Hoover Dam Bypass

hansa1018

Member
Sep 9, 2008
13,509
1,621
0
Colombo
Construction of the Colorado River Bridge is advancing on the 1,060 foot twin-rib concrete arch.
The Colorado River Bridge is the central portion of the Hoover Dam Bypass Project.
Construction on the nearly 2,000 foot long bridge began in late January 2005 and the completion of the entire Hoover Dam Bypass Project is expected in Late 2010.
When completed, this signature bridge will span the Black Canyon (about 1,500 feet south of the Hoover Dam), connecting the Arizona and Nevada Approach highways nearly 900-feet above the Colorado River.

91574185.jpg


39669348.jpg


81861688.jpg


22836118.jpg


78075853.jpg


50975450.jpg


17817177.jpg


39410809.jpg


57816397.jpg


97741899.jpg


69811194.jpg


37717770.jpg


33289270.jpg


98763530.jpg


85946451.jpg


67096293.jpg


53958350.jpg


72927159.jpg


96475305.jpg


40994130.jpg


16865012.jpg


47774348.jpg


74144657.jpg


25000863.jpg


32040961.jpg


85718410.jpg


99803890.jpg
 

rajitha_ks

Well-known member
  • Jan 13, 2009
    8,856
    1,305
    113
    that's totally unbelievable! amazing that 5 foot smart monkeys (yes that's us) are doing this

    +rep