after the matter, resident Liu emotion, the neighborhood or to communicate, if we regard the things spread out that the problem is not a problem. -> Guangxi News Network Hengxian (Reporter Nguyen and Crafts) September 18 at 3 pm Hengxian cross Weizhou City Secretary South Road, Lane residents six man,abercrombie, looking at being laid asphalt road said happily. A month ago, the residents of the alley for water problems,casque beats, almost with the two businesses Naoqi contradictions. Heng County Urban Construction Bureau,jordan shoes, deputy director of Mr. Ray said, at design time, the staff at the outfall planning sub-header, so it will not appear merchants said that situation. On the afternoon of September 13,casque dr dre, after a heavy rain outside the alley at the plot a lot of water. Reporters on the scene, the deepest you have not seen the foot of the pedestrian. In order to prevent the wet feet of water, the residents put up in the alley on both sides of brick pad feet. the morning of September 16,mercurial, Mr. Ray led to the site layout work, and demanded to see the results in September 19, will be persecuted. was just opening to the outlet, how they become the laying of asphalt pavement in the alley? money worth spending. to block construction, merchant Mr. Ray explained that the construction team just dug in low-lying at the outlet, can not effectively solve the water problem. Road drain all the sub-set system of rainwater and sewage, if a small corner is not, if there is garbage blocked,mercurial vapor, but also created new risks to more trouble. Residents thought my selfish acts that harm everyone, in fact, I see in the eyes of anxious heart, only to stop the construction. resident Miss Liao said,air jordan, they told the community to reflect, the other said the festival started, can be a month later still nothing happened. They also heard is to stop construction, the construction team left. Some residents in order to punish those who blocked construction,abercrombie france, intended to rubbish the merchant door. City Secretary for the community's neighborhood committee director Mr Kam said, a drain on two occasions with the construction team construction, but next to the merchant said, opening to the outlet will lead to odors, affect their business. Although this public road, but to a drain lead to neighborhood conflicts, more harm than good. It is understood that prior to Jasmine International Cultural Festival held in August this year, City Secretary for South Road, as a finishing section of one of the original construction side of the road booster, due to the rush period, the ending works did not finish , leading to the entrance to the alley into a low-lying topography. The construction team is expected to a rainy day, water,burberry, intend Festival dug to drain low-lying place, did not expect, when they are ready to construction,frannklin marshall, but it was the blocking of the alley on both sides of merchants. 相关的主题文章: Jay Pan Cindy to help out a charity dinner (Photos ) Chongqing police seized on the kilograms of toxic 柳州查处8起高价售盐行为 最大一起被罚款3000元 After 29 hours of rescue, the bodies of the victims has finally been recovered out of the water. Trainee reporter Wang Chunnan photo