Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
ZTE MF283U 4G Unlocked Router (Used)
ayanthamaxi
Updated:
Yesterday at 8:26 PM
ලංකාවේ හොඳම උපකාරක පන්ති සහ ගුරුවරුන් එකම තැනකින් - TopTuition.lk
dulithapathum
Updated:
Saturday at 8:07 AM
Colombo
RidhMathraa ’26 🎶✨
Tmadhusanka
Updated:
Wednesday at 11:58 PM
Ad icon
Colombo
PXN V10 Pro Direct Drive Racing Wheel (Under Warranty)
Abdur Rahman
Updated:
Wednesday at 10:23 PM
Ad icon
USDT ණය සේවාව - USDT Loan Service
පුරවැසියා
Updated:
Wednesday at 4:54 PM
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
Light Railway Project (LRT) got cancelled [Malabe and Colombo Fort]
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="EVC" data-source="post: 25470367" data-attributes="member: 125973"><p><span style="font-size: 26px"><strong>Govt. will construct LRT line <span style="color: rgb(226, 80, 65)">eventually</span>: Bandula</strong></span></p><p></p><p>The Government will set up a light railway transit (LRT) line between Malabe and Colombo in the future, Cabinet Spokesman Bandula Gunawardena said yesterday. </p><p></p><p>Speaking to reporters at the Government Information Department Gunawardena said that even though the Government had decided to suspend the $2.2 billion LRT project that was to be funded by the Japanese Government, Gunawardena insisted that the same construction would eventually take place. </p><p></p><p>“The Government believes this project can be done at lesser cost and fewer disruptions. Therefore we will work to complete the project at some point in the future,” he said. </p><p></p><p>The former Government kicked off the project in July 2019. The total investment for the project was expected to be $2.2 billion, and $1.85 billion was to be provided by the Japan International Cooperation Agency (JICA) as a soft loan. The interest rate of the loan for the civil works and procurement of equipment is 0.1%, and for the consultancy services is 0.01% per annum. The repayment period was 40 years, which includes a 12-year grace period.</p></blockquote><p></p>
[QUOTE="EVC, post: 25470367, member: 125973"] [SIZE=7][B]Govt. will construct LRT line [COLOR=rgb(226, 80, 65)]eventually[/COLOR]: Bandula[/B][/SIZE] The Government will set up a light railway transit (LRT) line between Malabe and Colombo in the future, Cabinet Spokesman Bandula Gunawardena said yesterday. Speaking to reporters at the Government Information Department Gunawardena said that even though the Government had decided to suspend the $2.2 billion LRT project that was to be funded by the Japanese Government, Gunawardena insisted that the same construction would eventually take place. “The Government believes this project can be done at lesser cost and fewer disruptions. Therefore we will work to complete the project at some point in the future,” he said. The former Government kicked off the project in July 2019. The total investment for the project was expected to be $2.2 billion, and $1.85 billion was to be provided by the Japan International Cooperation Agency (JICA) as a soft loan. The interest rate of the loan for the civil works and procurement of equipment is 0.1%, and for the consultancy services is 0.01% per annum. The repayment period was 40 years, which includes a 12-year grace period. [/QUOTE]
Insert quotes…
Verification
Payakata winadi keeyak tibeda?
Post reply
Top
Bottom