Current eka thibeda?

HKavinda

Well-known member
  • Dec 23, 2013
    53,831
    19,965
    113
    Panadura
    අපිට අද උදේ 8 ඉදන් හවස 2.30 වෙනකම් කැපුවා. 2.30 ඉදන් 6. වෙනකම් කැපුවා. 6.10 ඉදන් 7.15 වෙනකම් කැපුවා. 7.15 ඉදන් තවම කැපුවේ නෑ

    :baffled: :baffled: :baffled:
     

    Hyaenidae

    Well-known member
  • Apr 8, 2015
    52,340
    2
    53,781
    113
    අපිට උදේ 9 ට වගේ කපල 10 ට වගේ එව්ව

    12 - 12.10 වගේ කපල 12.30 ට වගේ ආව (ඒ නං කපල නෙමෙයි වෙන අවුලක් වෙන්න ඇති)
     

    Kevin_Fdo

    Well-known member
  • Jan 12, 2019
    4,660
    2,097
    113
    𝟷𝟸𝟽.𝟶.𝟶.𝟷
    The Cabinet of Ministers has granted approval for a proposal to build a 100 MW floating solar power plant in the Maduru Oya Reservoir.

    Previously, the approval has been granted to act on this proposal as a joint project of the Mahaweli Authority of Sri Lanka, the Ceylon Electricity Board, and the Sri Lanka Sustainable Energy Authority.

    The government of Canada has proposed to implement this plan as a solar energy storage project using solar panels and batteries which can store electricity. Accordingly, permission has been granted to establish a joint venture with Canadian Solar Inc. and to appoint a joint action committee to conduct discussions on this.

    This proposal has been presented to the Cabinet jointly by the Minister of Mahaweli Development and Environment President Maithripala Sirisena and the Minister of Power, Energy, and Business Development Ravi Karunanayake.

    - Ada Derana :rolleyes: