Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Puffin Rock Characters Plush Toy Set
anil1961
Updated:
Saturday at 3:51 PM
Toyota Vitz scp10 For Sale
Lakmal Bandara
Updated:
Wednesday at 10:50 AM
Kandy
Welcome all my all new pet shop Bark.lk
dilumrane
Updated:
Nov 2, 2026
Windows RDP Only Rs.500 a month
Blogerwiki
Updated:
Nov 1, 2026
Ad icon
V2ray VPN for Tunneling
hu KANNA
Updated:
Oct 22, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
News
Boeing 787 advancing toward test flight by July 1
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="mudrana" data-source="post: 4470869" data-attributes="member: 17378"><p><img src="http://top-buzz.com/wp-content/boeing_787.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p><img src="http://www.aircanada.com/en/about/media/facts/documents/AC_787.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>EVERETT, Wash. (AP) -- The first Boeing 787 is in the final stages of production and should be ready as planned for the long-delayed first test flight before July 1, Boeing Co. officials said Wednesday.</p><p></p><p>About 60 percent of the material needed to certify the 787 as an airplane and to certify assembly processes has been submitted to the Federal Aviation Administration, chief project engineer Michael P. Delaney told reporters.</p><p></p><p>Compared with the pace of work toward certification of other models, "this is far superior to anything we've ever done before," Delaney said.</p><p></p><p>The first model is now in the paint shop, the last stop before it is rolled out of Boeing's huge widebody aircraft assembly plant here. Delaney said the first test flight will be three to 10 days after that.</p><p></p><p>The first test flight was planned for late 2007 with deliveries to begin in May 2008, but a series of delays resulted from four production snarls and an eight-week Machinists union strike last fall.</p><p></p><p>Boeing officials would not give a tentative date for the first flight, only that it is planned in the second quarter, with takeoff from Paine Field south of Everett and landing about three hours later at King County International Airport, known as Boeing Field, in south Seattle.</p><p></p><p>Six planes -- four with Rolls Royce engines and two with General Electric engines --are being assembled for about 8 1/2 months of test flights, about two months fewer than for previous models, followed by FAA airworthiness certification for commercial service and the first delivery in the first quarter of 2010.</p><p></p><p>The time savings is chiefly in more efficient installation and removal of special gear for the test flights, Rasor said.</p><p></p><p>Separately, The Seattle Times reported that Boeing has announced improvements to the 737 that include more overhead passenger room and more efficient engines.</p><p></p><p>The cabin change means passengers should be able to stand up without hunching beneath luggage bins while getting into and out of seats. The more efficient engines were developed by CFM, a joint venture of GE and Snecma of France.</p></blockquote><p></p>
[QUOTE="mudrana, post: 4470869, member: 17378"] [IMG]http://top-buzz.com/wp-content/boeing_787.jpg[/IMG] [IMG]http://www.aircanada.com/en/about/media/facts/documents/AC_787.jpg[/IMG] EVERETT, Wash. (AP) -- The first Boeing 787 is in the final stages of production and should be ready as planned for the long-delayed first test flight before July 1, Boeing Co. officials said Wednesday. About 60 percent of the material needed to certify the 787 as an airplane and to certify assembly processes has been submitted to the Federal Aviation Administration, chief project engineer Michael P. Delaney told reporters. Compared with the pace of work toward certification of other models, "this is far superior to anything we've ever done before," Delaney said. The first model is now in the paint shop, the last stop before it is rolled out of Boeing's huge widebody aircraft assembly plant here. Delaney said the first test flight will be three to 10 days after that. The first test flight was planned for late 2007 with deliveries to begin in May 2008, but a series of delays resulted from four production snarls and an eight-week Machinists union strike last fall. Boeing officials would not give a tentative date for the first flight, only that it is planned in the second quarter, with takeoff from Paine Field south of Everett and landing about three hours later at King County International Airport, known as Boeing Field, in south Seattle. Six planes -- four with Rolls Royce engines and two with General Electric engines --are being assembled for about 8 1/2 months of test flights, about two months fewer than for previous models, followed by FAA airworthiness certification for commercial service and the first delivery in the first quarter of 2010. The time savings is chiefly in more efficient installation and removal of special gear for the test flights, Rasor said. Separately, The Seattle Times reported that Boeing has announced improvements to the 737 that include more overhead passenger room and more efficient engines. The cabin change means passengers should be able to stand up without hunching beneath luggage bins while getting into and out of seats. The more efficient engines were developed by CFM, a joint venture of GE and Snecma of France. [/QUOTE]
Insert quotes…
Verification
Hath warak paha keeyada? (hatha wadikireema paha)
Post reply
Top
Bottom