Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
ZTE MF283U 4G Unlocked Router (Used)
ayanthamaxi
Updated:
Sunday at 8:26 PM
ලංකාවේ හොඳම උපකාරක පන්ති සහ ගුරුවරුන් එකම තැනකින් - TopTuition.lk
dulithapathum
Updated:
Saturday at 8:07 AM
Colombo
RidhMathraa ’26 🎶✨
Tmadhusanka
Updated:
Jul 15, 2026
Ad icon
Colombo
PXN V10 Pro Direct Drive Racing Wheel (Under Warranty)
Abdur Rahman
Updated:
Jul 15, 2026
Ad icon
USDT ණය සේවාව - USDT Loan Service
පුරවැසියා
Updated:
Jul 15, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
Light Railway Project (LRT) got cancelled [Malabe and Colombo Fort]
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="EVC" data-source="post: 25478404" data-attributes="member: 125973"><p><strong><span style="font-size: 22px"><span style="color: rgb(226, 80, 65)">update</span></span></strong></p><p><span style="font-size: 26px"><strong><span style="color: rgb(226, 80, 65)">Colombo-Malabe LRT to go ahead as PPP <img src="/styles/default/xenforo/smilies/default/yes.gif" class="smilie" loading="lazy" alt=":yes:" title="Yes :yes:" data-shortname=":yes:" /> </span></strong></span></p><p></p><ul> <li data-xf-list-type="ul"><span style="color: rgb(247, 218, 100)"><span style="font-size: 18px"> </span></span></li> <li data-xf-list-type="ul"><span style="color: rgb(247, 218, 100)"><span style="font-size: 18px"><strong>LRT which was to be constructed with loan from JICA will be remodelled to continue as PPP with foreign investor</strong></span></span></li> <li data-xf-list-type="ul"><span style="color: rgb(247, 218, 100)"><span style="font-size: 18px"> </span></span></li> <li data-xf-list-type="ul"><span style="color: rgb(247, 218, 100)"><span style="font-size: 18px"><strong>Investor to be chosen after call from international open competitive bids</strong></span></span></li> <li data-xf-list-type="ul"><span style="color: rgb(247, 218, 100)"><span style="font-size: 18px"> </span></span></li> <li data-xf-list-type="ul"><strong><span style="color: rgb(247, 218, 100)"><span style="font-size: 18px">Project will be remodelled to include residential, office and commercial areas</span></span></strong></li> </ul><p></p><p></p><p><em><strong>By Chandani Kirinde</strong></em></p><p></p><p></p><p></p><p>The Light Rail Transit (LRT) System from Colombo to Malabe, the construction of which the previous Government had entered into agreement with the Japan International Cooperation Agency (JICA), will go ahead but as a Public-Private Partnership (PPP) with a foreign investor who is yet to be identified.</p><p></p><p>Ministry of Urban Development, Water Supply and Housing Facilities Secretary Priyath Bandu Wickrama said the project will be converted from a loan project to an investor project.</p><p></p><p>“We have not identified an investor so far, but it will be done after we call for international open competitive bidding. We will pick the investor who is most beneficial to the country,” he said.</p><p></p><p>He said the land acquisition for the project is now underway and it will be at least May 2021 when it is completed, and by then an investor can be finalised so that the project can be completed without any delay,” Bandu Wickrama told reporters at a press briefing.</p><p></p><p>He said the Ministry has not done a Request For Proposal (RFP) document so far, but they have a model RFP document which has been finalised to develop another rail track. “To suit the LRT project, we have to do a little modification. Most probably before the end of this year we will have the RFP ready,” he said.</p><p></p><p>The Secretary said that other than the rail track and the rolling stock, the idea is to develop station lands. “The earlier model was only to have stations, but we plan to allow the investor to build buildings on top of the stations and use those as residential, office and commercial areas. There are the ongoing discussions to remodel the project to suit the revenue model. I think it is going to be viable,” Bandu Wickrama said.