Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
ZTE MF283U 4G Unlocked Router (Used)
ayanthamaxi
Updated:
Sunday at 8:26 PM
ලංකාවේ හොඳම උපකාරක පන්ති සහ ගුරුවරුන් එකම තැනකින් - TopTuition.lk
dulithapathum
Updated:
Saturday at 8:07 AM
Colombo
RidhMathraa ’26 🎶✨
Tmadhusanka
Updated:
Jul 15, 2026
Ad icon
Colombo
PXN V10 Pro Direct Drive Racing Wheel (Under Warranty)
Abdur Rahman
Updated:
Jul 15, 2026
Ad icon
USDT ණය සේවාව - USDT Loan Service
පුරවැසියා
Updated:
Jul 15, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
Adani-John Keells WCT, SLPA ECT, JCT Extension and, Port Access Elevated Highway under construction
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="monson" data-source="post: 29572907" data-attributes="member: 30005"><p><span style="font-size: 22px">SLPA gets brand new cranes worth $ 282 m to boost capacity at East Container terminal</span></p><p></p><p>Tuesday, 6 February 2024 00:16 </p><p></p><p></p><p></p><p><span style="font-size: 18px">The Sri Lanka Ports Authority (SLPA) is to receive brand new 12 STS Gantry cranes and 40 ARMG cranes from China at a total cost of $ 282 million.</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">Three STS Gantry cranes were received at the SLPA’s East Container Terminal (ECT) on 2 February. The cranes will be installed at the ECT of the Port of Colombo. The total cost of the cranes are borne by Sri Lanka Ports Authority (SLPA). </span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">The specifications for the new STS Gantry cranes at the Port of Colombo are as follows:</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">The outreach of a crane is 72 metres, spanning to operate 26 TEUs across. Back reach extends to 25 m, with a lifting height above the rail of 55 m and a lifting height below the rail of 18 m. The maximum load capacity under the spreader is 65T while under the lifting beam, a crane can handle up to 75T.</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">East Container Terminal (ECT) of the Colombo South Harbour envisages 1,300 m long quay to accommodate three Ultra Large Container Carriers (ULCC) which have a length of 400 m or more at -18 to -20 m depth berths with a backyard area. The approximate terminal area is 72 ha and the annual capacity of the terminal is 2.4 million TEUs.</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">SLPA has already constructed 600 m quay wall with an operationalised berth of 440 m, 18 ha yard, peripheral roads and related gate facilities etc., in 2015 as Phase-I of the project. The Phase-I of the terminal is in operation from October 2020.</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">The Cabinet of Ministers on their Cabinet decision dated 13.02.2021 decided to develop and operate ECT by SLPA. Accordingly, the bids were invited for the construction of ECT on open competitive bidding process as per Government guidelines.</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">As per the Cabinet decision taken for the Phase-II civil construction works of ECT dated 23.11.2021 has decided to award the contract to Joint Venture of Access-CHEC JVT Ltd. The agreement was signed between Joint Venture and SLPA on 20 December 2022 and the project commenced on 4 January 2023.</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">The ECT is the most strategically important terminal among the terminals in operation at the Port of Colombo. The terminal is operated by SLPA. Despite the post-COVID-19 pandemic era and the prevailing economic crisis, SLPA could retain funds for its investment through higher financial management.</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">The investment will facilitate the East Container Terminal (ECT) to be completed successfully by the end 2025, enabling it to operate at its maximum capacity and attract more deep draught vessels. This development will also significantly contribute to the annual increase in volumes at the Port of Colombo (POC) and provide additional berthing facilities for deep draught vessels at the port.</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">These investments will expedite the elevation of the port’s status as the central commercial and maritime hub port in the Asian region.</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">To achieve success in these endeavours, a pivotal and significant commitment has been demonstrated by the Government, under the leadership of President Ranil Wickremesinghe, along with Ports, Shipping and Aviation Minister Nimal Siripala de Silva, the Secretary K.D.S. Ruwanchandra and the staff of the Ministry, SLPA Chairman Keith D. Bernard, SLPA’s senior management, executive officials, engineers, employees, trade unions, and their leaders.