WindForce එකෙන් නැශනල් ග්‍රිඩ් එකට 480MWh බැට්‍රි බැකප් සිස්ටම් එකක්

Tricle_Buwa

Well-known member
  • Sep 15, 2019
    12,414
    18,025
    113
    anith eka ceb eka side eken oka karanna reason eka kiwwe, peak hour ekedi ena load eka adinna home battery use karanna wage idea ekakin neda?
    mama nam hithanne eka therumak nathi idea ekak, e load eka podi podi home battery 100-1000 dala adinna ba. me wage substation level large BESS walin witharai eka karanna puluwan kiyalai.

    western province eke thama solar gahanna puluwan wealth ekak thiyena lokuma crowd eka inne & largest electricity consumption ekak thiyenneth, mata hithenawa eka nisa extra BESS western province eke gahala, rooftop solar wadiyen approve karana eka.
    Residencial hybrid හොදයි zero export දුවන්න. ඕව එලියට දීල තේරුමක් නෑ...

    මචන්ලා BESS හදනවාට වඩා pump storage power plant එකක් හදන එක ලංකාවට වඩාත් ගැලපෙනවා කියලා හිතෙන්නේ නැද්ද ? උඹලගේ මේ ගැන අදහස මොකක්ද ?
    ඕක long term වැඩක්. අනික පට්ට cost එකක් යනව. BESS හොද renevable mix එකකින් දුවද්දි support එකට ගන්න , frequency control වලට ගන්නව.

    pump storage හොදම අපේ off peak එකේදි coal ටිකේ loss එක නැති කරගෙන ඒ time එකේ pump කරගන්න.
    ------ Post added on Feb 17, 2026 at 5:47 PM
     

    nppcheguevara

    Well-known member
  • Feb 13, 2023
    8,508
    8,695
    113
    ulan bator
    එක කනුවක ආයු කාලය අවුරුදු 20ක් වගෙ. කාල ගුන බලපැම අනුව පෙති ගෙවීම අනුව පෙති උපරිම වශයෙන් අවුරුදු 20කට පාරක් මාරු කරන්න ඔන! ඔය පෙති හදන්න ෆයිබර් ග්ලාස් වලින්! එවා ප්‍රතිචක්‍රීකරනය කරන්න ක්‍රම නැහැ!



    ඇයි ඒ?
    uda balapam
    ------ Post added on Feb 17, 2026 at 5:51 PM


    ------ Post added on Feb 17, 2026 at 5:52 PM

    එක් onshore සුළං ටර්බයිනයක් (බොහෝ විට "සුළං කුළුන" ලෙස හඳුන්වන) ඉදිකිරීම සඳහා විශාල ප්‍රමාණයක ද්‍රව්‍ය සහ බලශක්තිය අවශ්‍ය වේ. මෙය ටර්බයිනයේ ප්‍රමාණය (බොහෝ විට 2–4 MW), උස, සැලසුම, ස්ථානය සහ නිෂ්පාදකයා අනුව වෙනස් වේ. නවීන utility-scale ටර්බයිනයක සාමාන්‍ය ආදර්ශයක් ලෙස 3 MW ධාරිතාවක් ගනිමු.අවශ්‍ය ප්‍රධාන ද්‍රව්‍ය (සාමාන්‍ය තක්සේරු – 2–3.5 MW ටර්බයිනයක් සඳහා)
    • කොන්ක්‍රීට් (පදනම සඳහා වැඩි ප්‍රමාණය): ටොන් 600–1,000 (සමහර විට කියුබික් මීටර් 400–600). සමහර ලොකු/පැරණි ඒවා සඳහා ටොන් 1,300 දක්වා.
    • වානේ (කුළුන, nacelle, පදනමේ rebar): ටොන් 200–400 මුළු ගණන.
      • කුළුන පමණක්: බොහෝ විට ටොන් 150–250.
      • පදනමේ rebar: ටොන් 100–165.
    • වෙනත් ප්‍රධාන ද්‍රව්‍ය:
      • ෆයිබර්ග්ලාස් / කොම්පෝසිට් (බ්ලේඩ් සහ nacelle කොටස්): ටොන් 20–50.
      • තඹ, යකඩ/කාස්ට් අයන්, ඇලුමිනියම්: ටොන් 5–20 එකතුව.
    • මුළු බර (මාර්ග/ස්ථාන සූදානම් කිරීම හැර): ටර්බයිනය + පදනම සඳහා ටොන් 800–1,700 පමණ. පදනම බරෙන් වැඩි කොටස ගනී.
    වානේ ටර්බයිනයේ බරෙන් 66–79% පමණ (පදනම හැර) ගනී. කොන්ක්‍රීට් පදනමේ බරෙන් වැඩි කොටසයි.ඉදිකිරීමට අවශ්‍ය බලශක්තිය (Embodied Energy)
    • සාමාන්‍ය තක්සේරු: කිලෝවොට් එකකට MWh 3–6 (onshore ටර්බයින සඳහා). 3 MW ටර්බයිනයකට MWh 9,000–18,000 පමණ.
    • මෙයට ඇතුළත්: ද්‍රව්‍ය උපුටා ගැනීම, නිෂ්පාදනය, ප්‍රවාහනය, ස්ථාපනය.
    • බලශක්ති ආපසු ගෙවීමේ කාලය (Energy Payback Time): හොඳ සුළං ස්ථානයකදී මාස 5–12 (බොහෝ විට මාස 6–9). එනම් ටර්බයිනය ඉදිකිරීමට යොදා ගත් බලශක්තිය එය ක්‍රියාත්මක වූ පසු ඉක්මනින් ආපසු ලැබේ.
    • 20–30 අවුරුදු ආයු කාලය තුළ එය ආයෝජනය කළ බලශක්තියට වඩා 20–50 ගුණයක බලශක්තිය නිපදවයි.
    මේ ඉහත තොරතුරු සාමාන්‍ය ඒවායි – ටර්බයින මාදිලිය (direct-drive vs geared), කුළුන උස (උස් එකකට වැඩි වානේ), පදනම් වර්ගය (මනින්න බිම්වල ගැඹුරු = වැඩි කොන්ක්‍රීට්/වානේ) සහ ප්‍රවාහන දුර අනුව වෙනස් වේ. Offshore ටර්බයිනවලට මේවාට වඩා බොහෝ ද්‍රව්‍ය හා බලශක්තිය අවශ්‍යයි.
     