</p><p></p><p>He said at least another $ 2 billion worth of investment will be added to the LRT project with the addition of the commercial and multipurpose model. The total cost of the project could estimate to be around $ 2.2 billion.</p><p></p><p>He said that of the $ 280 million (approx. Rs. 48 billion) concessionary loan agreement signed between the Government of Sri Lanka and JICA for engineering services and construction of a LRT, only $ 20 million has been utilised for consultancy work, hence there was no truth to reports that the Government would have to pay over $ 100 million for compensation for the cancellation of the project.</p><p></p><p>He said he had met with JICA officials to discuss the matter and that the agency will continue to support projects in the future.</p></blockquote><p></p>
[QUOTE="EVC, post: 25478404, member: 125973"] [B][SIZE=6][COLOR=rgb(226, 80, 65)]update[/COLOR][/SIZE][/B] [SIZE=7][B][COLOR=rgb(226, 80, 65)]Colombo-Malabe LRT to go ahead as PPP :yes: [/COLOR][/B][/SIZE] [LIST] [*][COLOR=rgb(247, 218, 100)][SIZE=5] [/SIZE][/COLOR] [*][COLOR=rgb(247, 218, 100)][SIZE=5][B]LRT which was to be constructed with loan from JICA will be remodelled to continue as PPP with foreign investor[/B][/SIZE][/COLOR] [*][COLOR=rgb(247, 218, 100)][SIZE=5] [/SIZE][/COLOR] [*][COLOR=rgb(247, 218, 100)][SIZE=5][B]Investor to be chosen after call from international open competitive bids[/B][/SIZE][/COLOR] [*][COLOR=rgb(247, 218, 100)][SIZE=5] [/SIZE][/COLOR] [*][B][COLOR=rgb(247, 218, 100)][SIZE=5]Project will be remodelled to include residential, office and commercial areas[/SIZE][/COLOR][/B] [/LIST] [I][B]By Chandani Kirinde[/B][/I] The Light Rail Transit (LRT) System from Colombo to Malabe, the construction of which the previous Government had entered into agreement with the Japan International Cooperation Agency (JICA), will go ahead but as a Public-Private Partnership (PPP) with a foreign investor who is yet to be identified. Ministry of Urban Development, Water Supply and Housing Facilities Secretary Priyath Bandu Wickrama said the project will be converted from a loan project to an investor project. “We have not identified an investor so far, but it will be done after we call for international open competitive bidding. We will pick the investor who is most beneficial to the country,” he said. He said the land acquisition for the project is now underway and it will be at least May 2021 when it is completed, and by then an investor can be finalised so that the project can be completed without any delay,” Bandu Wickrama told reporters at a press briefing. He said the Ministry has not done a Request For Proposal (RFP) document so far, but they have a model RFP document which has been finalised to develop another rail track. “To suit the LRT project, we have to do a little modification. Most probably before the end of this year we will have the RFP ready,” he said. The Secretary said that other than the rail track and the rolling stock, the idea is to develop station lands. “The earlier model was only to have stations, but we plan to allow the investor to build buildings on top of the stations and use those as residential, office and commercial areas. There are the ongoing discussions to remodel the project to suit the revenue model. I think it is going to be viable,” Bandu Wickrama said. He said at least another $ 2 billion worth of investment will be added to the LRT project with the addition of the commercial and multipurpose model. The total cost of the project could estimate to be around $ 2.2 billion. He said that of the $ 280 million (approx. Rs. 48 billion) concessionary loan agreement signed between the Government of Sri Lanka and JICA for engineering services and construction of a LRT, only $ 20 million has been utilised for consultancy work, hence there was no truth to reports that the Government would have to pay over $ 100 million for compensation for the cancellation of the project. He said he had met with JICA officials to discuss the matter and that the agency will continue to support projects in the future. [/QUOTE]
Insert quotes…
Verification
Winadiyakata thappara keeyak tibeda?
Post reply
Top
Bottom