Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 23673995" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">Access Engineering completes construction of new road along west bank of west Beira Lake</span></strong></p><p></p><p><img src="https://i.postimg.cc/fRF2h6D6/image_1b4c841696.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>The construction of new road along the west bank of west Beira Lake adjoining the former Army Headquarters, Baladaksha Mawatha, Colombo 2 was recently completed by Access Engineering PLC.</p><p></p><p>Colombo is currently seeing the worst of vehicular traffic situations with the increasing number of vehicles entering the city promises every day. Out of all the arterial roads driving traffic towards the city of Colombo, Colombo- Galle Road (A2) is reported to be one of the highly-congested roads that require urgent attention. </p><p></p><p>With the completion of many hotel and condominium developments within the city, especially along the Colombo-Galle road, the anticipated traffic volume is scheduled to be doubled bursting the city roads at seams. </p><p></p><p>In order to ease out the anticipated complexities, the Colombo Municipality Council initiated the construction of a ring road from Colombo-Galle Road (0+000) to Justice Akbar Mawatha (1+186.27) creating a direct pathway to access the upcoming hotels and condominium developments in and around Galle Face and along the Galle Road without disturbing the current flow of traffic. </p><p></p><p>The construction work was entrusted to Access Engineering PLC and the scope of the work included the construction of 1.15 km long four lane carriageway where the width of a single lane would be 3.3m.The road is constructed along with a 1.8m wide foot path on right side and a 0.75m wide food path on left side and a 7m wide two lane connection road connecting to the Galle-Colombo Road.</p><p></p><p>The scope of the work has involved several soft ground treatments as the involved ground areas have previously been filled with demolished road debris. Access Engineering has worked in full force to ensure smooth removal of army officer’s building from the site with minimum disturbance to the surrounding commuters and neighbourhoods. </p><p></p><p>- <a href="http://www.ft.lk/propertyconstruction/Access-Engineering-completes-construction-of-new-road-along-west-bank-of-west-Beira-Lake/10516-663670" target="_blank">http://www.ft.lk/propertyconstruction/Access-Engineering-completes-construction-of-new-road-along-west-bank-of-west-Beira-Lake/10516-663670</a></p></blockquote><p></p>
[QUOTE="monson, post: 23673995, member: 30005"] [B][SIZE="5"]Access Engineering completes construction of new road along west bank of west Beira Lake[/SIZE][/B] [IMG]https://i.postimg.cc/fRF2h6D6/image_1b4c841696.jpg[/IMG] The construction of new road along the west bank of west Beira Lake adjoining the former Army Headquarters, Baladaksha Mawatha, Colombo 2 was recently completed by Access Engineering PLC. Colombo is currently seeing the worst of vehicular traffic situations with the increasing number of vehicles entering the city promises every day. Out of all the arterial roads driving traffic towards the city of Colombo, Colombo- Galle Road (A2) is reported to be one of the highly-congested roads that require urgent attention. With the completion of many hotel and condominium developments within the city, especially along the Colombo-Galle road, the anticipated traffic volume is scheduled to be doubled bursting the city roads at seams. In order to ease out the anticipated complexities, the Colombo Municipality Council initiated the construction of a ring road from Colombo-Galle Road (0+000) to Justice Akbar Mawatha (1+186.27) creating a direct pathway to access the upcoming hotels and condominium developments in and around Galle Face and along the Galle Road without disturbing the current flow of traffic. The construction work was entrusted to Access Engineering PLC and the scope of the work included the construction of 1.15 km long four lane carriageway where the width of a single lane would be 3.3m.The road is constructed along with a 1.8m wide foot path on right side and a 0.75m wide food path on left side and a 7m wide two lane connection road connecting to the Galle-Colombo Road. The scope of the work has involved several soft ground treatments as the involved ground areas have previously been filled with demolished road debris. Access Engineering has worked in full force to ensure smooth removal of army officer’s building from the site with minimum disturbance to the surrounding commuters and neighbourhoods. - [url]http://www.ft.lk/propertyconstruction/Access-Engineering-completes-construction-of-new-road-along-west-bank-of-west-Beira-Lake/10516-663670[/url] [/QUOTE]
Insert quotes…
Verification
Nawa warak dahaya keeyada? (Namaya wadi kireema dahaya)
Post reply
Top
Bottom