CEO says Boeing must acknowledge ‘our mistake’ as 737 Max 9 jets are grounded🛬

Truth Hurts

Well-known member
  • Jun 15, 2013
    11,770
    18,414
    113
    Westනාහිර
    Boeing must acknowledge “our mistake”, its CEO has said, after the cabin panel of a 737 Max 9 jet blew off during an Alaska Airlines flight last week.



    tSWN93o.jpeg

    IYgLX2f.png


    Dozens of Max 9 planes have been grounded following the incident, awaiting inspection amid heightened concerns around safety. Alaska and United Airlines have since both found loose parts on several jets.

    Regulators have stressed that passenger safety, “not speed”, will determine how soon they return to the skies.

    “We’re going to approach this – number one – acknowledging our mistake,” Dave Calhoun told Boeing employees at an all-hands meeting at its factory in Renton, Washington, where 737s are assembled, on Tuesday. “We’re going to approach it with 100% and complete transparency every step of the way.”

    He described his own reaction to a picture of Friday’s Alaska Airlines airlines flight showing the missing section of the fuselage, and his concern that someone could have been in the adjacent seat. It was, as it happened, empty.

    “I’ve got kids, I’ve got grandkids, and so do you,” Calhoun said, according to a transcript shared by Boeing. “This stuff matters. Every detail matters.”




    The plane maker’s response to the fallout from its latest crisis contrasts starkly to how it initially responded to the crashes of two Max 8 jets, in 2018 and 2019, in which 346 people were killed.

    It spent months largely failing to acknowledge blame, and a congressional report blamed a “culture of concealment” for the fatal crashes. The company later said it would have made a different decision “if we could go back”.

    Boeing has yet to finalise a set of instructions for inspections and maintenance of the grounded Max 9 jets with the Federal Aviation Administration (FAA). The group submitted an “initial version” which is now being revised following feedback, according to the agency, which pledged to conduct a “thorough review” of its plan.

    “Every Boeing 737-9 Max with a plug door will remain grounded until the FAA finds each can safely return to operation,” the FAA said in a statement issued shortly before Calhoun was due to address employees. “The safety of the flying public, not speed, will determine the timeline for returning the Boeing 737-9 Max to service.”

    Boeing said: “We continue to be in close contact with our customers and the FAA on the required inspections. As part of the process, we are making updates based on their feedback and requirements.”


    https://www.theguardian.com/busines...unded-safety-faa-alaska-airline-flight-update
     
    Last edited:

    dxx

    Well-known member
  • Dec 26, 2011
    14,507
    17,162
    113
    ඒ වුනාට අැමරිකන් බඩු චුපිරි.ඔය ප්ලේන් ඵක සති ගාණයි නේ පරණ..ඕකේ අැණ මුරිච්චි හයි කරන කෙනාට ඔළුව අවුල් වෙන විදිහේ කෝල් ඵකක් ඵන්න අැති වයිෆ්ගෙන් ඒ වැඩේ කරන වෙලේ..ඒකයි ඔතන අැණේ පොඩ්ඩක් හිර වෙලා මදි නිසා උඩදී ගැලවෙන්න අැත්තේ..🙁
     
    • Love
    Reactions: EVC