Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Yesterday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Yesterday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Saturday at 10:52 PM
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Peppa Pig Family Plush Toy Set – 5 Characters
anil1961
Updated:
Sep 19, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
Sri Lanka plans new tender for Japan funded airport terminal in September⚡
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Truth Hurts" data-source="post: 29994274" data-attributes="member: 477372"><p>[MEDIA=youtube]czPsF8DglfY[/MEDIA]</p><p></p><p><strong>බණ්ඩාරනායක ජාත්යන්තර ගුවන් තොටුපලේ (BIA) යෝජිත දෙවන පර්යන්තයේ ඉදිකිරීම් ඉක්මනින් නැවත ආරම්භ කිරීමට බලාපොරොත්තු වන අතර, අවශ්යණය පහසුකම් ලබන මාසය වන විට ලැබෙනු ඇතැයි ගුවන් තොටුපළ සහ ගුවන් සේවා හි (ශ්රී ලංකා) සභාපති (AASL), අතුල ගල්කැටිය මහතා පවසනවා.</strong></p><p><strong></strong></p><p><strong>එහිදී ඔහු සඳහන් කළේ, ජපාන ජාත්යන්තර සහයෝගිතා නියෝජිතායතනය (JICA) සමඟ ඒ සම්බන්ධයෙන් සාකච්ඡා කරමින් සිටින බවත්, පොරොන්දු වූ පරිදි ලබන මාසය වන විට අවශ්ය ණය පහසුකම් ලබා දෙනු ඇති බවයි.</strong></p><p></p><p>ECONOMYNEXT – State-run Airport and Aviation Services (Sri Lanka) Ltd plans to float a new tender to resume work on the second terminal in mid -September after a bilateral debt restructure made funds from Japan available, Chairman Athula Galketiya said.</p><p></p><p>The original contractor self-terminated the contract, after completing only 5 percent of the terminal, when Sri Lanka defaulted on its debt in 2022.</p><p></p><p>As a result, Sri Lanka had to pay 52 million in termination fees under the contract terms.</p><p></p><p>The half-built sub-structure of the terminal, which was a safety hazard and was deteriorating, was then completed by a local contractor hired by the AASL.</p><p></p><p>Though the contractor pulled put when the Japan International Co-operation Agency had to suspend projects after the sovereign default, the consultants, Japan Airport Consultants were retained at Sri Lanka’s expense.</p><p></p><p>The original design had to be changed to accommodate new regulations and costs had also risen in the meantime, Galketiya said.</p><p></p><p>JICA however had agreed to provide the gap funding and Sri Lanka had already done the preliminary work to float a tender, he said.</p><p></p><p>Colombo airport passenger traffic was fast approaching pre-Covid levels and the airport agency was trying to start work on the new terminal as soon as possible.</p><p></p><p>An attempt to start an interim terminal to with 30 check in counters in a separate building has got down bogged down in legal action.</p><p></p><p>However, attempts are being made to resolve the problem and try to award that tender as well, Galketiya said.</p><p></p><p>Colombo airport’s passenger volumes had 26.1 percent to 4.39 million in the first six month of the year.</p><p></p><p>Sri Lanka is expecting volumes to rise to around 8 to 9 million by the end of the year.</p><p></p><p>The existing terminal has handled about 10 million passengers though there is congestion in the departure terminal and immigration processing. (Colombo/July29/2024)</p></blockquote><p></p>
[QUOTE="Truth Hurts, post: 29994274, member: 477372"] [MEDIA=youtube]czPsF8DglfY[/MEDIA] [B]බණ්ඩාරනායක ජාත්යන්තර ගුවන් තොටුපලේ (BIA) යෝජිත දෙවන පර්යන්තයේ ඉදිකිරීම් ඉක්මනින් නැවත ආරම්භ කිරීමට බලාපොරොත්තු වන අතර, අවශ්යණය පහසුකම් ලබන මාසය වන විට ලැබෙනු ඇතැයි ගුවන් තොටුපළ සහ ගුවන් සේවා හි (ශ්රී ලංකා) සභාපති (AASL), අතුල ගල්කැටිය මහතා පවසනවා. එහිදී ඔහු සඳහන් කළේ, ජපාන ජාත්යන්තර සහයෝගිතා නියෝජිතායතනය (JICA) සමඟ ඒ සම්බන්ධයෙන් සාකච්ඡා කරමින් සිටින බවත්, පොරොන්දු වූ පරිදි ලබන මාසය වන විට අවශ්ය ණය පහසුකම් ලබා දෙනු ඇති බවයි.[/B] ECONOMYNEXT – State-run Airport and Aviation Services (Sri Lanka) Ltd plans to float a new tender to resume work on the second terminal in mid -September after a bilateral debt restructure made funds from Japan available, Chairman Athula Galketiya said. The original contractor self-terminated the contract, after completing only 5 percent of the terminal, when Sri Lanka defaulted on its debt in 2022. As a result, Sri Lanka had to pay 52 million in termination fees under the contract terms. The half-built sub-structure of the terminal, which was a safety hazard and was deteriorating, was then completed by a local contractor hired by the AASL. Though the contractor pulled put when the Japan International Co-operation Agency had to suspend projects after the sovereign default, the consultants, Japan Airport Consultants were retained at Sri Lanka’s expense. The original design had to be changed to accommodate new regulations and costs had also risen in the meantime, Galketiya said. JICA however had agreed to provide the gap funding and Sri Lanka had already done the preliminary work to float a tender, he said. Colombo airport passenger traffic was fast approaching pre-Covid levels and the airport agency was trying to start work on the new terminal as soon as possible. An attempt to start an interim terminal to with 30 check in counters in a separate building has got down bogged down in legal action. However, attempts are being made to resolve the problem and try to award that tender as well, Galketiya said. Colombo airport’s passenger volumes had 26.1 percent to 4.39 million in the first six month of the year. Sri Lanka is expecting volumes to rise to around 8 to 9 million by the end of the year. The existing terminal has handled about 10 million passengers though there is congestion in the departure terminal and immigration processing. (Colombo/July29/2024) [/QUOTE]
Insert quotes…
Verification
Dahaya deken beduwama keeyada?
Post reply
Top
Bottom