Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
ලංකාවේ හොඳම උපකාරක පන්ති සහ ගුරුවරුන් එකම තැනකින් - TopTuition.lk
dulithapathum
Updated:
Today at 8:07 AM
Colombo
RidhMathraa ’26 🎶✨
Tmadhusanka
Updated:
Wednesday at 11:58 PM
Ad icon
Colombo
PXN V10 Pro Direct Drive Racing Wheel (Under Warranty)
Abdur Rahman
Updated:
Wednesday at 10:23 PM
Ad icon
USDT ණය සේවාව - USDT Loan Service
පුරවැසියා
Updated:
Wednesday at 4:54 PM
Ad icon
🎮 INDIAN PSN GIFT CARDS AVAILABLE NOW! 🎮
madukaperera
Updated:
Tuesday at 12:57 PM
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
A New City on Sea for Colombo
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="CMBDude" data-source="post: 7762442" data-attributes="member: 289092"><p><span style="font-size: 15px"><img src="http://www.development.lk/media/images/news/imagesCA47GOIE.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></span></p><p><span style="font-size: 15px"></span></p><p><span style="font-size: 15px">Chairman of the Sri Lanka Ports Authority Dr. Priyath B.Wickrema has disclosed that in accordance with the intention of the President to expand the Colombo City by having a modern City adjoining the Port, steps have been taken to fill 500 acres of sea territory adjoining the new Colombo Port Project for building a Modern, Planned City. Preliminary work relating to this city such as filling the sea territory and landscaping will be completed in 3 years time. There will be three access roads to this Modern City and one access road will be connected with the marine drive. The second would be constructed opposite the old parliament, and t he Light House entrance of the Colombo port would be upgraded as the third access road. The preliminary work on the planned city is to be completed in 3 years.</span></p><p><span style="font-size: 15px"></span></p><p><span style="font-size: 15px"></span><span style="font-size: 15px">A project of this nature has become necessary due problems being faced in the Colombo City including environment pollution, blocking of the drainage systems, road traffic congestion, floods etc. The feasibility study and environmental impact assessment are being completed.</span></p><p><span style="font-size: 15px">He said that the SLPA would conduct the project with the technical assistance and consultancy services provided by the University of Moratuwa and Lanka Hydraulic Institute. A rail track is to be developed around the new city and would be the major mode of transport in the city. Park and Drive concept will be introduced in the city so that anyone entering the city will park their vehicles at specified parking locations and take a train ride to go around the city.</span></p><p><span style="font-size: 15px">The new city will have high rise housing complexes, multiplex office buildings, hotels, shopping malls, tourist sites, recreation facilities, banks and other service centres etc. </span></p><p><span style="font-size: 15px">Filling of land for this project will be done by the Sri Lanka Ports Authority at an approximate cost of 250 Million U.S.Dollars. Upon the filling and the landscaping work is over local and international tenders will be called for implementing construction of infrastructure and other facilities. </span></p><p> <span style="font-size: 15px">Building this New Colombo City on Sea will be carried out in coordination with the Urban Development Authority, Colombo Municipal Council, All Service Ministries, and: the Archaelogical Department,. The Urban Development Authority will prepare schematic diagrams for the new City after completion of the filling work.(niz). </span></p><p><span style="font-size: 15px"></span></p><p></p><p></p><p></p><p></p><p><span style="font-size: 15px">taken from :- <a href="http://www.development.lk/news.php?news=624" target="_blank">http://www.development.lk/news.php?news=624</a></span></p><p><span style="font-size: 15px"></span></p></blockquote><p></p>
[QUOTE="CMBDude, post: 7762442, member: 289092"] [SIZE=4][IMG]http://www.development.lk/media/images/news/imagesCA47GOIE.jpg[/IMG] Chairman of the Sri Lanka Ports Authority Dr. Priyath B.Wickrema has disclosed that in accordance with the intention of the President to expand the Colombo City by having a modern City adjoining the Port, steps have been taken to fill 500 acres of sea territory adjoining the new Colombo Port Project for building a Modern, Planned City. Preliminary work relating to this city such as filling the sea territory and landscaping will be completed in 3 years time. There will be three access roads to this Modern City and one access road will be connected with the marine drive. The second would be constructed opposite the old parliament, and t he Light House entrance of the Colombo port would be upgraded as the third access road. The preliminary work on the planned city is to be completed in 3 years. [/SIZE][SIZE=4]A project of this nature has become necessary due problems being faced in the Colombo City including environment pollution, blocking of the drainage systems, road traffic congestion, floods etc. The feasibility study and environmental impact assessment are being completed. He said that the SLPA would conduct the project with the technical assistance and consultancy services provided by the University of Moratuwa and Lanka Hydraulic Institute. A rail track is to be developed around the new city and would be the major mode of transport in the city. Park and Drive concept will be introduced in the city so that anyone entering the city will park their vehicles at specified parking locations and take a train ride to go around the city. The new city will have high rise housing complexes, multiplex office buildings, hotels, shopping malls, tourist sites, recreation facilities, banks and other service centres etc. Filling of land for this project will be done by the Sri Lanka Ports Authority at an approximate cost of 250 Million U.S.Dollars. Upon the filling and the landscaping work is over local and international tenders will be called for implementing construction of infrastructure and other facilities. [/SIZE] [SIZE=4]Building this New Colombo City on Sea will be carried out in coordination with the Urban Development Authority, Colombo Municipal Council, All Service Ministries, and: the Archaelogical Department,. The Urban Development Authority will prepare schematic diagrams for the new City after completion of the filling work.(niz). [/SIZE] [SIZE=4]taken from :- [URL]http://www.development.lk/news.php?news=624[/URL] [/SIZE] [/QUOTE]
Insert quotes…
Verification
Hata thunen beduwama keeyada? (60 bedeema thuna)
Post reply
Top
Bottom