    • Like
    Reactions: Rick Sanchezz

    Bam

    Well-known member
  • Apr 6, 2025
    4,660
    11
    3,246
    113
    අපේ ටැක්ස් සල්ලි වේසට් කරලා ලොකු කොම්පැණි වලට ආදායම් හදලා දෙනවා. 🥱
     

    Rick Sanchezz

    Well-known member
  • Dec 19, 2020
    7,244
    11,150
    113
    nuclear hadanna hoda site 5k lankwe dan verify karala thiyenawa. eth ithin ewa hadannath pump storage wagema thama over 8 years wage yanawa & several billions of dollars investment. anith eka e hadana country ekath ekka depend wenna wenawa for nuclear fuel. russian ekak haduwoth russia walinma fuel ganan one. trump russian nuclear fuel ban kaloth iwarai & nuclear waste export karannath one.
    anith eka political & civilians lage resistant eka nuclear power plant hadanakota. ethakota nadu gihin 8 year eka 15 years adenawa.

    ekanisa pump storage, nuclear anthima option kiyalai hithanne. eita kalin BESS & indian grid connectivity karanam hodai.
    Russian un offshore plants suggest karala tibba, Tota lnvestment eka 2 Bn mataka widihata. Bangaliyoth lagadi patha nucler plant ekak commision karanna yanne ban. 2.4 GW! SMR tamai den trend eka, hebei ekath mehe heduwoth unit ekak 27 LKR wage wenawalu.

    Oka nisa tamai China un Coal walin ain wela Wind, Solar wage renewable source walata move wenne. Hebei untath baseload ekata aniwa Loku Hydro project netnam nuclear plant ona wenawa.

    sources in Sri Lanka as of early 2026:

    Power SourceEstimated Generation Cost (LKR/kWh)
    Nuclear (SMR - Projected)27.00 – 30.00
    Current National Average (Feb 2026)29.00
    Thermal - Coal23.80 – 24.05
    Thermal - Furnace Oil82.28
    Major Hydro2.45 – 2.92
    Wind (Competitive Bidding)12.00
     

    Draco Malfoy

    Well-known member
  • Feb 9, 2019
    8,421
    16,620
    113
    Malfoy Manor, Wiltshire, England.
    Russian un offshore plants suggest karala tibba, Tota lnvestment eka 2 Bn mataka widihata. Bangaliyoth lagadi patha nucler plant ekak commision karanna yanne ban. 2.4 GW! SMR tamai den trend eka, hebei ekath mehe heduwoth unit ekak 27 LKR wage wenawalu.

