Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 22665905" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">Underground sea road: Study to be completed by March 2018</span></strong></p><p></p><p>The feasibility study for the proposed construction project on underground sea road extension via Marine Drive which would be connected to the Port City’s proposed elevated highway will be completed in March 2018, the Director of the Port City project Nihal Fernando said yesterday.</p><p></p><p>Speaking to the Daily Mirror he said that the Megapolis and Western Development Ministry had received the Cabinet approval to complete the project as Public – Private Partnership (PPP) project.</p><p></p><p>He said that the Cabinet had submitted the proposal to the Cabinet Committee on Economic Management and the committee recommended that a joint venture would be more suitable for the above project.</p><p></p><p>The feasibility of the project will be looked by a three- member committee comprising Secretary of the Finance and Mass Media, Secretary of the Megpolis and Western Development and a representative of the Attorney General’s Department.</p><p></p><p>The agreements for the certain infrastructure to the Port City had signed between the Ministry of Megapolis and Western Development, Urban Development Authority and CHEC Port City Colombo (Pvt) Limited in August, 2016, he said.</p><p></p><p>“The Road Development Authority (RDA) will be constructed a new Kelani Bridge and Port Access Elevated Highway which would connect to the existing Colombo – Katunayake Airport highway, and also an extension of Marine Drive will be also connected to the Port Access Elevated highway”, he said.</p><p></p><p>Mr. Feranado said that the Marine Drive sea road extension will increase the width of the Galle Face Green without damaging or disturbing the heritage buildings such as Galle Face Hotel and could also provide an underground road which would connect to the Shangri La Hotel area.(Yoshitha Perera)</p><p></p><p>- <a href="http://www.dailymirror.lk/article/Underground-sea-road-Study-to-be-completed-by-March--142997.html" target="_blank">http://www.dailymirror.lk/article/Underground-sea-road-Study-to-be-completed-by-March--142997.html</a></p></blockquote><p></p>
[QUOTE="monson, post: 22665905, member: 30005"] [B][SIZE="5"]Underground sea road: Study to be completed by March 2018[/SIZE][/B] The feasibility study for the proposed construction project on underground sea road extension via Marine Drive which would be connected to the Port City’s proposed elevated highway will be completed in March 2018, the Director of the Port City project Nihal Fernando said yesterday. Speaking to the Daily Mirror he said that the Megapolis and Western Development Ministry had received the Cabinet approval to complete the project as Public – Private Partnership (PPP) project. He said that the Cabinet had submitted the proposal to the Cabinet Committee on Economic Management and the committee recommended that a joint venture would be more suitable for the above project. The feasibility of the project will be looked by a three- member committee comprising Secretary of the Finance and Mass Media, Secretary of the Megpolis and Western Development and a representative of the Attorney General’s Department. The agreements for the certain infrastructure to the Port City had signed between the Ministry of Megapolis and Western Development, Urban Development Authority and CHEC Port City Colombo (Pvt) Limited in August, 2016, he said. “The Road Development Authority (RDA) will be constructed a new Kelani Bridge and Port Access Elevated Highway which would connect to the existing Colombo – Katunayake Airport highway, and also an extension of Marine Drive will be also connected to the Port Access Elevated highway”, he said. Mr. Feranado said that the Marine Drive sea road extension will increase the width of the Galle Face Green without damaging or disturbing the heritage buildings such as Galle Face Hotel and could also provide an underground road which would connect to the Shangri La Hotel area.(Yoshitha Perera) - [url]http://www.dailymirror.lk/article/Underground-sea-road-Study-to-be-completed-by-March--142997.html[/url] [/QUOTE]
Insert quotes…
Verification
Nawa warak dahaya keeyada? (Namaya wadi kireema dahaya)
Post reply
Top
Bottom