Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
🔒 NordVPN Premium – 3 Months
hrdilshan
Updated:
Yesterday at 8:29 PM
🚀 Microsoft Office 365 Pro Plus – Lifetime Access! 🚀
hrdilshan
Updated:
Yesterday at 8:28 PM
Linkedin Premium Business / Careere /Sales Navigator - 1/2/3/6/9/12 Months - Reddem Link
hrdilshan
Updated:
Yesterday at 8:27 PM
Colombo
YEYE 3 in 1 Instant Coffee Mix 50 Sachet
Romeshka
Updated:
Wednesday at 12:16 AM
Colombo
Red Hat Certified System Administrator (RHCSA) - RHEL 10
Sanjeewani95
Updated:
Jul 3, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
News
Boeing 787 Unveiled in the Virtual World
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Anusha" data-source="post: 137697" data-attributes="member: 828"><p>Source: Dailytech.com</p><p></p><p><strong>Boeing's 787 Dreamliner is on track to make its first flight in August 2007</strong></p><p></p><p>While Airbus has run into some production snags with its A380 Superjumbo that have cost it customers, Boeing appears to be moving ahead on schedule with its smaller 787 Dreamliner. Boeing just recently announced that it has completed the "virtual rollout" of its new composite-bodied aircraft.</p><p></p><p>"Today's virtual rollout is the culmination of many months of effort by thousands of team members at Boeing and its 787 partners. Through the use of our new digital toolset, provided by Dassault Systemes, the team has proven the ability to manufacture 787 designs," said Mike Bair, VP and GM for the Dreamliner program.</p><p></p><p>Through the use of a powerful Dassault computer/software system, Boeing has been able to trim costs by 20% and cut a year from production on the Dreamliner. Engineers have also been able to see how parts will fit together in the virtual world before running into possible snags on a real production line.</p><p></p><p><img src="http://images.dailytech.com/nimage/3285_large_Boeing-787-Dreamliner-.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>"Our tools have enabled us to model the entire production process from our partners' factories to our own. We have found errors in simulation that would have been costly to find in production and have been able to design corrections quickly to keep the program on track," said Bair.</p><p></p><p>If you may recall, the Airbus A380 has been delayed by a year due to problems with the electrical harness which consists of 100,000 wires and 40,300 connectors. These problems were found during production rather than earlier in the design process of the aircraft.</p><p></p><p><img src="http://images.dailytech.com/nimage/3286_large_787-inflight.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>Boeing is currently taking steps to reduce weight on the Dreamliner by switching from aluminum to titanium on some parts used in the aircraft. In order to meet the design targets for fuel efficiency and range, the switch to titanium is a necessity. Not surprisingly, the computer simulations have been instrumental in pointing out critical components that are ripe for the switch to titanium.</p><p></p><p>The Boeing 787 Dreamliner is expected to make its first flight in August of 2007 with delivery starting in 2008. As of now, Boeing has orders for 458 planes from 37 customers.</p><p></p><p>"It's a challenge, no doubt about it. This is the team, all of us together -- our customers, our partners and each of us -- who will bring this airplane to life. It's an amazing journey from where we started just four years ago. But the best part is yet to come," said Bair.</p></blockquote><p></p>
[QUOTE="Anusha, post: 137697, member: 828"] Source: Dailytech.com [B]Boeing's 787 Dreamliner is on track to make its first flight in August 2007[/B] While Airbus has run into some production snags with its A380 Superjumbo that have cost it customers, Boeing appears to be moving ahead on schedule with its smaller 787 Dreamliner. Boeing just recently announced that it has completed the "virtual rollout" of its new composite-bodied aircraft. "Today's virtual rollout is the culmination of many months of effort by thousands of team members at Boeing and its 787 partners. Through the use of our new digital toolset, provided by Dassault Systemes, the team has proven the ability to manufacture 787 designs," said Mike Bair, VP and GM for the Dreamliner program. Through the use of a powerful Dassault computer/software system, Boeing has been able to trim costs by 20% and cut a year from production on the Dreamliner. Engineers have also been able to see how parts will fit together in the virtual world before running into possible snags on a real production line. [IMG]http://images.dailytech.com/nimage/3285_large_Boeing-787-Dreamliner-.jpg[/IMG] "Our tools have enabled us to model the entire production process from our partners' factories to our own. We have found errors in simulation that would have been costly to find in production and have been able to design corrections quickly to keep the program on track," said Bair. If you may recall, the Airbus A380 has been delayed by a year due to problems with the electrical harness which consists of 100,000 wires and 40,300 connectors. These problems were found during production rather than earlier in the design process of the aircraft. [IMG]http://images.dailytech.com/nimage/3286_large_787-inflight.jpg[/IMG] Boeing is currently taking steps to reduce weight on the Dreamliner by switching from aluminum to titanium on some parts used in the aircraft. In order to meet the design targets for fuel efficiency and range, the switch to titanium is a necessity. Not surprisingly, the computer simulations have been instrumental in pointing out critical components that are ripe for the switch to titanium. The Boeing 787 Dreamliner is expected to make its first flight in August of 2007 with delivery starting in 2008. As of now, Boeing has orders for 458 planes from 37 customers. "It's a challenge, no doubt about it. This is the team, all of us together -- our customers, our partners and each of us -- who will bring this airplane to life. It's an amazing journey from where we started just four years ago. But the best part is yet to come," said Bair. [/QUOTE]
Insert quotes…
Verification
Asuwa dahayen wadi kalama keeyada?
Post reply
Top
Bottom