Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 21988133" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">Central Expressway: Japan’s Taisei Corp to build third section</span></strong></p><p></p><p>23 July, 2017</p><p></p><p>by Anurangi Singh</p><p></p><p>The Taisei Corp of Japan received the much-awaited go ahead from the Cabinet last week to build the 32.5 kilometre long, third section of the Central Expressway, from Pothuhera, near Kurunegala, to Galagedera in Kandy.</p><p></p><p>The decision by the Cabinet culminated a year long tender process where Taisei was the only technically qualified bidder in the first round of the tender, but saw its bid rejected on the grounds of not submitting a bid bond for the project, estimated to cost over one billion US dollars, or just above 161.3 billion rupees.</p><p></p><p>The project, which will be the country´s most expensive and complex expressway project so far undertaken, will be a four-lane carriageway with an operating speed of 100km per hour from Pothuhera to Galagedera. According to the project description released by the Road Development Authority (RDA), the expressway section will “consists of four interchanges at Pothuhera, Polgahawela Interchange, Rambukkana and Galagedera and will contain 12 main bridges, and 17 viaducts across the floodplains of three major rivers; Rambukkan Oya, Kuda Oya and Kospothu Oya.”</p><p></p><p>According RDA sources, the cost of the project will be in two parts, the first, a construction tender for 100 billion yen, or approximately 900 million US dollars and the second a consultation and land acquisition part costing 150 million US dollars for a total of 1050 million US dollars, approximately 161.3 billion rupees. This is almost double the original estimate of 94.7 billion rupees made in 2016 by the RDA.</p><p></p><p>A 15-year yen denominated loan from the Tokyo-Mitsubishi bank at LIBOR plus 0.95% will finance the project. Yesterday´s (22 July) LIBOR – Yen for 12 months rate was 0.11786%, indicating an annualised total interest of just over 1.06%. The loan will have a six-year grace period and then will need to be repaid in nine years, in a total of 15 years.</p><p></p><p>- <a href="http://www.sundayobserver.lk/2017/07/23/news/japan%E2%80%99s-taisei-corp-build-third-section" target="_blank">http://www.sundayobserver.lk/2017/07/23/news/japan’s-taisei-corp-build-third-section</a></p></blockquote><p></p>
[QUOTE="monson, post: 21988133, member: 30005"] [B][SIZE="5"]Central Expressway: Japan’s Taisei Corp to build third section[/SIZE][/B] 23 July, 2017 by Anurangi Singh The Taisei Corp of Japan received the much-awaited go ahead from the Cabinet last week to build the 32.5 kilometre long, third section of the Central Expressway, from Pothuhera, near Kurunegala, to Galagedera in Kandy. The decision by the Cabinet culminated a year long tender process where Taisei was the only technically qualified bidder in the first round of the tender, but saw its bid rejected on the grounds of not submitting a bid bond for the project, estimated to cost over one billion US dollars, or just above 161.3 billion rupees. The project, which will be the country´s most expensive and complex expressway project so far undertaken, will be a four-lane carriageway with an operating speed of 100km per hour from Pothuhera to Galagedera. According to the project description released by the Road Development Authority (RDA), the expressway section will “consists of four interchanges at Pothuhera, Polgahawela Interchange, Rambukkana and Galagedera and will contain 12 main bridges, and 17 viaducts across the floodplains of three major rivers; Rambukkan Oya, Kuda Oya and Kospothu Oya.” According RDA sources, the cost of the project will be in two parts, the first, a construction tender for 100 billion yen, or approximately 900 million US dollars and the second a consultation and land acquisition part costing 150 million US dollars for a total of 1050 million US dollars, approximately 161.3 billion rupees. This is almost double the original estimate of 94.7 billion rupees made in 2016 by the RDA. A 15-year yen denominated loan from the Tokyo-Mitsubishi bank at LIBOR plus 0.95% will finance the project. Yesterday´s (22 July) LIBOR – Yen for 12 months rate was 0.11786%, indicating an annualised total interest of just over 1.06%. The loan will have a six-year grace period and then will need to be repaid in nine years, in a total of 15 years. - [url]http://www.sundayobserver.lk/2017/07/23/news/japan%E2%80%99s-taisei-corp-build-third-section[/url] [/QUOTE]
Insert quotes…
Verification
Hath warak paha keeyada? (hatha wadikireema paha)
Post reply
Top
Bottom