Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
USA Linux OpenVZ VPS අඩු මිලකට
Nadun26
Updated:
Yesterday at 6:46 PM
Ad icon
Shared Hosting වාර්ෂිකව රු 2200 සිට!
Nadun26
Updated:
Yesterday at 11:38 AM
හොඳ, දැන්වීම්-රහිත (ad-free) ආයුර්වේද ඇප් එකක් සොයා ගැනීමට නොහැකි වූ නිසා, මමම එකක් නිර්මාණය කළා
kitchen_discussions
Updated:
Tuesday at 2:34 AM
Ad icon
Iptv
musicking
Updated:
Sunday at 9:52 AM
Ad icon
ZTE MF283U 4G Unlocked Router (Used)
ayanthamaxi
Updated:
Jul 19, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
News
Fresh US$ 300 m facelift for BIA; New terminal, runway in the offing
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="saraprobe" data-source="post: 3005861" data-attributes="member: 13914"><p><img src="http://i36.tinypic.com/2462tmu.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></p><p>By Nizla Naizer</p><p>The Bandaranaike International Airport (BIA) is to be upgraded with a new terminal and better facilities costing US$300 million, Aviation Ministry officials said.</p><p><strong></strong></p><p><strong>Secretary to the Ministry of Ports and Aviation, Thosapala Hewage speaking to The Bottom Line said that the proposed Stage two of the project will be done with assistance from Japan, and will also bring eight new aerobridges along with separate arrival and departure entrances.</strong></p><p></p><p>The expansion is to start next year and is expected to take three years to complete. “We are being assisted financially by the Japanese Bank for International Cooperation which will provide the bulk of the funding required, and we will provide the rest,” he said.</p><p></p><p>“We have already provided the consultancy contract under stage one of this project. They will be given six months to prepare and the second stage will begin next year after the tenders are called and finalized. The Japanese assisted us with phase one and pledged to continue assistance during this stage as well,” he explained. “They will also provide vital technical expertise which we lack to conduct operations.”</p><p></p><p><strong>The new terminal is expected to bring more passengers to Sri Lanka and at the same time provide the airport with much needed space. Hewage said that plans are also underway to create a new runway. “We have identified suitable locations near the BIA, and feasibility reports will be done by the end of this month.” The new runway will probably be started on next year.</strong><img src="/styles/default/xenforo/smilies/default/yes.gif" class="smilie" loading="lazy" alt=":yes:" title="Yes :yes:" data-shortname=":yes:" /> <img src="/styles/default/xenforo/smilies/default/yes.gif" class="smilie" loading="lazy" alt=":yes:" title="Yes :yes:" data-shortname=":yes:" /> </p><p></p><p></p><p><a href="http://www.thebottomline.lk/2008/09/24/index%2024.htm" target="_blank">TBL</a></p></blockquote><p></p>
[QUOTE="saraprobe, post: 3005861, member: 13914"] [IMG]http://i36.tinypic.com/2462tmu.jpg[/IMG] By Nizla Naizer The Bandaranaike International Airport (BIA) is to be upgraded with a new terminal and better facilities costing US$300 million, Aviation Ministry officials said. [B] Secretary to the Ministry of Ports and Aviation, Thosapala Hewage speaking to The Bottom Line said that the proposed Stage two of the project will be done with assistance from Japan, and will also bring eight new aerobridges along with separate arrival and departure entrances.[/B] The expansion is to start next year and is expected to take three years to complete. “We are being assisted financially by the Japanese Bank for International Cooperation which will provide the bulk of the funding required, and we will provide the rest,” he said. “We have already provided the consultancy contract under stage one of this project. They will be given six months to prepare and the second stage will begin next year after the tenders are called and finalized. The Japanese assisted us with phase one and pledged to continue assistance during this stage as well,” he explained. “They will also provide vital technical expertise which we lack to conduct operations.” [B]The new terminal is expected to bring more passengers to Sri Lanka and at the same time provide the airport with much needed space. Hewage said that plans are also underway to create a new runway. “We have identified suitable locations near the BIA, and feasibility reports will be done by the end of this month.” The new runway will probably be started on next year.[/B]:yes: :yes: [URL="http://www.thebottomline.lk/2008/09/24/index%2024.htm"]TBL[/URL] [/QUOTE]
Insert quotes…
Verification
Dahaya deken beduwama keeyada?
Post reply
Top
Bottom