Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 23473520" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">National Policy on Natural Gas initial draft ready</span></strong></p><p></p><p>Tuesday, July 31, 2018 - 01:03</p><p>Print Edition</p><p>Local</p><p></p><p>The Petroleum Resources Development Secretariat (PRDS) has prepared an initial draft of the ‘National Policy on Natural Gas’ as the Government moves to commercialize already discovered gas deposits in the Mannar basin through International Competitive Bidding.</p><p></p><p>This was indicated in the Petroleum Resources Development Ministry Performance Report for the year 2017 tabled in Parliament on July 19.</p><p></p><p><strong>“Sri Lanka has already discovered its own gas depositories in the Mannar basin. It has been revealed that the smaller “Dorado” reservoir has 300 Billion Cubic Feet of Natural Gas that can fire a 630 MW power plant for about 10 years.</strong></p><p><strong></strong></p><p><strong>The more complex larger “Barracuda” discovery exceeds 1.8 Trillion Cubic Feet of Natural Gas that can fire a 2,000 MW power plant for 30 years,” the report stated.</strong></p><p></p><p>It stated the Draft National Policy on Natural Gas prepared by the PRDS in collaboration with the Ceylon Petroleum Corporation is currently being reviewed by the Ministry together with other stakeholders.</p><p></p><p>- <a href="http://www.dailynews.lk/2018/07/31/local/158394/national-policy-natural-gas-initial-draft-ready" target="_blank">http://www.dailynews.lk/2018/07/31/local/158394/national-policy-natural-gas-initial-draft-ready</a></p></blockquote><p></p>
[QUOTE="monson, post: 23473520, member: 30005"] [B][SIZE="5"]National Policy on Natural Gas initial draft ready[/SIZE][/B] Tuesday, July 31, 2018 - 01:03 Print Edition Local The Petroleum Resources Development Secretariat (PRDS) has prepared an initial draft of the ‘National Policy on Natural Gas’ as the Government moves to commercialize already discovered gas deposits in the Mannar basin through International Competitive Bidding. This was indicated in the Petroleum Resources Development Ministry Performance Report for the year 2017 tabled in Parliament on July 19. [B]“Sri Lanka has already discovered its own gas depositories in the Mannar basin. It has been revealed that the smaller “Dorado” reservoir has 300 Billion Cubic Feet of Natural Gas that can fire a 630 MW power plant for about 10 years. The more complex larger “Barracuda” discovery exceeds 1.8 Trillion Cubic Feet of Natural Gas that can fire a 2,000 MW power plant for 30 years,” the report stated.[/B] It stated the Draft National Policy on Natural Gas prepared by the PRDS in collaboration with the Ceylon Petroleum Corporation is currently being reviewed by the Ministry together with other stakeholders. - [url]http://www.dailynews.lk/2018/07/31/local/158394/national-policy-natural-gas-initial-draft-ready[/url] [/QUOTE]
Insert quotes…
Verification
Awruddata maasa keeyada?
Post reply
Top
Bottom