Construction rates

Amila llll

Well-known member
  • Jun 19, 2009
    6,788
    6,349
    113
    menna me list eke aluth rates danna ekkenek kiyahanko

    painting
    plastering
    4'0"x11" 1 1/2"thk wooden step(ලීමාර ) fix krntth ekka
    handrail cable
     

    blueray911

    Member
    Dec 2, 2011
    160
    37
    0
    painting -

    inside 30-35 (with material), 6-7 (Labour only)
    outside 15-20 (with material), 6-7 (Labour only)

    plastering -

    inside 60-65 (with material), 30-35 (Labour only)
    outside 45 (Labour only)

    (Rates - LKR per square-feet)

    Anik ewa danne ne bnzz..
     
    • Like
    Reactions: Amila llll