Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 22442698" data-attributes="member: 30005"><p><strong>Installation of new radial gates of Rajanganaya reservoir</strong></p><p></p><p><img src="https://scontent.fcmb2-1.fna.fbcdn.net/v/t1.0-9/22852118_1197102333722536_5254292379141620882_n.jpg?oh=360d3299df08cc9a6caf39a5fa4dfeb2&oe=5AA093F7" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p><img src="https://scontent.fcmb2-1.fna.fbcdn.net/v/t1.0-9/22728855_1197102707055832_4676838771654121862_n.jpg?oh=1927e66cb275e6fc00549d3220f5d276&oe=5AAFF9D7" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p><img src="https://scontent.fcmb2-1.fna.fbcdn.net/v/t1.0-9/22814330_1197102883722481_7723042660493972430_n.jpg?oh=a2e1a1b2bafa43f0fa49449f54793c68&oe=5AAF7B73" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>Installation of new radial gates in the Rajanganaya reservoir is now taking place. Rajanganaya is a large reservoir built across the Kala Oya. The main concrete dam which the huge steel radial gates are installed is 350 m long. The catchment area of the reservoir is 76,863.60 hectares with total storage capacity of 100.37 million cubic meters.</p><p>Since the reservoir receives water from a main river of the country, Kala Oya and with the large catchment area, almost every year the reservoir fills to its full capacity level. The spill way is a long concrete structure with 30 radial gates. These steel radial gates were installed in 1951 and have not undergone major renovation thereafter. As a result they were corroded and depleted posing serious risk and causing operational inefficiencies.</p><p>The radial gates were operated manually and at serious flood situations in the past the operators faced difficulties in opening them and discharge water to protect the dam.</p><p>Under the DSWRPP AF all 30 radial gates are replaced with automated operation system. Manufacturing and installation is done by two contractors, The Government Factory and Colombo Dockyard Ltd, 15 gates by each. DSWRPP AF invests Rs.196.93 million for radial gate replacement and automation of Rajanganaya and Kaudulla reservoirs.</p><p>Under the phase 1 of the DSWRPP the earthen dam and other structures were renovated and with the completion of this project all structural issues identified in the reservoir will be resolved improving safety and operational efficiency.</p><p></p><p>- <a href="https://www.facebook.com/damsafety/posts/1197103190389117" target="_blank">https://www.facebook.com/damsafety/posts/1197103190389117</a></p></blockquote><p></p>
[QUOTE="monson, post: 22442698, member: 30005"] [B]Installation of new radial gates of Rajanganaya reservoir[/B] [IMG]https://scontent.fcmb2-1.fna.fbcdn.net/v/t1.0-9/22852118_1197102333722536_5254292379141620882_n.jpg?oh=360d3299df08cc9a6caf39a5fa4dfeb2&oe=5AA093F7[/IMG] [IMG]https://scontent.fcmb2-1.fna.fbcdn.net/v/t1.0-9/22728855_1197102707055832_4676838771654121862_n.jpg?oh=1927e66cb275e6fc00549d3220f5d276&oe=5AAFF9D7[/IMG] [IMG]https://scontent.fcmb2-1.fna.fbcdn.net/v/t1.0-9/22814330_1197102883722481_7723042660493972430_n.jpg?oh=a2e1a1b2bafa43f0fa49449f54793c68&oe=5AAF7B73[/IMG] Installation of new radial gates in the Rajanganaya reservoir is now taking place. Rajanganaya is a large reservoir built across the Kala Oya. The main concrete dam which the huge steel radial gates are installed is 350 m long. The catchment area of the reservoir is 76,863.60 hectares with total storage capacity of 100.37 million cubic meters. Since the reservoir receives water from a main river of the country, Kala Oya and with the large catchment area, almost every year the reservoir fills to its full capacity level. The spill way is a long concrete structure with 30 radial gates. These steel radial gates were installed in 1951 and have not undergone major renovation thereafter. As a result they were corroded and depleted posing serious risk and causing operational inefficiencies. The radial gates were operated manually and at serious flood situations in the past the operators faced difficulties in opening them and discharge water to protect the dam. Under the DSWRPP AF all 30 radial gates are replaced with automated operation system. Manufacturing and installation is done by two contractors, The Government Factory and Colombo Dockyard Ltd, 15 gates by each. DSWRPP AF invests Rs.196.93 million for radial gate replacement and automation of Rajanganaya and Kaudulla reservoirs. Under the phase 1 of the DSWRPP the earthen dam and other structures were renovated and with the completion of this project all structural issues identified in the reservoir will be resolved improving safety and operational efficiency. - [url]https://www.facebook.com/damsafety/posts/1197103190389117[/url] [/QUOTE]
Insert quotes…
Verification
Dahaya deken beduwama keeyada?
Post reply
Top
Bottom