Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
ZTE MF283U 4G Unlocked Router (Used)
ayanthamaxi
Updated:
Sunday at 8:26 PM
ලංකාවේ හොඳම උපකාරක පන්ති සහ ගුරුවරුන් එකම තැනකින් - TopTuition.lk
dulithapathum
Updated:
Jul 18, 2026
Colombo
RidhMathraa ’26 🎶✨
Tmadhusanka
Updated:
Jul 15, 2026
Ad icon
Colombo
PXN V10 Pro Direct Drive Racing Wheel (Under Warranty)
Abdur Rahman
Updated:
Jul 15, 2026
Ad icon
USDT ණය සේවාව - USDT Loan Service
පුරවැසියා
Updated:
Jul 15, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
✈✈ Aviation ✈✈
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="kmc madushan" data-source="post: 18074205" data-attributes="member: 341750"><p style="text-align: center"><span style="color: Black"><strong><span style="font-size: 22px">Sri Lanka to call fresh bids for runway repair</span></strong></span></p> <p style="text-align: center"></p> <p style="text-align: center"><img src="http://upload.wikimedia.org/wikipedia/commons/2/25/22_boeing_772_app_cmb.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p> <p style="text-align: center"></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">main airport after cancelling a deal given by the former regime to a local firm that was 25 percent higher than government estimates.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">Ports and Aviation Minister Arjuna Ranatunga has recommended that bids be obtained from "reputed international construction contractors" and request for proposals to be sent to three firms directly.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">They are Al Naboodah Construction Group LLC Dubai, UAE, Colas Ltd. of Birmingham, UK and China Harbour Engineering Company, according to a proposal accepted this week by the Cabinet of Ministers.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">Funding for the project to repair the runway at the island's international airport at Katunayake will have to be obtained by the contractor as a soft loan, according to the aviation ministry proposal.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">The government has cancelled an 85.8 million US dollar contract awarded by the former Rajapaksa regime to local construction firm Access Engineering.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">This was because no competitive tender procedure had been followed in the award of the contract and Access Engineering lacked experience for the runway work, Ports and Aviation Minister Ranatunga told the Cabinet of ministers.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">No major repair work has been done on the runway after it was opened to air traffic in 1986.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">The International Civil Aviation Organization has recommended in their audit observation of Sri Lankan airports that an overlaying of the runway to improve surface condition has to be done.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">This was to ensure "the safe operation of aircraft as some cracks have appeared on the runway surface," according to the proposal.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">Access Engineering's original proposal in August 2014 was 103.6 million US dollars but this was negotiated down to 85.8 million dollars, which still "was 25 percent over the engineer's estimate," it said. </span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">That original bid was subject to renegotiation with Access Engineering to reduce the final bid price.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">But the then-Cabinet of ministers was told the negotiations were not successful and contract awarded o Access at 85.8 million dollars, </span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"><span style="font-size: 12px">Ranatunga has said Access Engineering's "quoted price is also comparatively high" as revealed by inquiries from Al Naboodah Construction Group LLC of Dubai, UAE and Colas Ltd. Birmingham, UK which done similar overlay work on runways in Dubai International Airport and London Gatwick International Airport.</span></p> <p style="text-align: center"><span style="font-size: 12px"></span></p> <p style="text-align: center"></p> <p style="text-align: center">economynext</p></blockquote><p></p>
[QUOTE="kmc madushan, post: 18074205, member: 341750"] [CENTER][COLOR="Black"][B][SIZE="6"]Sri Lanka to call fresh bids for runway repair[/SIZE][/B][/COLOR] [IMG]http://upload.wikimedia.org/wikipedia/commons/2/25/22_boeing_772_app_cmb.jpg[/IMG] [SIZE="3"] main airport after cancelling a deal given by the former regime to a local firm that was 25 percent higher than government estimates. Ports and Aviation Minister Arjuna Ranatunga has recommended that bids be obtained from "reputed international construction contractors" and request for proposals to be sent to three firms directly. They are Al Naboodah Construction Group LLC Dubai, UAE, Colas Ltd. of Birmingham, UK and China Harbour Engineering Company, according to a proposal accepted this week by the Cabinet of Ministers. Funding for the project to repair the runway at the island's international airport at Katunayake will have to be obtained by the contractor as a soft loan, according to the aviation ministry proposal. The government has cancelled an 85.8 million US dollar contract awarded by the former Rajapaksa regime to local construction firm Access Engineering. This was because no competitive tender procedure had been followed in the award of the contract and Access Engineering lacked experience for the runway work, Ports and Aviation Minister Ranatunga told the Cabinet of ministers. No major repair work has been done on the runway after it was opened to air traffic in 1986. The International Civil Aviation Organization has recommended in their audit observation of Sri Lankan airports that an overlaying of the runway to improve surface condition has to be done. This was to ensure "the safe operation of aircraft as some cracks have appeared on the runway surface," according to the proposal. Access Engineering's original proposal in August 2014 was 103.6 million US dollars but this was negotiated down to 85.8 million dollars, which still "was 25 percent over the engineer's estimate," it said. That original bid was subject to renegotiation with Access Engineering to reduce the final bid price. But the then-Cabinet of ministers was told the negotiations were not successful and contract awarded o Access at 85.8 million dollars, Ranatunga has said Access Engineering's "quoted price is also comparatively high" as revealed by inquiries from Al Naboodah Construction Group LLC of Dubai, UAE and Colas Ltd. Birmingham, UK which done similar overlay work on runways in Dubai International Airport and London Gatwick International Airport. [/SIZE] economynext[/CENTER] [/QUOTE]
Insert quotes…
Verification
Hata thunen beduwama keeyada? (60 bedeema thuna)
Post reply
Top
Bottom