Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Power Lifting Lever Belt
SkullVamp
Updated:
Saturday at 10:32 PM
Ad icon
port.lk Domain for sale
Lankan-Tech
Updated:
Saturday at 3:55 PM
Colombo
Kaduwela - Two Storey House for Sale
dilrasan
Updated:
Thursday at 2:23 PM
Ad icon
Wechat qr verification
Pawan2005
Updated:
Thursday at 1:28 AM
🚀 GOOGLE AI PRO 18 MONTHS ACTIVATION 🚀
sayuru bandara
Updated:
Wednesday at 5:34 PM
Electronics
Vehicles
Property
Search
Reply to thread
Forums
ElaKiri Traveler
Travel the World
Eagles Nest
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="dj gamaya" data-source="post: 13174030" data-attributes="member: 61857"><p style="text-align: center"><img src="http://2.bp.blogspot.com/-6Sy3aX2mG0A/UB0lMt7S74I/AAAAAAAAz10/t3dhlxy-LGE/s1600/Egaes+Nest+Hitler+House+-+002.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p> <p style="text-align: center"></p> <p style="text-align: center"></p><p style="text-align: center"><span style="font-family: 'Century Gothic'"><strong><span style="font-size: 15px"><em>Construction and usage</em></span></strong></span></p> <p style="text-align: center"></p> <p style="text-align: center"></p> <p style="text-align: center"><span style="font-family: 'Century Gothic'"><span style="font-size: 15px">The Kehlsteinhaus was commissioned by Martin Bormann, with construction proceeding over a 13-month period. It was completed in the summer of 1938, prior to its formal presentation to Hitler on his 50th birthday on April 20, 1939. It is situated on a ridge at the top of the Kehlstein mountain 1,834 m (6,017 ft), reached by a 6.5 km (4.0 mi) long and 4 m (13 ft) wide road that cost RM 30 million to build (about 150 million euros in 2007, adjusted in line with inflation). It includes five tunnels but only one hairpin turn and climbs 800 m (2,600 ft).</span></span></p> <p style="text-align: center"></p> <p style="text-align: center"></p> <p style="text-align: center"><img src="http://4.bp.blogspot.com/-Wv5pmyhqgf4/UB0lPHfdIxI/AAAAAAAAz18/Mbu8-VsZOWo/s1600/Egaes+Nest+Hitler+House+-+003.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p> <p style="text-align: center"></p> <p style="text-align: center"></p> <p style="text-align: center"><span style="font-family: 'Century Gothic'"><span style="font-size: 15px">The last 124 m (407 ft)[1] up to the Kehlsteinhaus are reached by an elevator bored straight down through the mountain and linked via a tunnel through the granite below that is 124 m (407 ft) long.[1] The inside of the large elevator car is surfaced with polished brass, Venetian mirrors and green leather (the elevator is still used daily). Construction of the mountain elevator system cost the lives of 12 construction workers. The main reception room is dominated by a fireplace of red Italian marble, presented by Mussolini, which was damaged by Allied soldiers chipping off pieces to take home as souvenirs. Much of the furniture was designed by Paul László.</span></span></p> <p style="text-align: center"></p></p> <p style="text-align: center"></p> <p style="text-align: center"></p></blockquote><p></p>
[QUOTE="dj gamaya, post: 13174030, member: 61857"] [CENTER][IMG]http://2.bp.blogspot.com/-6Sy3aX2mG0A/UB0lMt7S74I/AAAAAAAAz10/t3dhlxy-LGE/s1600/Egaes+Nest+Hitler+House+-+002.jpg[/IMG] [CENTER][FONT=Century Gothic][B][SIZE=4][I]Construction and usage[/I][/SIZE][/B][/FONT] [FONT=Century Gothic][SIZE=4]The Kehlsteinhaus was commissioned by Martin Bormann, with construction proceeding over a 13-month period. It was completed in the summer of 1938, prior to its formal presentation to Hitler on his 50th birthday on April 20, 1939. It is situated on a ridge at the top of the Kehlstein mountain 1,834 m (6,017 ft), reached by a 6.5 km (4.0 mi) long and 4 m (13 ft) wide road that cost RM 30 million to build (about 150 million euros in 2007, adjusted in line with inflation). It includes five tunnels but only one hairpin turn and climbs 800 m (2,600 ft).[/SIZE][/FONT] [IMG]http://4.bp.blogspot.com/-Wv5pmyhqgf4/UB0lPHfdIxI/AAAAAAAAz18/Mbu8-VsZOWo/s1600/Egaes+Nest+Hitler+House+-+003.jpg[/IMG] [FONT=Century Gothic][SIZE=4]The last 124 m (407 ft)[1] up to the Kehlsteinhaus are reached by an elevator bored straight down through the mountain and linked via a tunnel through the granite below that is 124 m (407 ft) long.[1] The inside of the large elevator car is surfaced with polished brass, Venetian mirrors and green leather (the elevator is still used daily). Construction of the mountain elevator system cost the lives of 12 construction workers. The main reception room is dominated by a fireplace of red Italian marble, presented by Mussolini, which was damaged by Allied soldiers chipping off pieces to take home as souvenirs. Much of the furniture was designed by Paul László.[/SIZE][/FONT] [/CENTER] [/CENTER] [/QUOTE]
Insert quotes…
Verification
Haya warak paha keeyada? (haya wadi kireema paha)
Post reply
Top
Bottom