Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
ZTE MF283U 4G Unlocked Router (Used)
ayanthamaxi
Updated:
Sunday at 8:26 PM
ලංකාවේ හොඳම උපකාරක පන්ති සහ ගුරුවරුන් එකම තැනකින් - TopTuition.lk
dulithapathum
Updated:
Jul 18, 2026
Colombo
RidhMathraa ’26 🎶✨
Tmadhusanka
Updated:
Jul 15, 2026
Ad icon
Colombo
PXN V10 Pro Direct Drive Racing Wheel (Under Warranty)
Abdur Rahman
Updated:
Jul 15, 2026
Ad icon
USDT ණය සේවාව - USDT Loan Service
පුරවැසියා
Updated:
Jul 15, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
✈✈ Aviation ✈✈
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Hashan dis" data-source="post: 19324677" data-attributes="member: 124785"><p><strong><span style="font-size: 12px"> BIA’s temporary shutdown in 2017 </span></strong></p><p><strong></strong></p><p><strong></strong></p><p><strong></strong><span style="font-size: 15px">Sri Lanka’s main international airport, Bandaranaike International Airport (BIA) is scheduled to partially close in 2017 for three months to carry out maintenance work on the runway, Civil Aviation Authority Director General (DG) H.M.C. Nimalsiri told the Business Times on Friday.</span></p><p><span style="font-size: 15px">He noted that this would be decided early since airlines need to be informed one year ahead of such closures.</span></p><p> <span style="font-size: 15px">In this respect, he pointed out that this would be the first time such overlaying or re-surfacing would be carried out on the runway at the BIA since its construction in 1986.</span></p><p><span style="font-size: 15px">This would amount to a closure of the airport operations for eight hours per day for a period of three months, the DG said.</span></p><p> <span style="font-size: 15px">Mr. Nimalsiri said that re-surfacing would be carried out on the runway due to the wear and tear on it and since the friction level on it could come down over use throughout the years and also due to loose elements as well.</span></p><p><span style="font-size: 15px">He pointed out that a lot of safety hazards were at stake unless the runway was not maintained properly that would be carried out in one year’s time. The cost of the project is yet to be estimated and currently the CAA is planning on working out how to make the necessary arrangements to ensure there would be fewer disturbances to traffic at the airport, he said.</span></p><p><span style="font-size: 15px">“We will find the least congested hours causing least disturbance for airlines and work out an alternative,” the DG said.</span></p><p> <span style="font-size: 15px">Currently, there are 175 aircraft movements per day and the closure would affect airport operations, hotels and the rest of the country as well, he pointed out.</span></p><p><span style="font-size: 15px">Expansion work on the BIA is ongoing at a cost of Rs.80 billion that would enhance its capacity from the current 7.8 million to 15 million upon completion within three year, it was stated.</span></p><p><span style="font-size: 15px"></span></p><p><span style="font-size: 15px"><span style="font-size: 10px">Sunday times</span></span></p><p><span style="font-size: 15px"></span></p></blockquote><p></p>
[QUOTE="Hashan dis, post: 19324677, member: 124785"] [B][SIZE=3] BIA’s temporary shutdown in 2017 [/SIZE] [/B][SIZE=4]Sri Lanka’s main international airport, Bandaranaike International Airport (BIA) is scheduled to partially close in 2017 for three months to carry out maintenance work on the runway, Civil Aviation Authority Director General (DG) H.M.C. Nimalsiri told the Business Times on Friday.[/SIZE] [SIZE=4]He noted that this would be decided early since airlines need to be informed one year ahead of such closures. In this respect, he pointed out that this would be the first time such overlaying or re-surfacing would be carried out on the runway at the BIA since its construction in 1986.[/SIZE] [SIZE=4]This would amount to a closure of the airport operations for eight hours per day for a period of three months, the DG said. Mr. Nimalsiri said that re-surfacing would be carried out on the runway due to the wear and tear on it and since the friction level on it could come down over use throughout the years and also due to loose elements as well.[/SIZE] [SIZE=4]He pointed out that a lot of safety hazards were at stake unless the runway was not maintained properly that would be carried out in one year’s time. The cost of the project is yet to be estimated and currently the CAA is planning on working out how to make the necessary arrangements to ensure there would be fewer disturbances to traffic at the airport, he said.[/SIZE] [SIZE=4]“We will find the least congested hours causing least disturbance for airlines and work out an alternative,” the DG said. Currently, there are 175 aircraft movements per day and the closure would affect airport operations, hotels and the rest of the country as well, he pointed out.[/SIZE] [SIZE=4]Expansion work on the BIA is ongoing at a cost of Rs.80 billion that would enhance its capacity from the current 7.8 million to 15 million upon completion within three year, it was stated. [SIZE=2]Sunday times[/SIZE] [/SIZE] [/QUOTE]
Insert quotes…
Verification
Asuwa dahayen wadi kalama keeyada?
Post reply
Top
Bottom