Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Google Pixel 9 Pro
vgp
Updated:
Thursday at 5:57 PM
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Sep 26, 2026
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
සංවර්ධන News
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 24195338" data-attributes="member: 30005"><p><strong><span style="font-size: 18px">Kelani Valley Railway Improvement Program Phase 1 / Colombo Suburban Railway Efficiency Improvement Project / Colombo Suburban Railway (Electrification) Project</span></strong></p><p></p><p>In January 2018, Ministry of Transport & Civil Aviation(MoT&CA) has engaged an International consultancy firm to carry out Feasibility Study and Detailed Design for the Colombo railway system in Colombo Suburban Region(CSR) of Sri Lanka Railways (SLR). Under this consultancy services, Railway Development in the CSR such as construction of additional tracks, rehabilitation of existing track, new signalling system, station buildings, telecommunication system, railway deports and maintenance centres, training of Railway staff, ICT systems, railway rules and regulations will be studied and will be designed. It has been planned to immediately commence the bidding process to implement the designs, Line by Line.</p><p></p><p>Asian Development Bank(ADB)’s future assistance is expected to support the electrification and double tracking of the Kelani Valley Line in 2020. In addition, ADB will assist in developing Main Line and Coastal Line too. The Kelani Valley Line serves a densely urbanized area in southeast Colombo and is currently a single-track railway line with few passing loops and frequent level crossings. Construction of an elevated dual track on a viaduct structure is proposed as part of the Kelani Valley Railway Improvement Program Phase 1. The proposed elevated section of the Kelani Valley Line is approximately 20.8 kilometres long and runs between Maradana and Malapalla.</p><p></p><p>By considering the development concept, MoT&CA intends to engage a firm of international and national consultants (the Consultant) to study land value capture (LVC) and transit-oriented development (TOD) opportunities along the Kelani Valley Line. The Consultant will identify and develop urban development and land value capture opportunities and recommendations for the proposed elevated section of the Kelani Valley Line.</p><p></p><p>Above development involve Land Acquisition and Relocation of Project Affected People. The Kelani Velley Line corridor is heavily encroached and the availability of Right of Way is limited to 10 to 12 meters. The Double Line Design including the Service Road for construction involves Land Acquisition.</p><p></p><p>ADB, through its Transport Project Preparatory Technical Assistance extended a grant for consultancy for development of Enterprise Resource Planning System for Sri Lanka Railways and to implement an ERP pilot project covering a selected section of Sri Lanka Railways. This consultancy consisting of International and National Consultants will be mobilised in the next few months. A Team of </p><p>SLR officials will also be joined with this consultancy in order to extend domain knowledge, obtain training and to organise extending knowhow within SLR.</p><p></p><p>In Addition, MoTCA engaged International and National Consultants for studying and designing (including Bid Documents) of Railway Islandwide Telecommunication System. The bids have now been called and the Bid Evaluation is being done by Colombo Suburban Railway Project (In fact, by the TEC supported by Consultants). It is expected that the implementation will begin from June 2019.</p><p></p><p>Pic: An Electric Multiple Unit of Chennai Metro.</p><p></p><p><img src="https://i.postimg.cc/k5pqRdbD/51562098-2406620316290938-8628001686008365056-n.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p></blockquote><p></p>
[QUOTE="monson, post: 24195338, member: 30005"] [B][SIZE="5"]Kelani Valley Railway Improvement Program Phase 1 / Colombo Suburban Railway Efficiency Improvement Project / Colombo Suburban Railway (Electrification) Project[/SIZE][/B] In January 2018, Ministry of Transport & Civil Aviation(MoT&CA) has engaged an International consultancy firm to carry out Feasibility Study and Detailed Design for the Colombo railway system in Colombo Suburban Region(CSR) of Sri Lanka Railways (SLR). Under this consultancy services, Railway Development in the CSR such as construction of additional tracks, rehabilitation of existing track, new signalling system, station buildings, telecommunication system, railway deports and maintenance centres, training of Railway staff, ICT systems, railway rules and regulations will be studied and will be designed. It has been planned to immediately commence the bidding process to implement the designs, Line by Line. Asian Development Bank(ADB)’s future assistance is expected to support the electrification and double tracking of the Kelani Valley Line in 2020. In addition, ADB will assist in developing Main Line and Coastal Line too. The Kelani Valley Line serves a densely urbanized area in southeast Colombo and is currently a single-track railway line with few passing loops and frequent level crossings. Construction of an elevated dual track on a viaduct structure is proposed as part of the Kelani Valley Railway Improvement Program Phase 1. The proposed elevated section of the Kelani Valley Line is approximately 20.8 kilometres long and runs between Maradana and Malapalla. By considering the development concept, MoT&CA intends to engage a firm of international and national consultants (the Consultant) to study land value capture (LVC) and transit-oriented development (TOD) opportunities along the Kelani Valley Line. The Consultant will identify and develop urban development and land value capture opportunities and recommendations for the proposed elevated section of the Kelani Valley Line. Above development involve Land Acquisition and Relocation of Project Affected People. The Kelani Velley Line corridor is heavily encroached and the availability of Right of Way is limited to 10 to 12 meters. The Double Line Design including the Service Road for construction involves Land Acquisition. ADB, through its Transport Project Preparatory Technical Assistance extended a grant for consultancy for development of Enterprise Resource Planning System for Sri Lanka Railways and to implement an ERP pilot project covering a selected section of Sri Lanka Railways. This consultancy consisting of International and National Consultants will be mobilised in the next few months. A Team of SLR officials will also be joined with this consultancy in order to extend domain knowledge, obtain training and to organise extending knowhow within SLR. In Addition, MoTCA engaged International and National Consultants for studying and designing (including Bid Documents) of Railway Islandwide Telecommunication System. The bids have now been called and the Bid Evaluation is being done by Colombo Suburban Railway Project (In fact, by the TEC supported by Consultants). It is expected that the implementation will begin from June 2019. Pic: An Electric Multiple Unit of Chennai Metro. [IMG]https://i.postimg.cc/k5pqRdbD/51562098-2406620316290938-8628001686008365056-n.jpg[/IMG] [/QUOTE]
Insert quotes…
Verification
Dahaya deken beduwama keeyada?
Post reply
Top
Bottom