Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
GOOGLE AI PRO - 18 Month - Rs.500.00
Sanathbh
Updated:
Yesterday at 8:25 PM
📸 SIGMA 85mm F1.4 DG HSM | Art — Nikon Mount
romeshnonis
Updated:
Wednesday at 3:56 PM
Ad icon
Singapore V2Ray VPN for Tunneling
hu KANNA
Updated:
Monday at 9:03 PM
Plan your Crypto & Forex entries before you take the trade
romeshnonis
Updated:
Monday at 3:20 AM
RHCSA, RHCE, AWS, Docker, Kubernetes Training
Sanjeewani95
Updated:
Sep 8, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
News
Kelaniya Flyover opening today - 60 days only
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="saraprobe" data-source="post: 1690131" data-attributes="member: 13914"><p><img src="http://i32.tinypic.com/14344ye.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p><img src="http://i32.tinypic.com/2d9qwrq.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p>KELANIYA: The Kelaniya flyover will be opened today easing congestion on the Colombo-Kandy road. The project was completed in just 60 days setting a world record.</p><p></p><p>Highways and Road Development Minister Jeyaraj Fernandopulle told the Daily News that the feat represented a new landmark in the highways and roads development sector.</p><p><span style="color: Indigo"></span></p><p><span style="color: Indigo">“This construction is a world record since the assembly of the prefabricated flyover was completed within 60 days,” he said.</span></p><p><span style="color: Indigo"></span></p><p><span style="color: Indigo">“The record was earlier held by the Philippines. The Philippines Government completed assembling the prefabricated Malos flyover in Manila in 66 days. It is 300 meters in length.”</span></p><p></p><p>This was the first flyover built under the Government’s project to construct 222 bridges countrywide.</p><p></p><p><span style="color: Indigo">The length of the Kelaniya flyover is 325 meters. Under the first phase of the Kelaniya flyover, two lanes have been constructed. The second phase of the project is due to commence next month with the intention of constructing two lanes. The total cost of the project is estimated at Rs. 2.1 billion.</span></p><p><span style="color: Indigo"></span>^^^^</p><p>He said the Kelaniya flyover was built across the Peliyagoda railway crossing on the Colombo-Kandy main road to ease traffic congestion.</p><p></p><p>He said the Government has also embarked on a project to construct 20 flyovers and 218 bridges islandwide with Sterling Pounds 125 million assistance from the British Government.</p><p></p><p>A British Company in collaboration with the Access Engineering Company carried out the construction of the flyover.</p><p></p><p>According to the Railway Control Room, the Peliyagoda railway crossing is closed cumulatively eight hours a day.</p><p></p><p>He said around 75,000 vehicles travel along the railway crossing per day and it is a huge time waste due to traffic congestion. The Ministry is planing to commence the construction of the second flyover in Panadura on March 31.</p><p></p><p></p><p><a href="http://www.dailynews.lk/2008/03/25/news02.asp" target="_blank">DN</a></p></blockquote><p></p>
[QUOTE="saraprobe, post: 1690131, member: 13914"] [IMG]http://i32.tinypic.com/14344ye.jpg[/IMG] [IMG]http://i32.tinypic.com/2d9qwrq.jpg[/IMG] KELANIYA: The Kelaniya flyover will be opened today easing congestion on the Colombo-Kandy road. The project was completed in just 60 days setting a world record. Highways and Road Development Minister Jeyaraj Fernandopulle told the Daily News that the feat represented a new landmark in the highways and roads development sector. [COLOR="Indigo"] “This construction is a world record since the assembly of the prefabricated flyover was completed within 60 days,” he said. “The record was earlier held by the Philippines. The Philippines Government completed assembling the prefabricated Malos flyover in Manila in 66 days. It is 300 meters in length.”[/COLOR] This was the first flyover built under the Government’s project to construct 222 bridges countrywide. [COLOR="Indigo"]The length of the Kelaniya flyover is 325 meters. Under the first phase of the Kelaniya flyover, two lanes have been constructed. The second phase of the project is due to commence next month with the intention of constructing two lanes. The total cost of the project is estimated at Rs. 2.1 billion. [/COLOR]^^^^ He said the Kelaniya flyover was built across the Peliyagoda railway crossing on the Colombo-Kandy main road to ease traffic congestion. He said the Government has also embarked on a project to construct 20 flyovers and 218 bridges islandwide with Sterling Pounds 125 million assistance from the British Government. A British Company in collaboration with the Access Engineering Company carried out the construction of the flyover. According to the Railway Control Room, the Peliyagoda railway crossing is closed cumulatively eight hours a day. He said around 75,000 vehicles travel along the railway crossing per day and it is a huge time waste due to traffic congestion. The Ministry is planing to commence the construction of the second flyover in Panadura on March 31. [URL="http://www.dailynews.lk/2008/03/25/news02.asp"]DN[/URL] [/QUOTE]
Insert quotes…
Verification
Hata thunen beduwama keeyada? (60 bedeema thuna)
Post reply
Top
Bottom