Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
📸 SIGMA 85mm F1.4 DG HSM | Art — Nikon Mount
romeshnonis
Updated:
Yesterday at 3:56 PM
Google AI PRO - 18 Month
Sanathbh
Updated:
Yesterday at 2:42 PM
Ad icon
Singapore V2Ray VPN for Tunneling
hu KANNA
Updated:
Monday at 9:03 PM
Plan your Crypto & Forex entries before you take the trade
romeshnonis
Updated:
Monday at 3:20 AM
RHCSA, RHCE, AWS, Docker, Kubernetes Training
Sanjeewani95
Updated:
Sep 8, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
Education
Glass Bridge
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="ereshthush" data-source="post: 1089633" data-attributes="member: 21757"><p>The Glass Bridge Construction of the Skywalk began March of 2004 and is estimated to be completed by 4th quarter of 2006. Glass Bridge will be suspended 4,000 feet above the Colorado River on the very edge of the Grand Canyon. On May 2005, the final test was conducted and the stucture passed engineering requirements by 400 percent, enabling it to withstand the weight of 71 fully loaded Boeing 747 airplanes (more that 71 million pounds). The bridge will be able to sustain winds in excess of 100 miles per hour from 8 different directions, as well as an 8.0 magnitude earthquake within 50 miles. More than one million pounds of steel will go into the construction of the Grand Canyon sky walk..................</p><p></p><p>[ATTACH]4732[/ATTACH]</p></blockquote><p></p>
[QUOTE="ereshthush, post: 1089633, member: 21757"] The Glass Bridge Construction of the Skywalk began March of 2004 and is estimated to be completed by 4th quarter of 2006. Glass Bridge will be suspended 4,000 feet above the Colorado River on the very edge of the Grand Canyon. On May 2005, the final test was conducted and the stucture passed engineering requirements by 400 percent, enabling it to withstand the weight of 71 fully loaded Boeing 747 airplanes (more that 71 million pounds). The bridge will be able to sustain winds in excess of 100 miles per hour from 8 different directions, as well as an 8.0 magnitude earthquake within 50 miles. More than one million pounds of steel will go into the construction of the Grand Canyon sky walk.................. [ATTACH]4732._xfImport[/ATTACH] [/QUOTE]
Insert quotes…
Verification
Awruddata maasa keeyada?
Post reply
Top
Bottom