Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 23508902" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">PM opens integrated water supply system, sewerage project in Kurunegala</span></strong></p><p></p><p>Saturday, August 11, 2018 - 01:00</p><p></p><p>Prime Minister Ranil Wickremasinghe will be in Kurunegala on August 13, where he would vest in the public the integrated water supply system and sewerage project.</p><p></p><p>The improvement and enhancement of the Kurunegala drinking water supply scheme was a long standing requirement of the Kurunegala Municipal area and its suburbs. With this necessity being taken into consideration, measures were taken to provide the people in Kurunegala with solutions for the drinking water problem.</p><p></p><p>The sanitation facility will cater to the needs of households, government, private sector, schools, hospitals, tourist hotels, institutions and all of the daily floating population exceeding 100,000.</p><p></p><p>It was also cited that the rapid development of the Kurunegala city had led to a sewerage disposal problem where most septic tanks in households were not up to standard and leak into the environment. This has also led to the contamination of the Kurunegala lake due to contaminated underground water.</p><p></p><p><span style="color: Green">The project aims to provide safe drinking water, continuous, potable water for 24 hours, facilitating more than 100,000 floating population with 45,000 public in city limits and also to facilitate the General hospital of Kurunegala with 24 hours continuous water supply.</span></p><p><span style="color: Green"></span></p><p><span style="color: Green">To would also provide the opportunity of disposing waste water for 3,500 domestic and commercial institutes through well organized sewerage network. The project is estimated to be valued at Rs. 15,500 million out of which, Rs. 3,200 million is funded by the government.</span></p><p></p><p>The construction of this project was completed by the China Machinery Engineering Company (CMEC), under the guidance of the Ministry of City Planning and Water Supply and the supervision of the Water Supply and Drainage Board.</p><p></p><p>- <a href="http://www.dailynews.lk/2018/08/11/local/159409/pm-opens-integrated-water-supply-system-sewerage-project-kurunegala" target="_blank">http://www.dailynews.lk/2018/08/11/local/159409/pm-opens-integrated-water-supply-system-sewerage-project-kurunegala</a></p></blockquote><p></p>
[QUOTE="monson, post: 23508902, member: 30005"] [B][SIZE="5"]PM opens integrated water supply system, sewerage project in Kurunegala[/SIZE][/B] Saturday, August 11, 2018 - 01:00 Prime Minister Ranil Wickremasinghe will be in Kurunegala on August 13, where he would vest in the public the integrated water supply system and sewerage project. The improvement and enhancement of the Kurunegala drinking water supply scheme was a long standing requirement of the Kurunegala Municipal area and its suburbs. With this necessity being taken into consideration, measures were taken to provide the people in Kurunegala with solutions for the drinking water problem. The sanitation facility will cater to the needs of households, government, private sector, schools, hospitals, tourist hotels, institutions and all of the daily floating population exceeding 100,000. It was also cited that the rapid development of the Kurunegala city had led to a sewerage disposal problem where most septic tanks in households were not up to standard and leak into the environment. This has also led to the contamination of the Kurunegala lake due to contaminated underground water. [COLOR="Green"]The project aims to provide safe drinking water, continuous, potable water for 24 hours, facilitating more than 100,000 floating population with 45,000 public in city limits and also to facilitate the General hospital of Kurunegala with 24 hours continuous water supply. To would also provide the opportunity of disposing waste water for 3,500 domestic and commercial institutes through well organized sewerage network. The project is estimated to be valued at Rs. 15,500 million out of which, Rs. 3,200 million is funded by the government.[/COLOR] The construction of this project was completed by the China Machinery Engineering Company (CMEC), under the guidance of the Ministry of City Planning and Water Supply and the supervision of the Water Supply and Drainage Board. - [url]http://www.dailynews.lk/2018/08/11/local/159409/pm-opens-integrated-water-supply-system-sewerage-project-kurunegala[/url] [/QUOTE]
Insert quotes…
Verification
Payakata winadi keeyak tibeda?
Post reply
Top
Bottom