</span></p><p><span style="font-size: 18px"></span></p><p><span style="font-size: 18px">- <a href="https://www.ft.lk/shippingaviation/SLPA-gets-brand-new-cranes-worth-282-m-to-boost-capacity-at-East-Container-terminal/21-758133" target="_blank">https://www.ft.lk/shippingaviation/SLPA-gets-brand-new-cranes-worth-282-m-to-boost-capacity-at-East-Container-terminal/21-758133</a></span></p><hr /><p><span style="font-size: 18px"><strong>The Colombo West International Terminal (WCIT) is progressing fast and the third and largest deep draught terminal will come into operation by end of 2024. It will add much needed capacity in the port of Colombo. Development and investment by Adani ports India</strong></span></p><p><span style="font-size: 18px"><strong><img src="https://static.xx.fbcdn.net/images/emoji.php/v9/tb3/1/16/1f1ee_1f1f3.png" alt="🇮🇳" class="fr-fic fr-dii fr-draggable " style="" /> and JKH/ SLPA <img src="https://static.xx.fbcdn.net/images/emoji.php/v9/t5b/1/16/1f1f1_1f1f0.png" alt="🇱🇰" class="fr-fic fr-dii fr-draggable " style="" /> - Also funded by DFC <img src="https://static.xx.fbcdn.net/images/emoji.php/v9/t93/1/16/1f1fa_1f1f8.png" alt="🇺🇸" class="fr-fic fr-dii fr-draggable " style="" /></strong></span></p><p></p><p><img src="https://i.imgur.com/XjjsDTw.jpeg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p></p><p>[MEDIA=facebook]10162878542019918[/MEDIA]</p><p>------ <span style="font-size: 10px">Post added on [DATETIME="UT"]1707190698[/DATETIME]</span></p></blockquote><p></p>
[QUOTE="monson, post: 29572907, member: 30005"] [SIZE=6]SLPA gets brand new cranes worth $ 282 m to boost capacity at East Container terminal[/SIZE] Tuesday, 6 February 2024 00:16 [SIZE=5]The Sri Lanka Ports Authority (SLPA) is to receive brand new 12 STS Gantry cranes and 40 ARMG cranes from China at a total cost of $ 282 million. Three STS Gantry cranes were received at the SLPA’s East Container Terminal (ECT) on 2 February. The cranes will be installed at the ECT of the Port of Colombo. The total cost of the cranes are borne by Sri Lanka Ports Authority (SLPA). The specifications for the new STS Gantry cranes at the Port of Colombo are as follows: The outreach of a crane is 72 metres, spanning to operate 26 TEUs across. Back reach extends to 25 m, with a lifting height above the rail of 55 m and a lifting height below the rail of 18 m. The maximum load capacity under the spreader is 65T while under the lifting beam, a crane can handle up to 75T. East Container Terminal (ECT) of the Colombo South Harbour envisages 1,300 m long quay to accommodate three Ultra Large Container Carriers (ULCC) which have a length of 400 m or more at -18 to -20 m depth berths with a backyard area. The approximate terminal area is 72 ha and the annual capacity of the terminal is 2.4 million TEUs. SLPA has already constructed 600 m quay wall with an operationalised berth of 440 m, 18 ha yard, peripheral roads and related gate facilities etc., in 2015 as Phase-I of the project. The Phase-I of the terminal is in operation from October 2020. The Cabinet of Ministers on their Cabinet decision dated 13.02.2021 decided to develop and operate ECT by SLPA. Accordingly, the bids were invited for the construction of ECT on open competitive bidding process as per Government guidelines. As per the Cabinet decision taken for the Phase-II civil construction works of ECT dated 23.11.2021 has decided to award the contract to Joint Venture of Access-CHEC JVT Ltd. The agreement was signed between Joint Venture and SLPA on 20 December 2022 and the project commenced on 4 January 2023. The ECT is the most strategically important terminal among the terminals in operation at the Port of Colombo. The terminal is operated by SLPA. Despite the post-COVID-19 pandemic era and the prevailing economic crisis, SLPA could retain funds for its investment through higher financial management. The investment will facilitate the East Container Terminal (ECT) to be completed successfully by the end 2025, enabling it to operate at its maximum capacity and attract more deep draught vessels. This development will also significantly contribute to the annual increase in volumes at the Port of Colombo (POC) and provide additional berthing facilities for deep draught vessels at the port. These investments will expedite the elevation of the port’s status as the central commercial and maritime hub port in the Asian region. To achieve success in these endeavours, a pivotal and significant commitment has been demonstrated by the Government, under the leadership of President Ranil Wickremesinghe, along with Ports, Shipping and Aviation Minister Nimal Siripala de Silva, the Secretary K.D.S. Ruwanchandra and the staff of the Ministry, SLPA Chairman Keith D. Bernard, SLPA’s senior management, executive officials, engineers, employees, trade unions, and their leaders. - [URL]https://www.ft.lk/shippingaviation/SLPA-gets-brand-new-cranes-worth-282-m-to-boost-capacity-at-East-Container-terminal/21-758133[/URL][/SIZE] [HR][/HR] [SIZE=5][B]The Colombo West International Terminal (WCIT) is progressing fast and the third and largest deep draught terminal will come into operation by end of 2024. It will add much needed capacity in the port of Colombo. Development and investment by Adani ports India [IMG alt="🇮🇳"]https://static.xx.fbcdn.net/images/emoji.php/v9/tb3/1/16/1f1ee_1f1f3.png[/IMG] and JKH/ SLPA [IMG alt="🇱🇰"]https://static.xx.fbcdn.net/images/emoji.php/v9/t5b/1/16/1f1f1_1f1f0.png[/IMG] - Also funded by DFC [IMG alt="🇺🇸"]https://static.xx.fbcdn.net/images/emoji.php/v9/t93/1/16/1f1fa_1f1f8.png[/IMG][/B][/SIZE] [IMG]https://i.imgur.com/XjjsDTw.jpeg[/IMG] [MEDIA=facebook]10162878542019918[/MEDIA] ------ [SIZE=2]Post added on [DATETIME="UT"]1707190698[/DATETIME][/SIZE] [/QUOTE]
Insert quotes…
Verification
Asuwa dahayen wadi kalama keeyada?
Post reply
Top
Bottom