Search
Search titles only
By:
Search titles only
By:
Log in
Register
Search
Search titles only
By:
Search titles only
By:
Menu
Install the app
Install
Forums
New posts
All threads
Latest threads
New posts
Trending threads
Trending
Search forums
What's new
New posts
New ads
New profile posts
Latest activity
Free Ads
Latest reviews
Search ads
Members
Current visitors
New profile posts
Search profile posts
Contact us
Latest ads
Ad icon
Jobreceive.com for sale
Blogerwiki
Updated:
Tuesday at 8:55 PM
Post Your Vehicle for Sale — FREE! - https://libro.lk
Kalu_Puth
Updated:
Tuesday at 7:38 PM
ඔයාගෙ Assignment හෝ Thesis එක හරියට හදාගමු
ErMurazor
Updated:
Saturday at 10:52 PM
Ad icon
BlackWall V2ray servers
hu KANNA
Updated:
Sep 23, 2026
Peppa Pig Family Plush Toy Set – 5 Characters
anil1961
Updated:
Sep 19, 2026
Electronics
Vehicles
Property
Search
Reply to thread
Forums
General
ElaKiri Talk!
IOC සහ Petroleum
Get the App
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="mmrizmy" data-source="post: 26544378" data-attributes="member: 12363"><p>මේක බලන්න මයේ අම්ම </p><p></p><p><a href="https://en.wikipedia.org/wiki/Chunnakam_Power_Station" target="_blank">https://en.wikipedia.org/wiki/Chunnakam_Power_Station</a></p><p></p><h3>Early history</h3><p>In 1947 the Department of Industries in Ceylon agreed to meet the electricity demand of the <a href="https://en.wikipedia.org/wiki/Jaffna_peninsula" target="_blank">Jaffna peninsula</a>, which at that time stood at only 370 kW, from the power station at Kankesanthurai cement factory.<a href="https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-Fernando-2" target="_blank">[2]</a> From 1950 the peninsula was supplied by an isolated Medium Voltage (MV) <a href="https://en.wikipedia.org/wiki/Electric_power_transmission" target="_blank">power transmission</a> network operated by the Department of Government Electrical Undertakings.<a href="https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-UN-3" target="_blank">[3]</a><a href="https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-Yoganathan-4" target="_blank">[4]</a><a href="https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-SARIEI-5" target="_blank">[5]</a> At the time <a href="https://en.wikipedia.org/wiki/Jaffna" target="_blank">Jaffna</a> was the only major town on the peninsula with electricity supply.<a href="https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-Fernando-2" target="_blank">[2]</a> Demand for electricity in the peninsula grew as other towns were connected to the electricity network and with increasing demand from industries, such as Kankesanthurai cement factory, and from agriculture.<a href="https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-Fernando-2" target="_blank">[2]</a><a href="https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-UN-3" target="_blank">[3]</a><a href="https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-MPEA-6" target="_blank">[6]</a> By the mid 1950s demand on the peninsula stood at 1,500 kW and was expected to increase to 2,000 kW.<a href="https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-Fernando-2" target="_blank">[2]</a> Jaffna peninsula was not connected to the national grid and as such could not benefit from Ceylon's growing hydroelectric generation.</p></blockquote><p></p>
[QUOTE="mmrizmy, post: 26544378, member: 12363"] මේක බලන්න මයේ අම්ම [URL]https://en.wikipedia.org/wiki/Chunnakam_Power_Station[/URL] [HEADING=2]Early history[/HEADING] In 1947 the Department of Industries in Ceylon agreed to meet the electricity demand of the [URL='https://en.wikipedia.org/wiki/Jaffna_peninsula']Jaffna peninsula[/URL], which at that time stood at only 370 kW, from the power station at Kankesanthurai cement factory.[URL='https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-Fernando-2'][2][/URL] From 1950 the peninsula was supplied by an isolated Medium Voltage (MV) [URL='https://en.wikipedia.org/wiki/Electric_power_transmission']power transmission[/URL] network operated by the Department of Government Electrical Undertakings.[URL='https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-UN-3'][3][/URL][URL='https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-Yoganathan-4'][4][/URL][URL='https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-SARIEI-5'][5][/URL] At the time [URL='https://en.wikipedia.org/wiki/Jaffna']Jaffna[/URL] was the only major town on the peninsula with electricity supply.[URL='https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-Fernando-2'][2][/URL] Demand for electricity in the peninsula grew as other towns were connected to the electricity network and with increasing demand from industries, such as Kankesanthurai cement factory, and from agriculture.[URL='https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-Fernando-2'][2][/URL][URL='https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-UN-3'][3][/URL][URL='https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-MPEA-6'][6][/URL] By the mid 1950s demand on the peninsula stood at 1,500 kW and was expected to increase to 2,000 kW.[URL='https://en.wikipedia.org/wiki/Chunnakam_Power_Station#cite_note-Fernando-2'][2][/URL] Jaffna peninsula was not connected to the national grid and as such could not benefit from Ceylon's growing hydroelectric generation. [/QUOTE]
Insert quotes…
Verification
Haya warak paha keeyada? (haya wadi kireema paha)
Post reply
Top
Bottom