Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
ZTE MF283U 4G Unlocked Router (Used)
ayanthamaxi
Updated:
Jul 19, 2026
ලංකාවේ හොඳම උපකාරක පන්ති සහ ගුරුවරුන් එකම තැනකින් - TopTuition.lk
dulithapathum
Updated:
Jul 18, 2026
Colombo
RidhMathraa ’26 🎶✨
Tmadhusanka
Updated:
Jul 15, 2026
Ad icon
Colombo
PXN V10 Pro Direct Drive Racing Wheel (Under Warranty)
Abdur Rahman
Updated:
Jul 15, 2026
Ad icon
USDT ණය සේවාව - USDT Loan Service
පුරවැසියා
Updated:
Jul 15, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
ElaKiri.com
News and Updates
Sri Lanka to have island wide power cuts from today
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="lkdood" data-source="post: 3300334" data-attributes="member: 92282"><p><strong>Ceylon Electricity Board (CEB) has decided to execute island wide power cuts from today until further notice due to difficulty in meeting the country's electricity requirement as production has slowed down following the Tamil Tiger air attack on Kelanithissa power station.</strong></p><p></p><p><strong> According to Ceylon Electricity Board, several days before the air strike, the American diesel power generation company, AES Corporation, operating the plant within the premises of the existing CEB Kelanitissa Power Complex, has stopped electricity production as the Sri Lankan government has failed to meet the payments.</strong></p><p></p><p><strong> The air strike has rendered the GT 7 turbine system that was generating 115MW and another power generation system which was adding 165MW to the national system inactive.</strong></p><p></p><p><strong> “With this situation, CEB will have power cuts on all towns in Sri Lanka other than the Colombo city area as it is difficult to supply the demand at any given time,” a CEB source said. </strong></p><p><strong></strong></p><p></p><p></p><p><strong><span style="font-size: 9px"><a href="http://www.colombopage.com/archive_08/November135841SL.html" target="_blank">CP</a></span></strong></p><p><strong></strong></p></blockquote><p></p>
[QUOTE="lkdood, post: 3300334, member: 92282"] [B]Ceylon Electricity Board (CEB) has decided to execute island wide power cuts from today until further notice due to difficulty in meeting the country's electricity requirement as production has slowed down following the Tamil Tiger air attack on Kelanithissa power station.[/B] [B] According to Ceylon Electricity Board, several days before the air strike, the American diesel power generation company, AES Corporation, operating the plant within the premises of the existing CEB Kelanitissa Power Complex, has stopped electricity production as the Sri Lankan government has failed to meet the payments.[/B] [B] The air strike has rendered the GT 7 turbine system that was generating 115MW and another power generation system which was adding 165MW to the national system inactive.[/B] [B] “With this situation, CEB will have power cuts on all towns in Sri Lanka other than the Colombo city area as it is difficult to supply the demand at any given time,” a CEB source said. [/B] [B][SIZE=1][URL="http://www.colombopage.com/archive_08/November135841SL.html"]CP[/URL][/SIZE] [/B] [/QUOTE]
Insert quotes…
Verification
Awruddata maasa keeyada?
Post reply
Top
Bottom