Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
NURSING , CAREGIVER , HOTEL & BEAUTY COURSES
IVA Para Medical Campus
Updated:
Today at 9:24 AM
Handmade Character Soft Toys Peppa Pig Family
anil1961
Updated:
Yesterday at 9:58 PM
Ad icon
Video Content Creator
pramukag
Updated:
Sunday at 6:10 AM
Ad icon
QA Engineer Intern
pramukag
Updated:
Sunday at 6:07 AM
Ad icon
Sell your Land, House on idamata.lk for FREE
sajith.xp.pk
Updated:
Jun 25, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
ElaKiri Magic
Show/Watch Magic
Discovery - Extreme Engineering - Iceland Tunnels
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="iceflow" data-source="post: 9703047" data-attributes="member: 345198"><p>[CODE]</p><p></p><p>Fifty years after the idea of harnessing the frightening force of Iceland’s glacial rivers was first conceived, the vision is about to be realised. Around 200 miles northeast of the capital, Reykjavik, engineers are hard at work drilling 72km of tunnels deep in the mountains.</p><p></p><p>Three full-face boring machines (TBMs), have been specially shipped from the US to this remote site, 100 miles south of the Arctic Circle. In fact, one has just completed work on a new subway route in New York. rapidshare.com</p><p></p><p>Manufactured by American tool company, Robbins, the TBMs each measure 7m in diameter and weigh over 80 tons. Digging an average of 25m a day, each TBM needs 3 megawatts of power to drive it. Other sections of the tunnels will have to be excavated by explosives and power tools.</p><p></p><p>The tunnel’s purpose is to guide water to the valley floor from reservoirs that are also currently under construction. The cascading water will drive six turbines, each with a rated output of 115 megawatts. With a total capacity of 690 megawatts, it will be the biggest hydropower plant in Europe. The project completion is scheduled for 2009.[/CODE]</p><p></p><p>[CODE]http://pyramidfiles.com/if3q9mi9w1wv/Extreme_Engineering_-_Iceland_Tunnels.avi.html[/CODE]</p></blockquote><p></p>
[QUOTE="iceflow, post: 9703047, member: 345198"] [CODE] Fifty years after the idea of harnessing the frightening force of Iceland’s glacial rivers was first conceived, the vision is about to be realised. Around 200 miles northeast of the capital, Reykjavik, engineers are hard at work drilling 72km of tunnels deep in the mountains. Three full-face boring machines (TBMs), have been specially shipped from the US to this remote site, 100 miles south of the Arctic Circle. In fact, one has just completed work on a new subway route in New York. rapidshare.com Manufactured by American tool company, Robbins, the TBMs each measure 7m in diameter and weigh over 80 tons. Digging an average of 25m a day, each TBM needs 3 megawatts of power to drive it. Other sections of the tunnels will have to be excavated by explosives and power tools. The tunnel’s purpose is to guide water to the valley floor from reservoirs that are also currently under construction. The cascading water will drive six turbines, each with a rated output of 115 megawatts. With a total capacity of 690 megawatts, it will be the biggest hydropower plant in Europe. The project completion is scheduled for 2009.[/CODE] [CODE]http://pyramidfiles.com/if3q9mi9w1wv/Extreme_Engineering_-_Iceland_Tunnels.avi.html[/CODE] [/QUOTE]
Insert quotes…
Verification
Hata thunen beduwama keeyada? (60 bedeema thuna)
Post reply
Top
Bottom