Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Colombo
Red Hat Certified System Administrator (RHCSA) - RHEL 10
Sanjeewani95
Updated:
Friday at 7:43 PM
NURSING , CAREGIVER , HOTEL & BEAUTY COURSES
IVA Para Medical Campus
Updated:
Thursday at 9:24 AM
Handmade Character Soft Toys Peppa Pig Family
anil1961
Updated:
Wednesday at 9:58 PM
Ad icon
Video Content Creator
pramukag
Updated:
Jun 28, 2026
Ad icon
QA Engineer Intern
pramukag
Updated:
Jun 28, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
Why nuclear plant in Japan failed
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Miami-Vice" data-source="post: 9624575" data-attributes="member: 279482"><p><strong>Fukushima operator built nuclear plants to withstand only up to 7.9 quake</strong></p><p></p><p>Documents from Tokyo Electric, the operator of the Japanese nuclear plants in crisis after Friday's devastating quake and tsunami, reveal that the company tested the Fukushima plant to withstand a quake up to magnitude 7.9. That threshold is well below the force of Friday's quake, recently upgraded to 9.0.</p><p></p><p>Snip from Wall Street Journal:</p><p></p><p><em>Tepco's last safety test of nuclear power plant Number 1--one that is currently in danger of meltdown--was done at a seismic magnitude the company considered the highest possible, but in fact turned out to be lower than Friday's quake. The information comes from the company's "Fukushima No. 1 and No. 2 Updated Safety Measures" documents written in Japanese in 2010 and 2009. The documents were reviewed by Dow Jones. The company said in the documents that 7.9 was the highest magnitude for which they tested the safety for their No. 1 and No. 2 nuclear power plants in Fukushima.</em></p><p></p><p></p><p><a href="http://www.boingboing.net/2011/03/12/japan-fukushima-oper.html" target="_blank"></a></p><p><a href="http://www.boingboing.net/2011/03/12/japan-fukushima-oper.html" target="_blank"></a></p></blockquote><p></p>
[QUOTE="Miami-Vice, post: 9624575, member: 279482"] [B]Fukushima operator built nuclear plants to withstand only up to 7.9 quake[/B] Documents from Tokyo Electric, the operator of the Japanese nuclear plants in crisis after Friday's devastating quake and tsunami, reveal that the company tested the Fukushima plant to withstand a quake up to magnitude 7.9. That threshold is well below the force of Friday's quake, recently upgraded to 9.0. Snip from Wall Street Journal: [I]Tepco's last safety test of nuclear power plant Number 1--one that is currently in danger of meltdown--was done at a seismic magnitude the company considered the highest possible, but in fact turned out to be lower than Friday's quake. The information comes from the company's "Fukushima No. 1 and No. 2 Updated Safety Measures" documents written in Japanese in 2010 and 2009. The documents were reviewed by Dow Jones. The company said in the documents that 7.9 was the highest magnitude for which they tested the safety for their No. 1 and No. 2 nuclear power plants in Fukushima.[/I] [URL="http://www.boingboing.net/2011/03/12/japan-fukushima-oper.html"] [/URL] [/QUOTE]
Insert quotes…
Verification
Dahaya deken beduwama keeyada?
Post reply
Top
Bottom