Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
NURSING , CAREGIVER , HOTEL & BEAUTY COURSES
IVA Para Medical Campus
Updated:
Yesterday at 9:24 AM
Handmade Character Soft Toys Peppa Pig Family
anil1961
Updated:
Wednesday at 9:58 PM
Ad icon
Video Content Creator
pramukag
Updated:
Sunday at 6:10 AM
Ad icon
QA Engineer Intern
pramukag
Updated:
Sunday at 6:07 AM
Ad icon
Sell your Land, House on idamata.lk for FREE
sajith.xp.pk
Updated:
Jun 25, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
The Power Cut Schedule. (October/2016)
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Ceylon Electricity Board" data-source="post: 20804173" data-attributes="member: 556116"><p><span style="font-size: 12px"><strong>Interruption of Electricity supply due to the limitation of power generation owing to a break down at the Lakwijaya Coal power plant, Norochcholai.</strong></span></p><p><span style="font-size: 12px"></span></p><p><span style="font-size: 12px"><img src="https://scontent-sit4-1.xx.fbcdn.net/t31.0-8/14711626_544473892413567_5600923513561037766_o.png" alt="" class="fr-fic fr-dii fr-draggable " style="" /></span></p><p><span style="font-size: 12px"></span></p><p><span style="font-size: 12px">Download the Power Cut schedule :- <a href="http://bit.ly/PowerCutSchedule" target="_blank">http://bit.ly/PowerCutSchedule</a></span></p><p><span style="font-size: 12px"></span></p><p><span style="font-size: 12px"><span style="color: RoyalBlue">At the moment, generation of electricity has been limited due to a break down occurred at the Lakvijaya Coal power plant, Norochcholai as a result of a technical breakdown in the transmission lines on 15th October, 2016 at 10.46 A.M.</span></span></p><p><span style="font-size: 12px"><span style="color: RoyalBlue"></span></span></p><p><span style="font-size: 12px"><span style="color: RoyalBlue">This situation had limited the electricity generation capacity by 900 MW. However, Ceylon Electricity Board had taken steps to maximize the power generation by utilizing other thermal and hydro power plants. But due to excessive demand, the power supply has to be limit for certain duration to maintain the stability of the system.</span></span></p><p><span style="font-size: 12px"><span style="color: RoyalBlue"></span></span></p><p><span style="font-size: 12px"><span style="color: RoyalBlue">Accordingly, a three and half hour power outage will be in effect from 17th – 21st October 2016. A 21/2 hours (two and half hours) power cut will be experienced during the day and one hour power cut in the night time due to the limitation of electricity supply.</span></span></p><p><span style="font-size: 12px"><span style="color: RoyalBlue"></span></span></p><p><span style="font-size: 12px"><span style="color: RoyalBlue">Four geographical segments have been demarcated across the country to impose the power cuts. But this schedule will not be applied to the Colombo city limits, Hospitals and Industrial Zones. However at this instance there is a challenge to generate electricity to cater the demand. Hence, we appeal to the electricity consumers to use electricity more efficiently and to reduce consumption. If the demand for electricity can be reduced, the duration of the power cut can be further reduced.</span></span></p><p><span style="font-size: 12px"><span style="color: RoyalBlue"></span></span></p><p><span style="font-size: 12px"><span style="color: RoyalBlue">The ministry of power and renewable energy & The Ceylon Electricity Board would like to express its deepest regret for the inconvenience face by the public.</span></span></p><p><span style="font-size: 12px"></span></p><p><span style="font-size: 12px"></span></p></blockquote><p></p>
[QUOTE="Ceylon Electricity Board, post: 20804173, member: 556116"] [SIZE="3"][B]Interruption of Electricity supply due to the limitation of power generation owing to a break down at the Lakwijaya Coal power plant, Norochcholai.[/B] [IMG]https://scontent-sit4-1.xx.fbcdn.net/t31.0-8/14711626_544473892413567_5600923513561037766_o.png[/IMG] Download the Power Cut schedule :- [url]http://bit.ly/PowerCutSchedule[/url] [COLOR="RoyalBlue"]At the moment, generation of electricity has been limited due to a break down occurred at the Lakvijaya Coal power plant, Norochcholai as a result of a technical breakdown in the transmission lines on 15th October, 2016 at 10.46 A.M. This situation had limited the electricity generation capacity by 900 MW. However, Ceylon Electricity Board had taken steps to maximize the power generation by utilizing other thermal and hydro power plants. But due to excessive demand, the power supply has to be limit for certain duration to maintain the stability of the system. Accordingly, a three and half hour power outage will be in effect from 17th – 21st October 2016. A 21/2 hours (two and half hours) power cut will be experienced during the day and one hour power cut in the night time due to the limitation of electricity supply. Four geographical segments have been demarcated across the country to impose the power cuts. But this schedule will not be applied to the Colombo city limits, Hospitals and Industrial Zones. However at this instance there is a challenge to generate electricity to cater the demand. Hence, we appeal to the electricity consumers to use electricity more efficiently and to reduce consumption. If the demand for electricity can be reduced, the duration of the power cut can be further reduced. The ministry of power and renewable energy & The Ceylon Electricity Board would like to express its deepest regret for the inconvenience face by the public.[/COLOR] [/SIZE] [/QUOTE]
Insert quotes…
Verification
Dawasata paya keeyak thibeda?
Post reply
Top
Bottom