to address the issue of compensation, on April 13, Xiuzhou District Construction Bureau, BMS, quality supervision station and other departments responsible real estate company and Southeast Asia to meet together for a consultation. Finally, the Bureau of position, the buildings must be issued by the provincial surveying and mapping unit appraisal report, and then be treated accordingly. If the house there are quality problems, caused by owners not normally reside, you must remove, for the economic losses caused by the owners of real estate companies to bear in full; appraisal reports if the testing is allowable range, use the function does not affect the housing, then the real estate company to be on the owners to make appropriate compensation. not only Mr. Wang, the building 501 room 504 room property owners and the owners of Mr. Shao Tang also met with a similar situation,discount north face jackets, which tilted the most powerful Tang family,discount north face denali jackets, north and south side there are 9 cm gap. numerous, but we have never encountered such outrageous houses tilt, under normal circumstances, only a few decades old house will tilt less than 1 cm. weight, if the whole building is not a good reinforcement of what the future might drained. the house until January 25 this year to get the key, according to the real estate agency to provide the inspection report, the house is qualified. How just two months on the tilt? Jiaxing Nanyang real estate company hired for the quality supervision department of building inspection, according to testing, quality supervision departments found that the southwest corner of the south building tilted by 11 cm,north face denali womens - Police to sacrifice lon, the northwest corner of the south slope of 10.9 cm , northeast corner of the south slope of 10.8 cm. doubt the existence tilt housing problems, Mr. Wang,north face vest sale, Mr. Shao and Tang began to separately contact the owners of 17 other buildings, and from other owners there, they learned, each in the decoration, also found the same problem. So the day before yesterday morning, designated Provincial Construction Bureau Xiuzhou construction quality inspection station staff to begin building for testing. Subsequently, the 20 owners are collectively came to the door opposite the residential developer - Real Estate Co., Ltd. Jiaxing Nanyang discussing. After several rounds of bilateral consultations, Nanyang real estate company finally agreed to building quality supervision department of the quality of your testing. newspaper will continue to look into the matter. the whole building has tilted south about 10 cm get the test report, the owners of 17 buildings have raged. Some owners to check out, and some owners are real estate agency reinforcement of the house, then a reasonable compensation. but the owners rejected the collective real estate agency's compensation. the beginning, real estate agency agreed to check out the property owners to be returned to the housing fund, but also compensate 10,000 yuan; not check out the owners, the reinforcement in the building, the compensation contract price of 10%. 40-year-old Wang is Xincheng Town, Jiaxing Xiuzhou District residents, a year ago, Mr. Wang at the local high-end real estate - buy a set within the Nanyang Garden area of 70 square meters, the value of 27 million in real estate. Delivery of the house earlier this year, he began the renovation, workers suddenly said: house north and south ends of the level of 8 cm gap, based on experience, the whole building, Building 17 is likely to have inclined southward. renovation workers also said: crooked it really outrageous Jiaxing city quality supervision departments test results houses at both ends as much as 8 cm gap