Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
USA Linux OpenVZ VPS අඩු මිලකට
Nadun26
Updated:
Today at 6:46 PM
Ad icon
Shared Hosting වාර්ෂිකව රු 2200 සිට!
Nadun26
Updated:
Today at 11:38 AM
හොඳ, දැන්වීම්-රහිත (ad-free) ආයුර්වේද ඇප් එකක් සොයා ගැනීමට නොහැකි වූ නිසා, මමම එකක් නිර්මාණය කළා
kitchen_discussions
Updated:
Yesterday at 2:34 AM
Ad icon
Iptv
musicking
Updated:
Sunday at 9:52 AM
Ad icon
ZTE MF283U 4G Unlocked Router (Used)
ayanthamaxi
Updated:
Jul 19, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
A test rail to be operated on Matara-Beliatta railway line on Sunday
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Bus Ajith" data-source="post: 24091597" data-attributes="member: 566854"><p><img src="http://www.dailynews.lk/sites/default/files/news/2019/01/04/trackRepair.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p></p><p></p><p>A test rail will be operated on the newly constructed Matara-Beliatta railway line on January 6 to test the operations aspects of the railway line under the patronage of Transport and Civil aviation Minister Arjuna Ranathunga.</p><p>The Matara-Kataragama railway line project is being carried out in three stages. Under the first stage, 26.75 km long stretch between Matara and Beliatta has already been completed . It will be vested with the public shortly.</p><p>The second phase of the project is the 48 kilometre stretch of track from Beliatta to Hambantota and in the third phase, the track will be extended by another 39 kilometres from Hambantota to Kataragama.</p><p>The railway project, funded by a $ 278 million loan from China EXIM Bank, is being built by the China National Machinery Import and Export Corporation (CMC) and China Railway Services Company under the supervision of Central Engineering Consultancy Bureau.</p><p>The main railway stations have been constructed at Kekunadura, Bambarenda, Wewrukannala and Beliatta while there were also two other sub stations at Piladuwa and Veherahena along the new railway track.</p><p>This is the most modern railway line in Sri Lanka where a train can operate at a speed limit of 120 kmph.</p><p>The main railway station at Beliatta is 300 metres in length. Underground tunnels have been made for passengers instead of overpasses to move across the platforms of the station.</p><p>Sri Lanka’s longest rail tunnel has been built on this line from Naakuttigama to Kekanadura railway station. It is 615 metres in length. Meanwhile a 268 metre long tunnel has been built at Bambarenda along this rail track.</p></blockquote><p></p>
[QUOTE="Bus Ajith, post: 24091597, member: 566854"] [IMG]http://www.dailynews.lk/sites/default/files/news/2019/01/04/trackRepair.jpg[/IMG] A test rail will be operated on the newly constructed Matara-Beliatta railway line on January 6 to test the operations aspects of the railway line under the patronage of Transport and Civil aviation Minister Arjuna Ranathunga. The Matara-Kataragama railway line project is being carried out in three stages. Under the first stage, 26.75 km long stretch between Matara and Beliatta has already been completed . It will be vested with the public shortly. The second phase of the project is the 48 kilometre stretch of track from Beliatta to Hambantota and in the third phase, the track will be extended by another 39 kilometres from Hambantota to Kataragama. The railway project, funded by a $ 278 million loan from China EXIM Bank, is being built by the China National Machinery Import and Export Corporation (CMC) and China Railway Services Company under the supervision of Central Engineering Consultancy Bureau. The main railway stations have been constructed at Kekunadura, Bambarenda, Wewrukannala and Beliatta while there were also two other sub stations at Piladuwa and Veherahena along the new railway track. This is the most modern railway line in Sri Lanka where a train can operate at a speed limit of 120 kmph. The main railway station at Beliatta is 300 metres in length. Underground tunnels have been made for passengers instead of overpasses to move across the platforms of the station. Sri Lanka’s longest rail tunnel has been built on this line from Naakuttigama to Kekanadura railway station. It is 615 metres in length. Meanwhile a 268 metre long tunnel has been built at Bambarenda along this rail track. [/QUOTE]
Insert quotes…
Verification
Winadiyakata thappara keeyak tibeda?
Post reply
Top
Bottom