Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
ZTE MF283U 4G Unlocked Router (Used)
ayanthamaxi
Updated:
Yesterday at 8:26 PM
ලංකාවේ හොඳම උපකාරක පන්ති සහ ගුරුවරුන් එකම තැනකින් - TopTuition.lk
dulithapathum
Updated:
Saturday at 8:07 AM
Colombo
RidhMathraa ’26 🎶✨
Tmadhusanka
Updated:
Wednesday at 11:58 PM
Ad icon
Colombo
PXN V10 Pro Direct Drive Racing Wheel (Under Warranty)
Abdur Rahman
Updated:
Wednesday at 10:23 PM
Ad icon
USDT ණය සේවාව - USDT Loan Service
පුරවැසියා
Updated:
Wednesday at 4:54 PM
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
Hydrogen Fuel Cell Vehicles in Public Transport
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Draco Malfoy" data-source="post: 29410551" data-attributes="member: 570250"><p>developed ratawala mama train kiyala consider karana godak trains electric. like subway trains, LRT, bullet trains, maglev trains.</p><p>but normal trains [diesel-electric] ewa thama ithuru wenne full electric nathi.</p><p></p><p>lankaweth okkoma wage train diesel-electric, diesel engine eken electricity hadala electric motor walin trains eka move karanawa.</p><p>mama danna widiyata developed ratawala me normal trains sapekshawa adu karagena thiyenawa lrt, metro system walin.</p><p>mama hithanne lankawa, india etc wage ratawal still over 90% withara diesel-electric trains use karanne.</p><p></p><p>menna me normal trains thama awula thiyenne, ewaye electric line train ekata udin or track eken denna bari nisa power source ekath train eke geniyanna wenawa. ekata ithin diesel or hydrogen thama.</p><p></p><p>habai mama danna widiyata hydrogen fuel cell wala ekapara loku power ekak denna ba, hemin hemin thama power eka wadi wenne. ekai toyota mirai wage fuel-cell vehicle accelerate wenne slow kiyanne. ethakota train ekak stop eke idala move karanna denna one crazy level current eka denna wenne loku battery buffer ekak dala eke load karagena inna one train eka stop ekata enna kalin. eita passe battery walin move karanna patan gaththata passe tika tika battery eka fill karanawa slowly fuel-cell eken ena current eken.</p><p></p><p>simply kiyanawanam ithin normal trains walata renewable denna nam ithin green hydrogen or bio-fuel thama. but bio-fuel wala wenama issue godak thiyenawa.</p><p></p><p>[MEDIA=youtube]F-yDKeya4SU[/MEDIA]</p><p></p><p></p><p>& hydrogen trains awoth kiyatawath happenna, peeli paninna nam epa. happunoth ithin C4 bomba ton ganak pipiruna wage kaboom wela yai village ekakma</p></blockquote><p></p>
[QUOTE="Draco Malfoy, post: 29410551, member: 570250"] developed ratawala mama train kiyala consider karana godak trains electric. like subway trains, LRT, bullet trains, maglev trains. but normal trains [diesel-electric] ewa thama ithuru wenne full electric nathi. lankaweth okkoma wage train diesel-electric, diesel engine eken electricity hadala electric motor walin trains eka move karanawa. mama danna widiyata developed ratawala me normal trains sapekshawa adu karagena thiyenawa lrt, metro system walin. mama hithanne lankawa, india etc wage ratawal still over 90% withara diesel-electric trains use karanne. menna me normal trains thama awula thiyenne, ewaye electric line train ekata udin or track eken denna bari nisa power source ekath train eke geniyanna wenawa. ekata ithin diesel or hydrogen thama. habai mama danna widiyata hydrogen fuel cell wala ekapara loku power ekak denna ba, hemin hemin thama power eka wadi wenne. ekai toyota mirai wage fuel-cell vehicle accelerate wenne slow kiyanne. ethakota train ekak stop eke idala move karanna denna one crazy level current eka denna wenne loku battery buffer ekak dala eke load karagena inna one train eka stop ekata enna kalin. eita passe battery walin move karanna patan gaththata passe tika tika battery eka fill karanawa slowly fuel-cell eken ena current eken. simply kiyanawanam ithin normal trains walata renewable denna nam ithin green hydrogen or bio-fuel thama. but bio-fuel wala wenama issue godak thiyenawa. [MEDIA=youtube]F-yDKeya4SU[/MEDIA] & hydrogen trains awoth kiyatawath happenna, peeli paninna nam epa. happunoth ithin C4 bomba ton ganak pipiruna wage kaboom wela yai village ekakma [/QUOTE]
Insert quotes…
Verification
Winadiyakata thappara keeyak tibeda?
Post reply
Top
Bottom