadi kalama keeyada?
Post reply
Top
Bottom