The burning of substandard coal has caused the pile of ash at the Lakvijaya power plant (LVP) to grow to 12-13 metres (39 to 42 feet) high—just two metres away from the top of the wind barrier, which is 15 metres tall.
Where is the law ?
බාල ගල් අඟුරු වලින් cement හදන්න විකුණන ප්රමාණයට වඩා ash ටොන් 400-500ක් වැඩිපුර හැදෙනවා. ඒවා තමයි ඔය dump කරලා තියෙන්නේ.මේවා සිමෙන්ති ෆැක්ටරියට දෙන්නේ නැද්ද? උන් ඒවායින් හදනවා නේ සිමෙන්ති?
උබ වගේ හතර වටේම ගූ කන එකෙක්ගේ මනාපේ හරියන්නේ, පොනීල වගේ හතර වටේම ගූ කන එකෙක්ට තමා..
low iq dumb campaign bayyo
uba kohomada ban kiyanne oka anurage kalema genapuwa kiyala..... ubata mataka neda danne ne kalinuth gennlla tiyenava kiyala![]()
![]()
The burning of substandard coal has caused the pile of ash at the Lakvijaya power plant (LVP) to grow to 12-13 metres (39 to 42 feet) high—just two metres away from the top of the wind barrier, which is 15 metres tall.
Trident Chempar’s all 19 coal consignments fail independent quality tests
- https://www.sundaytimes.lk/260809/n...ts-fail-independent-quality-tests-651906.html
ඒකනේ අඳ බාල ඩෝබියෝ චූන් කරලා සදාකාලිකව බලයේ ඉන්න පුළුවන් කියලා හිතල පච අනුර තක්කඩි ගේම් ගහන්නේජෙප්පනේ, උඹලගේ ආණ්ඩුව මාරු වුන දවසක කොටා හිරේ!
![]()

උඹ ලංකාවේ නෙවේද බන් හිටියේ? පහුගිය අවුරුදු දෙකේ ලංකාවේ වුන ලොකුම දූෂණයක් මේක. කොටින්ම කිවොත් බලශක්ති ඇමති ඉල්ලා අස්වෙලා ගියෙත් මේක නිසා. ආණ්ඩුව බලය යොදවල පරීක්ෂණ යට ගහනවා. හරි නම් සෑහෙන පිරිසක් ඉන්න ඕන හිරේ.uba kohomada ban kiyanne oka anurage kalema genapuwa kiyala..... ubata mataka neda danne ne kalinuth gennlla tiyenava kiyala
uba kohomada ban kiyanne oka anurage kalema genapuwa kiyala..... ubata mataka neda danne ne kalinuth gennlla tiyenava kiyala
kohomada machan e kale Spot Tenders neda kale.... hodai hodai .....National Audit Office ජාතික විගණන කාර්යාලය පච අනුරගෙ කාලේ බාල ගල් අඟුරු ගේන්න කලින් අවුරුදු හයක coal shipments check කරලා කියන්නේ -> 2020-2025 GCV(Gross Calorific Value) exceeded the required standard of 6,150 kcal/kg in 72% of shipments, 28% remained above rejection threshold
The 2020 to 2025 period
The National Audit Office (NAO) also reviewed the plant’s records for the six years from 2020 to 2025 and found that there were no explicitly recorded problems attributed to poor-quality coal. An analysis of coal imported during this period (from the 262nd to the 455th shipment) showed that GCV exceeded the required standard of 6,150 kcal/kg in 72 percent of shipments, while the remaining 28 percent remained safely about the rejection threshold.
The log books maintained by the operating officers for all three units contained no entries indicating that the quality of imported coal stocks had decreased or that the units could not operate their full 300MW capacity due to coal quality issues.
Across thousands of daily power system reports prepared by the system control division from 2020 to 2025, there was only one recorded instance explicitly citing a coal quality issue—on November 3, 2025, unit 1’s capacity dropped to 260MW during the night peak due to “wet coal”. No such notes were found for units 2 and 3 during this entire period.
- https://www.sundaytimes.lk/260419/news/mill-blockages-and-fires-coal-headaches-continue-639436.html
පච කොටාගේ ඔක්කොම බාල උනාට 2020-2025 GCV exceeded the required standard of 6,150 kcal/kg in 72% of shipments, 28% remained above rejection threshold!