    Oka nisa tamai China un Coal walin ain wela Wind, Solar wage renewable source walata move wenne. Hebei untath baseload ekata aniwa Loku Hydro project netnam nuclear plant ona wenawa.

    sources in Sri Lanka as of early 2026:

    Power SourceEstimated Generation Cost (LKR/kWh)
    Nuclear (SMR - Projected)27.00 – 30.00
    Current National Average (Feb 2026)29.00
    Thermal - Coal23.80 – 24.05
    Thermal - Furnace Oil82.28
    Major Hydro2.45 – 2.92
    Wind (Competitive Bidding)12.00
    ow, kalekata kalin russia ship wala fit karapu nuclear plant walin power eka denna. habai ithin ewa old soviet nuclear submarine, ship wala power plant repurpose karapuwa wenna one. ewa ithin aluth ewata wada risk ekak thiyenawa.
    ekanisa mama hithanne hadanawanam kelinma land eke hadana loku nuclear power plant ekak gahana eka wada hoda wei.

    ehema unath dan thathweth ekka solar & wind with BESS still cheap wei & bayath na. nuclear waste handling, awurudu 30k withara use karata passe dismantle karanna yana 5-8 years + cost ekath gaththama loku responsibilities thiyenawa.

    ekanisa mama nam hithanne mulinma
    1. solar & wind with BESS
    2. India grid connectivity
    3. pump storage
    4. nuclear

    * note: LNG power plant kihipayak hadala thiyenawa but LNG supply eka nathi nisa diesel walin duwanne. eka nisa me plant wala cost eka 80 per kwh wage yanne. patta padui. LNG awanam oka adu karaganna puluwan.
    eth LNG 2026 di lankawata power generation walata witharak ganna eka aththatama therumak nathi wadak. LNG powerplant hadanna approval nodi inna thibba 2017-2020n wage passe idan.
    but dan large cargo & cruise ships LNG walata shift wenawa HFO walin ain wela. colombo port eka hub ekak nisa aniwa ekata LNG ekak one wenawa power plant nathi unath. nathnam colombo port ekata ena eka therumak nathi wenawa, kelinma India gihin refuelling & transhipment karanna puluwan wenawa. ekanisa power generation + shipping gana dekama hithala baluwoth LNG supply ekak dan lankawata thiyena eka hodai.
     

    Rick Sanchezz

    Well-known member
  • Dec 19, 2020
    7,244
    11,150
    113
    ow, kalekata kalin russia ship wala fit karapu nuclear plant walin power eka denna. habai ithin ewa old soviet nuclear submarine, ship wala power plant repurpose karapuwa wenna one. ewa ithin aluth ewata wada risk ekak thiyenawa.
    ekanisa mama hithanne hadanawanam kelinma land eke hadana loku nuclear power plant ekak gahana eka wada hoda wei.

    ehema unath dan thathweth ekka solar & wind with BESS still cheap wei & bayath na. nuclear waste handling, awurudu 30k withara use karata passe dismantle karanna yana 5-8 years + cost ekath gaththama loku responsibilities thiyenawa.

    ekanisa mama nam hithanne mulinma
    1. solar & wind with BESS
    2. India grid connectivity
    3. pump storage
    4. nuclear

    * note: LNG power plant kihipayak hadala thiyenawa but LNG supply eka nathi nisa diesel walin duwanne. eka nisa me plant wala cost eka 80 per kwh wage yanne. patta padui. LNG awanam oka adu karaganna puluwan.
    eth LNG 2026 di lankawata power generation walata witharak ganna eka aththatama therumak nathi wadak. LNG powerplant hadanna approval nodi inna thibba 2017-2020n wage passe idan.
    but dan large cargo & cruise ships LNG walata shift wenawa HFO walin ain wela. colombo port eka hub ekak nisa aniwa ekata LNG ekak one wenawa power plant nathi unath. nathnam colombo port ekata ena eka therumak nathi wenawa, kelinma India gihin refuelling & transhipment karanna puluwan wenawa. ekanisa power generation + shipping gana dekama hithala baluwoth LNG supply ekak dan lankawata thiyena eka hodai.
    Oya LNG project eka koi kaale enna tibda ewada, wede ala une netnam cost eka tawa adui. eket mun deal daann gihilla kela une project ekata. Apita apahu large scale Hydro plant gahanna potential ekak tiyena ten wala okkoma gahala iawarai. ehema beluwath Wind & Solar laabai.

    Ara Adani ta wedi gaana denna giya wind project tikath bidding karala adu gaanata set wela. Oya area eke witarak wind gena karapu feasibility report eke tibba over 1.5-2GWh energy (annually) capacity ekak. Indian Grid tight karala Wind walin hariyata gemak gehuwoth energy export karalath gaanak hoyanna puluwan.